Hotel Partition Walls

Home  > APPLICATION  > Hotel Partition Walls  > 

Hotel Operable Sound Proof Partition Walls Cost for Banquet Hall

Hotel Operable Sound Proof Partition Walls Cost for Banquet Hall

Hotel Operable Sound Proof Partition Walls Cost for Banquet Hall

Model
85 mm hotel partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Hotel partition walls
Feature: Sound proofing
Partition material: MDF+Melamine
Finish: Melamine
Application: Hotel,banquet hall
General use: Commercial furniture
Material: 100% Polyester Fiber
Function: Divide space
Size: As request
Color: Can be customized
Style: Sliding doors

Hotel Operable Sound Proof Partition Walls Cost for Banquet Hall

Finished Project

Project site: India


Model: BUNGE 85 mm hotel partition walls


Width: 3*10550 mm,1*6900 mm


Height: 3760 mm


Total:  4 sets, 145 square meters


Finish: Melamine


Color: CS-3087



  • Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof PartitionBunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-1Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-2

    Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-3

Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm hotel partition walls ONLY FOR $85.

 

85 mm hotel partition walls ONLY FOR $98.

 

100 mm hotel partition walls ONLY FOR $118.

 

125 ultra-high system hotel partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-4

Product Description


  • BUNGE hotel partition walls are used to divide meeting rooms, conference rooms, restaurant and banquet halls etc., it provides convenient and effective space management solutions, the panels move on a ceiling track with no requirement of floor guides or rails, its has been extensively applied to hotel industry.

  • BUNGE offers products and service with the end user in mind. We build in features that provide benefits to the owner over the life of the hotel sound proof partition walls. Features such as protective edge trim will keep your partitions looking good for many years to come.

  • The hotel sound proof partition walls consist of a series of interlocking flat panels and the fast set retractable top and bottom seals provide the easiest in-field operation, a simple half-turn of the waist high removable handle extends or retracts the sound seals.

  • The quick set retractable seals save the owner a great deal of time during setup and take down

    Time means money, especially for clients that rent their facilities for meetings and other functions.

  • BUNGE provides banquet hall hotel sound proof partition walls panel finishes such as melamine, fabric, leather, wood veneer, high-pressure laminate or other custom surfaces, panels also be supplied unfinished(raw mdf or plywood) for field decoration to compliment the building environment.

Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-5
Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-6
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of hotel sound proof partition walls. The hotel partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the hotel partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-7

Components of Hotel Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the hotel sound proof partition walls with wheels.

Wheels/Rollers:  It is the carrier for the sliding partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the hotel partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-8Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-9

Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-10

Parking Styles of Hotel Partition Walls

As you know, when we do not use the hotel sound proof partition walls, we can park them to the parking area. Actually there are many parking styles for the hotel partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-11Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-12

Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-13

Different Finishes of Hotel Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

  • Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-14Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-15

    Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-16

Package for Tracks System
  • Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-17Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-18

    Bunge-Operable Partition Walls Manufacture | Hotel Operable Sound Proof Partition-19


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...