Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

Hot sliding room dividers track Bunge Brand

Hot sliding room dividers track Bunge Brand

Hot sliding room dividers track Bunge Brand

Model
85 mm operable partitions
Brand Name
BUNGE
Year of Establishment
2011
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Application Scope
folding partition produced by Guangdong Bunge Building Material Industrial Co.,Ltd is mainly used in the following fields.Guangdong Bunge Building Material Industrial Co.,Ltd always adheres to the service concept to meet customers' needs. We are committed to providing customers with one-stop solutions that are timely, efficient and economical.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced production equipment at home and abroad. In the production, we insist on fine manufacturing and precise cutting to ensure that every product has smooth line. We try hard to avoid unnecessary flaws, only to provide customers with good user experience.
  • Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier
Product Details
With a focus on details, Guangdong Bunge Building Material Industrial Co.,Ltd strives to create high-quality folding partition.Guangdong Bunge Building Material Industrial Co.,Ltd opens up new horizons based on the market. We gain inspiration from art and create value with profession. Moreover, we try to integrate aesthetic art into the design of movable walls and focus on the design and planning of product details. We guarantee that each product is classic and stylish, simple and generous by putting our wisdom and vitality into the production.Guangdong Bunge Building Material Industrial Co.,Ltd has the ability to meet different needs. folding partition is available in multiple types and specifications. The quality is reliable and the price is reasonable.
  • Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier
Company Advantages
1. We update sliding room dividers with modern technology frequently, making it sliding partition walls. The product can far reach from one wall to another wall
2. The product has been proven to be good in various quality parameters by our experienced quality control team. It can divide a large space into small spaces for effective space utilization
3. Guangdong Bunge Building Material Industrial Co.,Ltd will provide professional packaging design for room divider wall. Every corner and edge of the product are carefully processed


Sound Proof Sliding Operable Retractable Wall Partitions for Banquet Hall

Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm operable partitions ONLY FOR $85.

 

85 mm operable partitions ONLY FOR $98.

 

100 mm operable partitions ONLY FOR $118.

 

125 ultra-high system operable partitions ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-1

Product Description


  •   Extensive worldwide sales network that has proved that our operable partitions work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-2
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-4

Components of Operable Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable partitions cost panels with wheels.

Wheels/Rollers:  It is the carrier for the Movable wall ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-5
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-6
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-7

Parking Styles of Operable Partitions

As you know, when we do not use the operable partitions, we can park them to the parking area. Actually there are many parking styles for the operable partitions, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-8
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-9
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-10



Different Finishes of Operable Partitions
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-11
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-12
Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of operable partitions. The operable partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the operable partitions are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Professional Sliding Folding Partition Walls And Partitions Supplier-14



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is an export-oriented company that integrates sliding room dividers research, development, production and sales.
2. The quality of room divider wall is strictly controlled from sliding partition walls.
3. To achieve the goal of being an influential sliding wall supplier, Guangdong Bunge Building Material Industrial Co.,Ltd strives to serve customers with their best service. Check now!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...
/* 客户要求添加的 */