movable wall- folding partition-operalbe wall-EBUNGE
Home  > PRODUCTS  > 

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

EBUNGE
EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom
Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-movable wall, folding partition,operalbe wall-EBUNGE
EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom
movable wall- folding partition-operalbe wall-EBUNGE
Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-movable wall- folding partition-operalbe wall-EBUNGE

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

Model
Office conference table
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
500 Set/Sets per Month
MOQ
No MOQ
Packing Details
Carton packing with wooden frame
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office conference table
Feature: Fine Workmanship
Finish: Melamine,MFC board
Application: Conference room,meeting room,office
General use: Office furniture
Material: MFC board
Function: Fireproof and eco-friendly Divide space
Size: 2400*1200*750 mm
Color: Can be customized
Style: Modern style

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

Description


Conference table has special from others, that is all the edges sealed with high quality PVC 2 mm , the glue used for the laminated which is imported from Germany , friendly for the environment .All the hardware parts are good quality ,strong and durable.


EBUNGE-Best Movable Partition Modern Commercial Furniture Mfc Melamine Wooden


EBUNGE-Best Movable Partition Modern Commercial Furniture Mfc Melamine Wooden-1

EBUNGE-Best Movable Partition Modern Commercial Furniture Mfc Melamine Wooden-2

EBUNGE-Best Movable Partition Modern Commercial Furniture Mfc Melamine Wooden-3

Technical information

 

PRODUCT  NAME

Conference table

MODELN   NO.

BUNGE conference table

DIMENSION

Standard sizeor as your require

FEATURE

Style: Meeting table Advantages
1. Squared shape Meeting table.

2. Surface material: Veneer surface thickness for 0.3-0.6mm

3. Veneer material can choose walnut/beech/cherry/oak etc. 

4. Basic material: MDF Veneer.

5. Tabletop normal thickness for 25mm-70mm, Special thickness as your requirement.

6. Expandable and available in numerous sizes.

7. Wire management, hardware accessories are BMB.

PACKING

1.KD(knock down).

2.REGULAR 7 YEARS EXPORT STANDARD PACKAGE.

3.MAINLY WITH CARTON,NECESSARY PROTECTION MATERIAL INSIDE.

TERMS OF PAYMENT

FOB, T/T (30% IN ADVANCE), CIF, EXW. western union money gram

PORT

GUANGZHOU

DELIVERY TIME

8-25 DAYS ONCE ORDER CONFINE  AND RECEIPT OF ADVANCED PAYMENT


 14.jpg

Advantage

1--Office table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.


 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 


Packing

 

4 - .jpg

Factory show


parking option.jpg

Our service

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE-Best Movable Partition Modern Commercial Furniture Mfc Melamine Wooden-8 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office ch

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-2 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-3 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-4 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-6 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-7 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-8 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-9 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-10 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-11 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-13 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-14 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-15 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-16 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-17 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-18 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-20 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-21 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-22 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-23 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-24 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-25 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-27 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-28 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-29 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-30 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-31 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-32 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-34 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-35 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-36 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-37 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-38 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-39 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-41 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-42 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-43 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-44 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-45 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-EBUNGE-46 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-48 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-49 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-50 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-img-51 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg

 parking option.jpg

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

product-EBUNGE-Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom-52 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

14.jpg14.jpg14.jpg

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

13.jpg

 

Packing details:

 

 

 

4 - .jpg