Meeting Room Partition Walls

Home  > APPLICATION  > Meeting Room Partition Walls  > 

Meeting Room Fire Resistant Movable Acoustic Sliding Partition Walls

Meeting Room Fire Resistant Movable Acoustic Sliding Partition Walls

Meeting Room Fire Resistant Movable Acoustic Sliding Partition Walls

Model
85 mm movable partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition walls
Feature: Sound proofing
Partition material: MDF+Melamine
Finish: Melamine
Application: Office,conference room,meeting room
General use: Commercial furniture
Material: 100% Polyester Fiber
Function: Divide the space
Size: As request
Color: Can be customized
Style: Sliding doors

Meeting Room Fire Resistant Movable Acoustic Sliding Partition Walls

Finished Project

To be general, BUNGE Factory has 10+ years experience in the line of sliding partition walls. The sliding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding

Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm sliding partition walls ONLY FOR $85.

 

85 mm sliding partition walls ONLY FOR $98.

 

100 mm sliding partition walls ONLY FOR $118.

 

125 ultra-high system sliding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-1

Product Description


  • The sliding partition walls consist of a series of concave/convex profile interlocking flat panels and the fast set retractable top and bottom seals ,its provide excellent acoustic insulation property of from STC-32 to 53 in laboratory setting.

  •  

  • Its high performance per dollar value and the easiest in-field operation makes it very suitable for Hotel, banquet hall, conference room ,ballroom, muti-function hall, restaurant,classroom,office,religion,dance studio ,shopping arcades and many other place where seek for space divide with good soundproof performance.

  •  

  • There are wide of range face finishes are available :melamine faced MDF or plywood, fabric, carpet, fabric, artificial, leather,wood veneer, high pressure laminate,Formica ,acoustic panel,white boad ect., Panels can also be supplied unfinished for field decoration,Standard frame color is clear anodized aluminum,custom powder coating colors are available.

  •  

  • Increasingly, flexible and efficient space utilisation is becoming a must for offices, hotels, exhibition centres, studios and similar. With our sliding partition walls system, you can have more choice to arrange your space rather than a room. Is not only provide visual insulation but also sound insulation which give you a more private space, the sound insulation could be 35dB to 55dB, as well as a concreat wall.

  •  

  • Sliding partition wall is made of high quality anodized aluminum frame with environmentally composite materials.The sliding partition walls panels move on a ceiling track with no requirement of floor guides or rails which provide you a better environment.

Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-2
Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.

Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-4

Components of Sliding Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the movable partition walls with wheels.

Wheels/Rollers:  It is the carrier for the movable partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the movable partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-5Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-6

Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-7

Parking Styles of Sliding Partition Walls

As you know, when we do not use the sliding partition walls, we can park them to the parking area. Actually there are many parking styles for the sliding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-8Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-9

Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-10

Different Finishes of Sliding Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

  • Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-11Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-12

    Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-13

Package for Sliding Partition Walls
  • Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-14Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-15

    Bunge-Movable Room Dividers, Meeting Room Fire Resistant Movable Acoustic Sliding-16


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...