Home  > PRODUCTS  > Movable Walls  > Sliding Partitions  >  Hotel Sound Proofing Movable Walls Banquet Hall Sliding Partition Walls
Hotel Sound Proofing Movable Walls Banquet Hall Sliding Partition Walls

Hotel Sound Proofing Movable Walls Banquet Hall Sliding Partition Walls

Model
65 mm sliding partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Product name: Sliding partition walls
Feature: Sound proofing
Aluminium frame thickness: Aluminum alloy
Partition material: Aluminum and board
Finish: Melamine
Application: Hotel,banquet hall,conference room,office
General use: Commercial furniture
Material: MDF+Melamine
Function: Save and divide space
Size: Can be customzied
Color: Can be customized
Style: Sliding

Hotel Sound Proofing Movable Walls Banquet Hall Sliding Partition Walls

Finished Project

Thanks for the trust from the client. We finished the packing and shipped to agent's warehouse on March 4th,2019.


This is a project in Lebanon,8 meters height partitions,using the steal materials,including the steel tracks,the steel rollers and the steel haging clips. 


Totally around 480 square meters.


Actually our steel system can support 900 KG materials,so that is enough to support the panels for this project.


Do you still worry about the installtion? Please do not worry,our professional team can help you about that.


For this project,we just delivered the accessories yesterday by air, and we will send our engineer(Mr. Zeng) to Lebanon to supervise the installation.


  • Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet HallBunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-1

    Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-2

Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm sliding partition walls ONLY FOR $85.

 

85 mm sliding partition walls ONLY FOR $98.

 

100 mm sliding partition walls ONLY FOR $118.

 

125 ultra-high system sliding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-3

Product Description


  •   Extensive worldwide sales network that has proved that our folding partition walls work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-4
Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-5
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of sliding partition walls. The sliding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the slidig partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-6

Components of Sliding Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the sliding partition walls with wheels.

Wheels/Rollers:  It is the carrier for the sliding partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-7Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-8

Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-9

Parking Styles of Sliding partition walls

As you know, when we do not use the sliding partition walls, we can park them to the parking area. Actually there are many parking styles for the sliding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-10Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-11

Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-12

Different Finishes of Sliding Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

  • Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-13Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-14

    Bunge-Commercial Room Dividers | Hotel Sound Proofing Movable Walls Banquet Hall-15


Product Message
社媒暂无评论
Contact
/* 客户要求添加的 */