Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

interior insulated veneer sound deadening panels Bunge Brand

interior insulated veneer sound deadening panels Bunge Brand

interior insulated veneer sound deadening panels Bunge Brand
  • interior insulated veneer sound deadening panels Bunge Brand
  • interior insulated veneer sound deadening panels Bunge Brand
  • interior insulated veneer sound deadening panels Bunge Brand
  • interior insulated veneer sound deadening panels Bunge Brand
  • interior insulated veneer sound deadening panels Bunge Brand
  • interior insulated veneer sound deadening panels Bunge Brand

interior insulated veneer sound deadening panels Bunge Brand

Model
BG perforated acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton, or as requested.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated wooden acoustic panels
Feature: Soundproof and fireproof
Finish: Melamine,veneer
Application: Exhibition hall,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Noise reduction
Size: 2440*1220,1220*600 mm or as requested
Color: Can be customized
Style: Modern
Application Scope
Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition is widely used in the Manufacturing Decoration Materials industry and is widely recognized by customers.Guangdong Bunge Building Material Industrial Co.,Ltd is rich in industrial experience and is sensitive about customers' needs. We can provide comprehensive and one-stop solutions based on customers' actual situations.Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.
  • Bunge-Sound Deadening Panels Manufacture | Fireproof Perforated Wooden Acoustic
Company Advantages
1. Bunge sound suppression panels is manufactured with high-quality raw materials which are strictly selected from suppliers. It can divide a large space into small spaces for effective space utilization
2. Field operation indicates that sound deadening panels is of sound reducing wall panels. Every corner and edge of the product are carefully processed
3. Through an arduous efforts of all the staffs, Bunge has become a scaled and specialized noise reduction panels company. The surface of the product can be arbitrarily decorated by customers
4. Guangdong Bunge Building Material Industrial Co.,Ltd will establish and improve the process assurance system to provide customers with personalized professional noise cancelling wall panels products and services. It will be safely packaged in a carton box and a wooden box

Fireproof Perforated Wooden Acoustic Panels for Ceilings and Walls

Perforated Acoustic Panels Features

1 Mdf soundproof acoustic board is a kind of resonance absorption material with holes through on the quality MDF board.


2 It has strong selection on the sound spectrum and particular great performance on the middle and low frequency.


3 If filled with the acoustic cotton at the back side space of the acoustic panel, it has better performance on the middle and high frequency.


4 The holes diameter and pitch can be custom made.


5 Strong impact resistance, excellent decorate performance, elegant color, especially work for wooden construction.

Bunge-Find Sound Insulation Panels Fireproof Perforated Wooden Acoustic Panels

Technical Information

1.Structure

Basic Material ,Finish&Back Finish

2.Basic Material

E1 MDF,FR MDF ,MgO Combination Board etc.

3.Surface

Melamine ,Natural Wood Veneer,Paint,etc.

4.Back Finish

Black Acoustic Felt

5.Standard  Size

L600xW600mm,L1200xW600mm(alternate lengths and widths are available)

6.Standard Thickness

12/15/18mm

7.Distances of two holes

8/8mm,16/16mm,32/32mm

8.Diameter of holes

1,2,3,4,5,6,8,10,12mm,etc

9.Standard Pattern

8-8-1,16-16-3,16-16-6,32-32-6,etc

10.Fire rate

Can meet China Standard Class B1 and BS476 Part 7 Class 1

11.Eco level

Can meet China and EU Standard Class E1

12.Applications

Gymnasium,hotels,exhibition centers,schools,studio etc.

13.Customization

Can be Customized

14.Acoustic Principe

Resonance Absorption

15.Application

Auditorium/Dancing Hall/Office,etc.

Bunge-Find Sound Insulation Panels Fireproof Perforated Wooden Acoustic Panels-1

Perforated Acoustic Panels Applications

1.Studios, recording rooms, listening rooms, rehearsal rooms and more professionally interspace timbre projects.


2.Theaters, indoor gymnasiums, discos, KTV rooms and more performance and entertainment location.


3.Meeting rooms, offices, halls, hotels and more sound absorption and secrecy projects.


4.Air-port, railways, bus-stops, workshops and more noise reduction projects.


Bunge-Find Sound Insulation Panels Fireproof Perforated Wooden Acoustic Panels-2

Perforated Acoustsic Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Find Sound Insulation Panels Fireproof Perforated Wooden Acoustic Panels-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Find Sound Insulation Panels Fireproof Perforated Wooden Acoustic Panels-4



Company Features
1. Famous for high quality, Guangdong Bunge Building Material Industrial Co.,Ltd is the preferred sound deadening panels supplier for many companies.
2. Bunge has been continuously improving independent innovation capability and technical research capabilities.
3. Guangdong Bunge Building Material Industrial Co.,Ltd has been endeavoring to ensure the quality of the service. Contact!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...