Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  > 

Hot glass partition aluminium Bunge Brand

Hot glass partition aluminium Bunge Brand

Hot glass partition aluminium Bunge Brand

Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable glass partition wall
Aluminium frame thickness: 10/12 mm tempered glass
Application: Conference room,office,classroom and etc
General use: Office furniture
Material: Tempered,laminated,Low-e/reflective/tempered glass
Function: Fireproof and eco-friendly Divide space
Size: 2440*133 mm, 2440*197 mm Thickness 83 mm
Color: Multi color
Style: Sliding and folding
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a professional team of experienced personnel in R&D, management, production, quality inspection, and marketing to promote corporate development.
  • While selling products, Guangdong Bunge Building Material Industrial Co.,Ltd also provides corresponding after-sales services for consumers to solve their worries.
  • In the future, Guangdong Bunge Building Material Industrial Co.,Ltd always gives priority to the development. We continuously develop our main business and keep pursuing quality excellence, so as to attract more customers with sincerity and dedicated services.
  • Guangdong Bunge Building Material Industrial Co.,Ltd was established years ago. With the fearless spirit, we actively try new things and explore the market. We win honors one after another and enjoy a good corporate image in the field of Manufacturing Decoration Materials .
  • Guangdong Bunge Building Material Industrial Co.,Ltd's sales network has covered many provinces across the country.
Application Scope
The movable walls produced by Guangdong Bunge Building Material Industrial Co.,Ltd has a wide range of applications.Guided by the actual needs of customers, Guangdong Bunge Building Material Industrial Co.,Ltd provides comprehensive, perfect and quality solutions based on the benefit of customers.In the design and production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.
  • Bunge-Glass Partition Manufacture | Sliding Aluminium Frame Office Movable Glass
Company Advantages
1. The surface form of glass partition is frequently updated to cater the modern glass door partition market. The product becomes popular for its movability
2. It is tested before delivery to ensure 100% quality right. It can be used to save the power consumption of the air conditioning
3. This product is under the strict supervision of our quality experts. It is manufactured according to environmental protection requirements
4. Known for these features, this product is highly appreciated among clients. It displays a gorgeous and delicate appearance

Sliding Aluminium Frame Office Movable Glass Partition Wall


Attention
Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-1


Description


Sliding glass panels are suspended from an overhead track and carrier system .There is no floor tracks or guides are needed.However, the panels require floor pins and receptacles in the floor to keep them secure in the opening.

 

Sliding glass walls are made from a sheet of glass attached to top and bottom aluminum horizontal rails.The panel are shipped fully assembled.

 

Our factory glazing consists of 10 mm or 12 mm tempered clear glass.An optional acid washed. An optional acid washed, satiny translucent or frosted glass is also available. The glass may also be etched or decals added.

 

The glass edges are polished for a smooth finish.There is a 6-12mm gap between panels to prevent the edges from touching. The size of the gap varies due to glass tolerances.


Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-2


Technical information


Product Name

Movable Glass Partition

Material

Aluminium Frame +Glass;Glass

Door panel of 

Maximum Weight

80KG

Description

1.Glass screen divided into two kinds of box- and frameless glass type and thickness of 12mm,with steel bolt fixed.

2.For height is 2m-3.6m,largest rail loading is 450KG/m,screen does not have sound capabilities.

Installation method

Slide type,curve type and folding type.

Glass Thickness

10mm-12mm

Door panel of 

Maximum Width

900mm

Door panel of 

Maximum high

2800mm

Period for delivery

30 days


Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-3


Feature


1.Sliding glass partition has heavy-capacity rail to secure the partition.


2.Precision welding between tracks to reduce maintenance rate.


3.Tempered glass, simple and bright.


4.The upper and lower aluminum glass partition clips are designed as curved shapes.


5.The glass is fixed by drilling it into the clips, ensuring safety and durability.


6.The lock with hidden blots incorporates a fixing and closing function for the partition.


Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-4


Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-5

Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-6



Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-7

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-8Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-9

Bunge-Find Glass Partition Glass Door Partition - Bunge Building Decoration-10



                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is one of the most professional glass partition manufacturers in China.
2. Guangdong Bunge Building Material Industrial Co.,Ltd possesses polished equipment, solid techniques and complete quality system.
3. Follow our steps, and you will get the best glass partition in this industry. Please contact.

                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
社媒暂无评论
Contact
/* 客户要求添加的 */