EBUNGE
Home  > PRODUCTS  > Office Furniture  > 

Modern Conference Room Modular Workstations, Tables and Cubicles for office

EBUNGE-Modern Conference Room Modular Workstations, Tables and Cubicles for office
EBUNGE
EBUNGE
Modern Conference Room Modular Workstations, Tables and Cubicles for office-EBUNGE
Modern Conference Room Modular Workstations, Tables and Cubicles for office-EBUNGE

Modern Conference Room Modular Workstations, Tables and Cubicles for office

Model
BG modular office workstations
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Modular office workstations
Feature: Eco-friendly
Finish: Melamine,veneer,metal
Application: Office,conference room,meeting room
General use: Office furniture
Material: MFC Board
Function: Office Work,office partitions
Size: Accept customized
Color: Can be customized
Style: Modern

Modern Conference Room Modular Workstations, Tables and Cubicles for office

Office Workstations Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables


Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-1

Office Workstations Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office workstations should be tested before delivering out producing workshop.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-2


Office Workstations Finishing

There are 3 kinds of finishes to choose:

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Office Furniture Sets, Modern Conference Room Modular Workstations, Tables-5


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...