EBUNGE  > 

AI - Page Sitemap

 > 

melamine office conference table factory for boardroom

melamine office conference table factory for boardroom

Melamine office conference table factory for boardroom

Model
BG conference room tables
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union also available
Delivery Time
7 - 15 days
Supply Ability
50000 sets per month
MOQ
No MOQ, small quantity welcome
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Conference room tables
Feature: Modern conference tables
Finish: Melamine
Application: Meeting room tables
General use: Office furniture
Material: Metal structure+melamine
Function: Office staff work
Size: 2400*1200 mm, accept customized
Color: Optional
Company Advantages
1. EBUNGE office conference table is produced using carefully selected raw materials. These materials will be processed in the molding section and by different working machines to achieve the required shapes and sizes for furniture manufacturing. There are various colors offered for the product
2. People can easily erect it up by pumping it up with an electric blower, and they easy to take it down and storage when they are not using it. Defects will not be founded in the product after it is strictly inspected
3. The product features great stacking flexibility. Its overhead track system – specific aluminum alloy rails to flexibly meet the necessary stacking requirements. It is widely used for privacy protection

Commercial Office Furniture Meeting Room Negotiation Wooden Table Tops Melamine Conference Boardroom Tables 


Product description

Product nameConference table
Brand nameBUNGE
Brand nameGuangzhou, Guangdong, China
SizeLength1800/2000/2400/2800/3200/3600/4000/4800
Width1000/1200/1400
Height750
MaterialE1 Melamine panel
Port of loadingGuangzhou/Shenzhen
Delivery time20-30 days after receiving payment
InstallationDisassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos)
PackageHigh resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box
ServiceSupport color and size customization, please contact customer service for details!

melamine office conference table factory for boardroom-1

Advantages

1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

melamine office conference table factory for boardroom-2

melamine office conference table factory for boardroom-3

melamine office conference table factory for boardroom-4

melamine office conference table factory for boardroom-5


Packaging & Shipping

Detailed Packing:


1. KD packing.


2. Shipping marks can be decided by customers.


3. Outside: thick carton to reduce extrusion & collision in transit.


4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.


Shipping Details:


1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.


2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.


3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

melamine office conference table factory for boardroom-6

melamine office conference table factory for boardroom-7




We offer

1.Molding workshop

2.Aluminum-extrusion workshop

3.Injection and die-casting workshop

4.Ironware workshop

5.Anodized workshop

6.Powder coating workshop

7.Assembling workshop.

All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.

So our product are high-quality with affordable price. That means cost-effective.

melamine office conference table factory for boardroom-8




Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a fully advanced office conference table manufacturer and supplier. Over the years of hard working, we have been maintaining good collaboration with the customers in many fields of the industry. We have been recognized by the vast majority of them for the strong R&D capacity.
2. Our company has cultivated many specialized technical support engineers. They are qualified with abundant expertise and experience. This enables them to help solve technical issues or assist customers with their external tech issues through phones or computers.
3. Our project management team is the core strength of our company. They can make the best use of time to manage the deadline for our projects in the right manner. Our commitments to closed-loop sustainability, constant innovation, and imaginative design will contribute our being an industry leader in this field. Inquire!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...