product-EBUNGE-img
Home  > PRODUCTS  > Office Furniture  > 

Modern Office Chair Stainless Steel Leg Pu Leather Office Public 3 seater Waiting Chair for Hospital

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Modern Office Chair Stainless Steel Leg Pu Leather Office Public 3 seater Waiting Cha
product-Modern Office Chair Stainless Steel Leg Pu Leather Office Public 3 seater Waiting Chair for -1
product-EBUNGE-img-1
product-EBUNGE-img-1

Modern Office Chair Stainless Steel Leg Pu Leather Office Public 3 seater Waiting Chair for Hospital

Model
Office waiting chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office waiting chair
Feature: Sitting Comfortably
Finish: Pu leather,mesh,fabric and etc
Application: Airport, bank,hospital
General use: Office furniture
Material: Fabric,Nylon,Stainless
Function: Seat Height Adjustable
Size: 1740*670*770mm,customized size
Color: Multi color
Style: Modern style

Stainless Steel Leg Pu Leather Office Public 3 seater Waiting Chair for Hospital


Description:



1.Waiting chair Seat and back: Made from top quality steel perforated cold-rolled stipulate after antitrust dealing- Electronic polishing- Static coating(any colors), thickness is 1.5mm, 50width.


2. Arms and legs: Top quality steel, Die casting- Deep drawing steel plate - High strength jointing - Polishing, thickness is 1.5mm.


3. Beam and bracket: Made from top quality steel after required cutting perforating welding antitrust dealing--static coating, thickness is 2.0mm.


1.jpg


Technical information:


NameOffice waiting chairs
Stylemodern , special design
Materialsteel,stainless steel,aluminum
Colorcustomization
Dimension

One seater:640*670*780

Two seaters:1220*670*780

Three seaters:1800*670*780

Four seaters:2380*670*780

Five seaters:2960*670*780

Packingcarton,wooden case
ApplicationPublic chair,waiting chair,airport chair, hospital chair,bank chair.
PackingComplete knocked-down


4.jpg


Office waiting chair advantage:


1. PU cushion.


2. Steel or aluminum alloy leg.


3. Every model have 1 seat, 2seats, 3seats, 4seats, 5seats, if you need we can add a tea table on it, any position is ok.


4. Each seat can be with armrest.



5.jpg


Feature:


1.Corner with 1.3mm thickness perforated stainless steel plate;


2.1.2mm stainless steel, welded, the appearance of fine and durable.


3.The use of innovative curved back, increase comfort while losing fashion.


4.The use of high-quality aluminum alloy edge design, scratch, more durable.


5.Ergonomic, sit down when the legs to achieve the best and comfortable angle.


6.Super milk feet, protect the ground without damage, to avoid the noise generated by friction.


Packing and shipping:


Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.



1.For mass production big quantity by sea : We've cooperated with our shipping forwarder for many years, and
they can offer us the competitive price by the vessels such as PIL, APL, OOCL, CSCL, MSC and CMA and so on.


2.Import taxes : We can help you reduce and avoid import taxes by declaring prices low.


office workstation packing



We can offer:


1. High quality at cost effective price.


2. Custom design and manufacturing according to your CAD drawing.


3. One-step full package office furniture solution:


Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.


4. Warranty is about 3-5 years to supply service.

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...