EBUNGE-Interior Aluminum Frame Folding Sliding Doors Glass Partitions
Home  > PRODUCTS  > Glass Partitions  > Movable Glass Partitions  > 

Interior Aluminum Frame Folding Sliding Doors Glass Partitions

Interior Aluminum Frame Folding Sliding Doors Glass Partitions-EBUNGE
Interior Aluminum Frame Folding Sliding Doors Glass Partitions-EBUNGE
EBUNGE
EBUNGE
Interior Aluminum Frame Folding Sliding Doors Glass Partitions-EBUNGE
Interior Aluminum Frame Folding Sliding Doors Glass Partitions-EBUNGE

Interior Aluminum Frame Folding Sliding Doors Glass Partitions

Model
85 mm sliding glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding


Interior Aluminum Frame Folding Sliding Doors Glass Partitions


Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Sliding Glass Partitions Details



Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-1

Sliding Glass Partitions Features
  •   Easy element adjustment after installation.

  •   Track system shall be extruded aluminium, maintenance free with heavy-duty ball bearing steel rollers,wearing resistant.

  •  The colors of aluminum frames or tracks can be powder coated,such as black,silver and so on.

  •  There are many options about the sliding glass partitions:clear glass,tinted glass,low iron glass,laminated glass and decorated frosted glass etc.

  •  The design& size& color of the glass partitions can be customized by customers's requirement.

  •  Provides insulation from draughts, rain & noise with a self-draining aluminum tread.

Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-2
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-3
Sliding Glass Partitions Technical Details
SeriesBG65 Glazing Glass PartitionBG85 Aluminum Frame Glass PartitionBG85 Sound proof Glass Partition
Panel suspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness65mm85mm85mm
Panel heightUp to 3000mmUp to 6000mmUp to 6000mm
Max height3000mm6000mm6000mm
Panel width800-1100mm800-1100mm800-1100mm
Frame constructionTop and bottom aluminumAluminum frameAluminum frame
Glass thickness10mm single glass10mm or 12mm single glassdouble 10mm glass


Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-4

Sliding Glass Partitions Construction Methods



Track installation: Suspension fixed way is at the top of the sliding glass partition board install the hanging wheel, and connected to the track suspension. The sliding glass partitions track and hanging wheel should be chosen according to the partition size and load weight.

Glsaa parititon panels installation:  according to the design drawing, draw on each sliding glass partition panel to mark the line wheel, fix the wheel with screws on the glass partition board top; Then the sliding glass partition wall panel be put into track, let each panel in the perpendicular to the ground; Test and push-pull flexible rotation, and finally to fixed connection..

Debugging:  Sliding glass partitions need to discretion, sealing and so on debugging after installed. Then cleaning up the panel, complete the installation work


Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-5
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-6
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-7
Sliding Glass Partitions Stacking Options
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-8
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-9
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-10


Sliding Glass Partitions Finishes
  •    Wooden (MDF, Plywood bare raw finish)  &  (Melamine, Veneer)

  •    Fabric (fabric with mdf board hard covers)  &  (fabric with sponge soft covers)

  •   Leather (leather with mdf hard covers)  &  (leather with sponge soft covers)

  •   Wallpaper, Vinyl, Fireproof board

  •    Acoustic panels

  • ❻   Tempered glass. etc.

Externally, most   Glass Partitions  panels look the same, but it’s not simply the outside which makes a good movable wall, it is what’s inside the panel which makes the difference.


Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-11
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-12
Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-13


Common Applications


Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-14


The sliding glass partitions are suitable for large-scale conference room, banquet halls, exhibition halls, office, multi-purpose hall and other professional venues. Various types of glass partitions can be turned at any angle to achieve a full range of multi-angle flexible separation space, fully demonstrating the separation art of indoor space.


Bunge-Manufacturer Of Glass Partition Walls Interior Aluminum Frame Folding-15


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...