mdf building sound suppression panels Bunge Brand

mdf building sound suppression panels Bunge Brand
  • mdf building sound suppression panels Bunge Brand
  • mdf building sound suppression panels Bunge Brand
  • mdf building sound suppression panels Bunge Brand
  • mdf building sound suppression panels Bunge Brand
  • mdf building sound suppression panels Bunge Brand
  • mdf building sound suppression panels Bunge Brand

mdf building sound suppression panels Bunge Brand

Model
BG perforated wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated wall panels
Feature: Sound proofing
Aluminium frame thickness: 12,15,18 mm
Partition material: Black fleece
Finish: Melamine,fabric,metal
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Fireproof and eco-friendly
Size: 2440*1220 mm, 1220*600 mm
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has built a professional management team to provide a strong guarantee for opening up the market.
  • Guangdong Bunge Building Material Industrial Co.,Ltd insists that service is the basis of survival. We are committed to providing professional and quality services.
  • Guangdong Bunge Building Material Industrial Co.,Ltd abides by the enterprise spirit, which is diligent to think, courageous to challenge, and dare to innovate. We develop a business based on sincerity-based management and innovation. Relying on talents and technological advantages, we improve our core competitiveness and strive to become a leading company in the industry.
  • In the past years, Guangdong Bunge Building Material Industrial Co.,Ltd has constantly learned advanced production technology and has gradually improved the corporate image. Now we obtain remarkable achievements and enjoy a good reputation in the Manufacturing Decoration Materials industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd sets lots of sales outlets in China based on complete sales network. Besides, we have cooperation with large domestic enterprises.
Product Comparison
Well-chosen in material, fine in workmanship, excellent in quality and favorable in price, Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions is highly competitive in the domestic and foreign markets.Guangdong Bunge Building Material Industrial Co.,Ltd runs multi fully automated production lines and produces movable walls according to the national building materials standard. Diverse in product line and favorable in price, our products are safe and eco-friendly and enjoy a wide recognition in the market. They are available in a wide range of styles and specifications for various scenarios. Choosing the right product can bring its maximum effect and create a good user experience.After being improved greatly, Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions is more advantageous in the following aspects.
  • Bunge-Best Acoustic Soundproofing Panels 12 Mm Mdf Acoustic Ceiling And Wall
    Bunge-Best Acoustic Soundproofing Panels 12 Mm Mdf Acoustic Ceiling And Wall-1
Company Advantages
1. Bunge sound suppression panels is an innovation-oriented product with improvement on production process. Every corner and edge of the product are carefully processed
2. The quality of this product is improved and enhanced by Bunge. Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function
3. The quality of this product is backed by well-established infrastructure. The product ensures a safe user experience
4. Bunge has obtained fame and reputation in sound deadening panels market. It can divide a large space into small spaces for effective space utilization
5. Guangdong Bunge Building Material Industrial Co.,Ltd has won the regular customers' support and trust because of our rich experience in noise reduction panels. It adopts the high-performance MDF board and rockwool panel

12 mm MDF Acoustic Ceiling and Wall Boards Soundproof Perforated Wall Panels

Perforated Wall Panels Features

1 Perforated wall panel  is a kind of resonance absorption material with holes through on the quality MDF board.


2 Perforated wall panel has strong selection on the sound spectrum and particular great performance on the middle and low frequency.


3 Perforated wall panels filled with the acoustic cotton at the back side space of the acoustic panel, it has better performance on the middle and high frequency.


4 The holes diameter and pitch can be custom made.


5 Strong impact resistance, excellent decorate performance, elegant color, especially work for wooden construction.


 

Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction

Technical Information
Model typeE16/6,E32/6,V32/6,E35/1.5-10,V32/3-10
Size600*600,1200*600,2400*1200mm
Thickness12,15,18mm
Finishmelamine, veneer, metal finish, acrylic, PU leather,
paintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter
Backside finishAcoustic felt, woven fabric
Fireproof gradeGB8624 2012 A,B1,B2,B3
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Depth of groove7mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree speciesMaple, cherry, Oak, teak, walnut, ashtree, sabelli, birch,
CertificationBV,CE,SGS,ISO9001-2008,
Test reportEco protection, sound absorption, flame retardant

Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-1

Perforated Wall Panels Applications

We specialize in full range of acoustic and decorative materials, such as wood wool acoustic panel, wooden timber acoustic panel, polyester fiber acoustic panel, fabric acoustic panel, carved panel, decorative panel, waved panel, diffuser, bass trap, etc. In addition, we also produce the movable partition walls,glass partitions,office furniture and some aluminum profiles.

 

The perforated wall panels are widely used in the music hall, opera house, theater, cinema,Multifunctional hall, KTV, as well as art gallery, hotel, library, etc. Which needs sound Effect requirements and high grade decoration tastes of the public facilities And cultural venues, etc.



Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-2

Perforated Wall Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Quality Sound Deadening Panels Acoustic Panels For Noise Reduction-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Bunge is developed by Guangdong Bunge Building Material Industrial Co.,Ltd with the great influence in the field of sound deadening panels.
2. Our produced noise reduction panels enjoys good warranty and maintaince period to be responsible for you.
3. Guangdong Bunge Building Material Industrial Co.,Ltd aims at making constant innovations in noise cancelling wall panels field. Check now!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...