Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant-EBUNGE
Home  > PRODUCTS  > 

Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant

EBUNGE-Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant
Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant-movable wall- folding partition-operalbe wall-EBUNGE
Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant-EBUNGE
Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant-movable wall- folding partition-operalbe wall-EBUNGE
Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant-movable wall, folding partition,operalbe wall-EBUNGE
mdf movable partition-EBUNGE
Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant-EBUNGE

Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant

Model
65 mm mdf movable partition
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T
Delivery Time
15 - 20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity also welcomed
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: MDF movable partition
Feature: Sound proofing
Finish: Melamine
Application: Restaurant partition walls
General use: Commercial furniture
Material: MDF + Aluminum
Sample: Free
Height: 2 - 4 meters
Based board: 9 mm MDF Board
Thickness: 65 mm(2 9/16 inch)
Function: Divide the space
Size: Partition walls customized
Color: Can be customized
Style: Folding and sliding

Malaysia Aluminum MDF Wood Soundproof Movable Room Partition Wall For Restaurant


Finished Project


In September,2018, we finished a MDF movable partition wall for restaurant project in Uganda. Totally 7 sets of wall, around 238 square meters. 


This project is a little different, the client chose 5 different colors as it is for a school classroom. They wanted the environment more colorful. The surface is also melamine, the biggest features is that there are more than 60 colors to choose and very easy to clean. We also sent our engineer Mr.Zeng to supervise the installation.


Thanks for the trust from the client. In May,2019, the client also contacted us for the MDF movable partition wall for restaurant orders. The same size, same surface and same colors, because they will use them in the same school, just the different floor.


Everything goes well and the client felt satisfied with our MDF movable partition wall for restaurant system and happy to cooperate with BUNGE Company.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for AuditoriumAluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Technical Information


ModelBG65BG85BG100
Suspension SystemHanging System, with ceiling rails
Basic Thickness65mm85mm100mm
Max HeightMax 3800mmMax 6000mmMax 8000mm
Width800 -1230mm
Floor/ceiling Sealing
strength
Telescopic aluminum tube with rubber strip
Side Walls Sealing
Strength
Double seal tape
Base Board Thickness9 mm9 mm12 mm
Vertical ProfilesAluminum anodised with sealing profiles
Retractable SealsAluminum black with double rubber seals
OperationManual System, with supplied operating handle
Pass DoorsSingle or Double Pass Through Door Available
WeightApprox 22-35 kg/m²Approx 25-40 kg/m²Approx30-48 kg/m²
Finish OptionsPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized)

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Client Visiting

Quality is the culture of BUNGE Company.

 

We are always focus on the quality of MDF movable partition wall for restaurant, and when the client come to visit our factory,all of them are satisfied on our quality.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for AuditoriumAluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Advantages


1. The MDF movable partition wall for restaurant is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

 

2. All of the MDF movable partition wall for restaurant can be customized, such as the size, the colors and the surfaces.

 

3. The MDF movable partition wall for restaurant can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

 

4. The operation is very easy, 1 person can finish the whole operation.

 

5. More than 60 kinds of colors to choose.

 

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Packaging & Delivery


Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Our Factory


Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls SystemWe are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries.

 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

Aluminum Frame Dubai Fire Proof DIY Movable Acoustic Wall Partition for Auditorium


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...