product-EBUNGE-img
Home  > PRODUCTS  > 

Hotel Wooden Operable Sliding Folding Partition Acoustic Movable Partition Wall

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Hotel Wooden Operable Sliding Folding Partition Acoustic Movable Partition Wall-img
product-Hotel Wooden Operable Sliding Folding Partition Acoustic Movable Partition Wall-EBUNGE-img-1
product-EBUNGE-img-1

Hotel Wooden Operable Sliding Folding Partition Acoustic Movable Partition Wall

Model
65 series movable partition wall
Brand Name
BUNGE
Year of Establishment
Eight
Original
China(mainland)
Payment Terms
T/T,D/A,D/P,L/C,Western Union
Delivery Time
20 days
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Partition board paper packaging, and finally packed in wooden carton.
OEM/ODM
OEM / ODM
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition wall
Feature: Sliding,Movable,Folding,Soundproof,Operable
Aluminium frame thickness: Aluminum Frame
Partition material: Wooden ,Aluminum
Finish: Melamine,Fabric,Leather,MDF
Application: Office,Hotel,Banquet Hall,School
General use: Office furniture
Material: Wooden
Function: Soundproof and Divide space
Size: 2440*133 mm, 2440*197 mmThickness 83 mm
Color: Can be customized
Style: Sliding Movable


Movable Partition Wall Description

Partitions wall markets a wide range of space division solutions including Moveable Glass Walls, Operable Partitions, and Accordion Doors.Modernfold partitions help architects, interior designers, and building owners more efficiently utilize a space.


Sound Absorption Wall Panel Polyester Fiber Sliding Folding Movable Operable Partition Wall



Movable Partition Wall Finish


Our partition products of decorative panels, there are fabric, leather, melamine , steel, polyester fiber, mirror, PVC board and so on.Welcome to customize, support ODM OCM service

A variety of decorative choices, and the original environment with natural, beautiful and neat


Sound Absorption Wall Panel Polyester Fiber Sliding Folding Movable Operable Partition Wall


Movable Partition Wall Packing

Close board when, partition wall can be concealed in special store ark, do not affect integral and beautiful

Sound Absorption Wall Panel Polyester Fiber Sliding Folding Movable Operable Partition Wall

Movable Partition Wall Parameter  


Technical Parameter
for Partition Panel
Panel Width500 - 1230mm
Panel height2000 - 6000mm
Sound proof36 - 50 db
OperationManual
FrameAluminum
Vertical profileAnodised aluminum profiles with integrated magnetic
strip and sealing edges on the inside
Finish optionsFabric , veneer , HPL melamine , vinyl , carpet , customers own material,
Bare finish
Base optionsPlywood , Gypsum , steel , MDF
Max widthUnlimited
Panel weight25 - 40 kg / sq
Pass door selectiondoorSingle or double door
SealsTopManual
bottomManual


EBUNGE-Oem Movable Partition Manufacturer, Style Movable Partitions-3


FAQ

1:What you should you do on site?

A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.

 

2:How to install?

We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.

 

3:What is lead time ?

The lead time is 7 days to 10days.

 

4:How to transport?

Sea transport is a common mode of transportation.In an emergency,can be air freight .

 

5:How do the goods packing?

Carton paper package ,MDF batten cover all around cotner.

 

6:What is procurement procedure?

Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)

Secondly, we offer you the movable wall layout drawings for your confirmation.

Thirdly, we quote the movable wall in acordance with confirmed


EBUNGE-Oem Movable Partition Manufacturer, Style Movable Partitions-4




Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...