Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Top Grooved Wooden Acoustic Panels Company  > 

material building sound absorbing panels timber Bunge

material building sound absorbing panels timber Bunge

material building sound absorbing panels timber Bunge
  • material building sound absorbing panels timber Bunge
  • material building sound absorbing panels timber Bunge
  • material building sound absorbing panels timber Bunge
  • material building sound absorbing panels timber Bunge
  • material building sound absorbing panels timber Bunge
  • material building sound absorbing panels timber Bunge

material building sound absorbing panels timber Bunge

Model
BG acoustic wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Grooved acoustic wall panels
Feature: Sound proofing
Aluminium frame thickness: 12,15,18 mm
Partition material: Black fleece
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a high-quality staff team. The team members are professional, efficient, pragmatic, and excellence-seeking. They focus on their own duties and make concerted efforts to produce high-quality products.
  • Guangdong Bunge Building Material Industrial Co.,Ltd adopts the strategy of the two-way interaction between enterprise and consumer. We gather timely feedback from dynamic information in the market, which enables us to provide quality services.
  • Guangdong Bunge Building Material Industrial Co.,Ltd will invest heavily in corporate culture construction while attaching importance to economic benefits. Moreover, we carry forward our enterprise spirit of 'unity, kindness, and mutual benefit'. With a focus on integrity and innovation, we strive to improve our core competitiveness, so as to provide consumers with more high-quality products. The final goal is to make a great contribution to sustainable development in the industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd was founded in . After years of pioneering and innovation, we not only accumulate rich production experience of movable walls but also enjoy a good corporate image. We are leading the new trend of development in the Manufacturing Decoration Materials all the way.
  • At present, Guangdong Bunge Building Material Industrial Co.,Ltd's business range covers multiple regions in the country. We also strive to open up overseas market based on the mature domestic market.
Company Advantages
1. sound absorbing panels has achieved breakthroughs in technology and style varieties. The product greatly highlights its easy installation
2. The product has stable quality and superior performance. It adopts the high-performance MDF board and rockwool panel
3. Overall, a high quality soundproof wall panels always attracts many customers. Equipped with a sealing device, the product is praised for its tight sealing performance

Melamine Finish Grooved MDF Sound Proof Acoustic Wooden Wall Panels

Wooden Grooved Acoustic Panels Features


1. Scientific industry : Made according to acoustic theory,excellent at reducing noises,especially effective for absorbing high and middle frequency noises.


2. Artistic products : Natural wood ,which may be carved according to your taste.


3. Environment-friendly : All the materials conform to the country's environmental protection standards,little wood alcohol is contained.Its natural wood is fragrant.


4. Fireproof : fireproof degree B1- the highest for wood.It has already been tested by authoritative organization.


5. Moistureproof and mildewproof : It is made of high density moistureproof  and mildewproof material.


6. Easy to install : Dragon bone construction is applied.


7. Industrial production : No more an extensive production,automatically controlled by computers,standardized and large scale production,improved is production capability and ensured is products quality.

 

Bunge-High-quality Soundproof Wall Panels | Bunge Soundboard Panels

Technical Information
Model type28/4,30/2,29/3,14/2,13/3,59/5,5/3,40/3
Size133*2440 mm
Thickness12,15,18mm
FinishMelamine,veneer
PaintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter~830kg/cubic meter
Backside finishFiber proof acoustic fabric
Fireproof gradeGB8624 2006 B,A
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Interval2~4mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree species

Maple,cherry,Oak, teak,walnut, Sapele,beech,birch,

Chinese walnut,macore,sandalwood

CertificationISO9001-2008,
Test reportEco protction, sound absorption, flame retardant

Bunge-High-quality Soundproof Wall Panels | Bunge Soundboard Panels-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop

etc.


Bunge-High-quality Soundproof Wall Panels | Bunge Soundboard Panels-2

Wooden Grooved Acoustic Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-High-quality Soundproof Wall Panels | Bunge Soundboard Panels-3


Installation Methods

A)Preparation


1.The place of installation must be dry,with the lowest temperature no less than 10 degrees celsius.


2.the acoustic panels to be installed must be placed in the place of installation for at least 48h in  order to adapt the indoor environment.


3.After installation ,the largest humidity changing rate of the place of installation should be between 40%-60%.


4.The distance between each wood keel must be less than 500mm and that between each light steel keel should no more than 600mm.


B)Installation


1.Confirm the place of installation ,determine the horizontal and vertical lines and the reserved measurements for the electric wire socket ,pipes.etc.


2.Calculate the actual construction measurements and cut the part of acoustic panels if needed.


3.Start to install and follow the rules:from left to right,from bottom too top.for horizontally installation.make the grooves up;for the vertical installation,make the tougues on the right.for real wood veneer acoustic panels that have requirements on the direction of the stripes,the panels should be installed according to the pre-marked sequence numbers.


C)Installation system


1.Lightweight steel keel system


2.Wooden batten system


Bunge-High-quality Soundproof Wall Panels | Bunge Soundboard Panels-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Bunge is a brand of sound absorbing panels famous for its high quality and considerate service.
2. The technical level for soundproof wall panels comes up to the advanced level in China.
3. Achieving constant improvements in product quality and service is Guangdong Bunge Building Material Industrial Co.,Ltd's ultimate goal. Get an offer!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...