product-EBUNGE-img
Home  > PRODUCTS  > 

Modern Office Workstation Desk Comfortable Ergonomic Fabric Office Chair Executive

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Modern Office Workstation Desk Comfortable Ergonomic Fabric Office Chair Executive-im
product-Modern Office Workstation Desk Comfortable Ergonomic Fabric Office Chair Executive-EBUNGE-im-1
product-EBUNGE-img-1
product-EBUNGE-img-1

Modern Office Workstation Desk Comfortable Ergonomic Fabric Office Chair Executive

Model
Office chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office chair
Feature: Swivel Seat
Finish: Fabric, pu leather, mesh
Application: Office, conference room and etc
General use: Office furniture
Material: Nylon and mesh cushion
Function: Swivel Seat
Size: Standard Size
Color: Can be customized
Style: Modern style

Office Workstation Desk Comfortable Ergonomic Fabric Office Chair Executive

 

Description

Fabric office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and color amercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

14.jpg

Techincal Information


Product Type:

Fabric Office chair

Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment   

4.Adjustable                                                         

5.3D Armrest And PU Armrest Panel                       

6.Polishing  Aluminum Alloy Metal Feet

Color:

Back and seat color can be custom designed

Warranty:

5-10 Years

Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

conference room chair (1).jpgconference room chair (2).jpgconference room chair (3).jpg

Feature


Office chair function &feature:

 

(1)Ergonomically designed for lasting comfort,you can adjust the backrest to any position up to 45 degrees.

 

(2)Fire-Resistance mesh fabric upholstered, different colors for option.

 

(3)3D adjustable armrest.

 

(4)Multifunctional tilt mechanism.

 

(5)Imported gas lift.

 

(6)Aluminum base.

 

(7PU plastic castors.

 

(8)Waterfall seat edge helps relieve pressure points on legs.

 

  

 Different color shows office furniture:

 

7.jpg


Office chair advantage:

 

1.360 degree swivel function.

 

2.Good durabilty with breath ability.

 

3.Easily cleaned.

 

4.Strong 5 castor-wheel base.

 

5.Color can be changed according to customer requirement.


Installing


 19.jpg

Packing


office chair packing.png

We can offer


1. High quality at cost effective price.


2. Custom design and manufacturing according to your CAD drawing.


3. One-step full package office furniture solution:


Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.


4. Warranty is about 5-10 years to supply service.


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...