Home  >  Quality PRODUCTS For sell  >  Partition Accessories Company  >  Hot rollers glass wall hardware aluminum Bunge Brand
Hot rollers glass wall hardware aluminum Bunge Brand

Hot rollers glass wall hardware aluminum Bunge Brand

Model
Partition walls accessories
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Product name: Partition Walls Accessories
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding
Product Comparison
Bunge Building Decoration Engineering pays great attention to integrity and business reputation. We strictly control the quality and production cost in the production. All these guarantee movable walls to be quality-reliable and price-favorable. Bunge Building Decoration Engineering's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.Compared with other products in the same category, movable walls has the following major features.
  • Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares
    Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-1
Enterprise Strength
  • Bunge Building Decoration Engineering focuses on the cultivation of scientific and technological talents. At present, a team of experienced experts and elite personnel has been established to provide a strong guarantee for product development.
  • Bunge Building Decoration Engineering will deeply understand the needs of users and offer great services to them.
  • Bunge Building Decoration Engineering always sticks to the business philosophy of 'efficient cooperation and mutual benefit'. We adhere to the enterprise spirit, which is to be hard-working, pragmatic and diligent. It would be our pleasure to partner with you and together, we can create a better tomorrow.
  • In the past years of development, Bunge Building Decoration Engineering has learned advanced production technology through different channels and has accumulated advanced development experience. Currently, we have rich experience in the production of movable walls and great production capability, which is close to the international level.
  • Bunge Building Decoration Engineering's folding partition are sold well in many cities and regions across the country.
Company Advantages
1. Multiple accessories of the product can be provided to the customers. Bunge rapidly growing organization is offering a premium quality glass wall hardware.
2. operable wall hardware is rendered as the most promising partition accessories with its office partition accessories properties. It can be used to save the power consumption of the air conditioning
3. partitions and accessories is applied to partition hardware for its features of partition parts. The product ensures a safe user experience
4. The product becomes popular for its movability. the key to develop operable wall hardware,partition door hardware for Bunge is that to satisfy customer needs, have creativity, and are highly marketable.
5. There are various colors offered for the product. whatever the occasion, Bunge captures the attention of glass wall hardware in this field.

Movable Partition Wall Hardwares,Accessories,Rollers and Tracks

MAIN TITLE


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.





Movable Walls Accessories Details


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-1

Movable Walls Accessories Advantages
  •   Thickness panel:65mm,85mm,100mm, height from 2 meters to 17 meters.

  •   Top supported without floor track or guide.

  •   The partition accessories are made of clear anodized extruded aluminum tracks and frames, customized powder coated color are available.

  •   Rock wool infill,with top and bottom retractable mechanism in the middle    and mdf,plywood or plaster base board on both side.

  •   Sound insulation coefficien :STC 32db to 53 db,    ASTM standard of acoustic tested in HongKong.

  •   There are many finishes about the movable walls.Such as the plywood,melamine,fabric and the leather surfaces.

  •   Fast delivery and Rich experiences in oversea project installation guide & supervision.

Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-2

Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-3



Movable Walls Accessories Technicals
Panel SuspensionTop hunge system without the need for a floor track.
Panel WidthEach panel 600mm-1200mm.
TrackAluminum OR Steel Track
Roller on panelSingle or Double Roller
Panel FramesHeavy-duty steel-gusseted aluminum inner frames reinforced with full height.
Top bottm sealsTop and bottom pressure retractable seals ensure effortless moved and locked.
Module700mm - 1200mm maximum.
Panel stackingNumerous panel stacking options for complete flexibility.
Panel faceMDF,Plywood, woven fabric, Leather,Natural wood veneer, Melamine,Wood moldings, etc.


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-4

Movable Walls Accessories

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the movable partitions panels with wheels.

Wheels/Rollers: It is the carrier for the movable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the movable partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-5
Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-6
Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-7


Stacking Options


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-8
Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-9




Different Finishes
  •    Wooden (MDF, Plywood bare raw finish)  &  (Melamine, Veneer)

  •    Fabric (fabric with mdf board hard covers)  &  (fabric with sponge soft covers)

  •   Leather (leather with mdf hard covers)  &  (leather with sponge soft covers)

  •   Wallpaper, Vinyl, Fireproof board

  •    Acoustic panels

  • ❻   Tempered glass. etc.

Externally, most  Movable Partition Accessories panels look the same, but it’s not simply the outside which makes a good movable wall, it is what’s inside the panel which makes the difference.


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-10
Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-11
Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-12

Common Applications



Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-13


The movable walls and partition accessories are widely used in hotel,auditorium,Gym,office,meeting rooms,exhibition halls,conference rooms,international convention centers,KTV,upscale restaurants,classroom,schools,hospitals,multi-purpose hall and other public places .


Bunge-Partitions And Accessories, Aluminum Movable Partition Walls Hardwares-14



Company Features
1. Primarily engaging in the production of operable wall hardware, Guangzhou Bunge Building Decoration Engineering Co., Ltd is equipped with modern production lines.
2. Guangzhou Bunge Building Decoration Engineering Co., Ltd has a number of advanced imported partitions and accessories production and processing equipment.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd persists in the service concept of glass wall hardware. Get more info!
Product Message
社媒暂无评论
Contact
/* 客户要求添加的 */