Modern Specification Office Furniture Melamine Board Conference Room Tables
Product description
Product name | Conference table | |
Brand name | BUNGE | |
Brand name | Guangzhou, Guangdong, China | |
Size | Length | 1800/2000/2400/2800/3200/3600/4000/4800 |
Width | 1000/1200/1400 | |
Height | 750 | |
Material | E1 Melamine panel | |
Port of loading | Guangzhou/Shenzhen | |
Delivery time | 20-30 days after receiving payment | |
Installation | Disassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos) | |
Package | High resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box | |
Service | Support color and size customization, please contact customer service for details! |
Advantages
1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using;
2--Firmer frame,enable it can support maximum strength in public;
3--Detachable structure, so more quantity in container is allow,save your shipping cost;
4--Easy for installation, All accessories and screws will be along with goods;
5--Plastic footpad under frame to keep the ground out of scratching;
6--BUNGE colour options available are Green,Light Gray,or as your request.
Packaging & Shipping
Detailed Packing:
1. KD packing.
2. Shipping marks can be decided by customers.
3. Outside: thick carton to reduce extrusion & collision in transit.
4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.
Shipping Details:
1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.
2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.
3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.
We offer
1.Molding workshop
2.Aluminum-extrusion workshop
3.Injection and die-casting workshop
4.Ironware workshop
5.Anodized workshop
6.Powder coating workshop
7.Assembling workshop.
All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.
So our product are high-quality with affordable price. That means cost-effective.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.