Hot glass wall sliding Bunge Brand

Hot glass wall sliding Bunge Brand

Model
Series 65
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Standard Sealed Wooden Case+ Plywood For Glass Panel
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable glass partition wall
Aluminium frame thickness: 10/12 mm tempered glass
Application: Conference room,office,classroom and etc
General use: Office furniture
Material: Tempered,laminated,Low-e/reflective/tempered glass
Function: Divide space
Size: Panel thickness 65 mm
Color: Multi color
Style: Sliding and folding
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has professional teams for product R&D, quality inspection and consultation service, which provides a strong guarantee for continuous development.
  • Guangdong Bunge Building Material Industrial Co.,Ltd is committed to providing quality and efficient services for customers.
  • Based on the core value of 'innovation, quality, service, sharing', Guangdong Bunge Building Material Industrial Co.,Ltd strives to provide quality products and excellent services. Our goal is to shape a first-class brand image in the industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd was established years ago. With the fearless spirit, we actively try new things and explore the market. We win honors one after another and enjoy a good corporate image in the field of Manufacturing Decoration Materials .
  • Guangdong Bunge Building Material Industrial Co.,Ltd's products are sold well in the country. They firmly occupy the majority of the market share.
Application Scope
glass partitions's application range is specifically as follows.Guangdong Bunge Building Material Industrial Co.,Ltd always gives priority to customers and services. With a great focus on customers, we strive to meet their needs and provide optimal solutions.Guangdong Bunge Building Material Industrial Co.,Ltd opens up new horizons based on the market. We gain inspiration from art and create value with profession. Moreover, we try to integrate aesthetic art into the design of movable walls and focus on the design and planning of product details. We guarantee that each product is classic and stylish, simple and generous by putting our wisdom and vitality into the production.
  • Bunge-Find Glass Wall Systems Interior Glass Partitions From Bunge Building Material
Company Advantages
1. Quality and Design is the guiding principles in Bunge interior glass wall systems production. It adopts the high-performance MDF board and rockwool panel
2. It is very efficient for glass wall to reduce the energy cost of interior glass partitions. It will not be easy to swing after being reliably installed
3. Quality for glass wall systems speaks louder than everything in Guangdong Bunge Building Material Industrial Co.,Ltd. The product finds its wide use in the banquet hall, conference room, office, etc
4. We will provide humanized outer packing for glass partition walls. The product is found to have good sound insulation

Sliding Aluminium Frame Office Movable Glass Partition Wall

Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office


Description


Sliding glass panels are suspended from an overhead track and carrier system .There is no floor tracks or guides are needed.However, the panels require floor pins and receptacles in the floor to keep them secure in the opening.

 

Sliding glass walls are made from a sheet of glass attached to top and bottom aluminum horizontal rails.The panel are shipped fully assembled.

 

Our factory glazing consists of 10 mm or 12 mm tempered clear glass.An optional acid washed. An optional acid washed, satiny translucent or frosted glass is also available. The glass may also be etched or decals added.

 

The glass edges are polished for a smooth finish.There is a 6-12mm gap between panels to prevent the edges from touching. The size of the gap varies due to glass tolerances.


Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-1


Technical information


Product Name

Movable Glass Partition

Material

Aluminium Frame +Glass;Glass

Door panel of 

Maximum Weight

80KG

Description

1.Glass screen divided into two kinds of box- and frameless glass type and thickness of 12mm,with steel bolt fixed.

2.For height is 2m-3.6m,largest rail loading is 450KG/m,screen does not have sound capabilities.

Installation method

Slide type,curve type and folding type.

Glass Thickness

10mm-12mm

Door panel of 

Maximum Width

900mm

Door panel of 

Maximum high

2800mm

Period for delivery

30 days


Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-2


Feature


1.Sliding glass partition has heavy-capacity rail to secure the partition.


2.Precision welding between tracks to reduce maintenance rate.


3.Tempered glass, simple and bright.


4.The upper and lower aluminum glass partition clips are designed as curved shapes.


5.The glass is fixed by drilling it into the clips, ensuring safety and durability.


6.The lock with hidden blots incorporates a fixing and closing function for the partition.


Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-3


Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-4

Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-5



Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-6

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-7Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-8

Bunge-Manufacturer Of Glass Partition Wall Sliding Aluminium Frame Office-9


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Bunge Building Material is China's outstanding overall solution provider for glass wall systems.
2. Bunge constantly upgrades the glass wall systems production technology.
3. Customer satisfaction is the business goal of Guangdong Bunge Building Material Industrial Co.,Ltd. Call now!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...