product-conference room tables-EBUNGE-img
Home  > PRODUCTS  > Office Furniture  > Conference Table  > 

Meeting Room Furniture Steel Structure Office Executive Wooden Melamine Conference Tables and Chairs

product-EBUNGE-img
product-EBUNGE-conference room tables-img
product-EBUNGE-img
product-EBUNGE-Meeting Room Furniture Steel Structure Office Executive Wooden Melamine Conference Ta
product-Meeting Room Furniture Steel Structure Office Executive Wooden Melamine Conference Tables an-1
product-conference room tables-EBUNGE-img-1

Meeting Room Furniture Steel Structure Office Executive Wooden Melamine Conference Tables and Chairs

Model
BG conference room tables
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union also available
Delivery Time
7 - 15 days
Supply Ability
50000 sets per month
MOQ
No MOQ, small quantity welcome
Packing Details
Paper carton outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Conference room tables
Feature: Modern conference tables
Finish: Melamine
Application: Meeting room tables
General use: Office furniture
Material: Metal structure+melamine
Function: Office staff work
Size: 2400*1200 mm, accept customized
Color: Optional

Meeting Room Furniture Steel Structure Wooden Melamine ConferenceTables and Chairs


Product description

Product nameConference table
Brand nameBUNGE
Brand nameGuangzhou, Guangdong, China
SizeLength1800/2000/2400/2800/3200/3600/4000/4800
Width1000/1200/1400
Height750
MaterialE1 Melamine panel
Port of loadingGuangzhou/Shenzhen
Delivery time20-30 days after receiving payment
InstallationDisassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos)
PackageHigh resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box
ServiceSupport color and size customization, please contact customer service for details!

EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors | Ebunge

EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-1

Advantages

1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.



EBUNGE-Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-1


EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-3

EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors | Ebunge-4


Packaging & Shipping

Detailed Packing:


1. KD packing.


2. Shipping marks can be decided by customers.


3. Outside: thick carton to reduce extrusion & collision in transit.


4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.


Shipping Details:


1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.


2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.


3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.


EBUNGE-Movable Partition Manufacturer, Style Movable Partitions | Ebunge-5

EBUNGE-Movable Partition Manufacturer, Style Movable Partitions | Ebunge-6




We offer

1.Molding workshop

2.Aluminum-extrusion workshop

3.Injection and die-casting workshop

4.Ironware workshop

5.Anodized workshop

6.Powder coating workshop

7.Assembling workshop.

All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.

So our product are high-quality with affordable price. That means cost-effective.

EBUNGE-Movable Partition Manufacturer, Style Movable Partitions | Ebunge-9



Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...