EBUNGE  > 

AI - Page Sitemap

 > 

high quality modular office furniture design for conference room

high quality modular office furniture design for conference room

High quality modular office furniture design for conference room

Model
BG Meeting Room Tables
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 sets
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Meeting room tables
Feature: Eco-friendly
Finish: Melamine,veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MFC Board
Function: Office Work
Size: 2400*1200*750 mm, can be customized
Color: Can be customized
Style: Modern
Company Advantages
1. EBUNGE modular office furniture is manufactured adopting advanced machines. These machines mainly include punching machine, bending machine, stamping machine, milling machine, cutting machine, etc. A magnetic strip is applied to the product to ensure strong functionality
2. This product is beneficial and extremely helpful in promoting brand awareness. It's not only cheaper than the TV channel advertisement, but it can also keep the brand visible and known for a longer period of time. It is widely used for privacy protection
3. The product meets the demanding quality standard and becomes the benchmark for quality.Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function
4. Many customers are satisfied with the high quality of this product. The product finds its wide use in the banquet hall, conference room, office, etc
5. The complete quality control system makes sure that this product is of high quality. Tracks of the product are made of high-quality anodized aluminum 6063-T5

Wooden Office Furniture Board MFC Small Conference Meeting Room Tables

Technical Information

Name

Wooden Office Furniture Board MFC Small Conference Meeting Room Tables

Keywords

Conference tabels,office furniture,office chairs with wheels

General Use

Commercial Furniture ; Office Furniture

Material

Top grade MFC,

Eco-friendly painting fine finishing, 

High quality hardware accessories, 

Genuine leather or PU

Color

 As per the picture, can be customized

Size

2400W*1100D*750H

8000W*2200D*760H

Or customization is acceptable

Components

Description

 

 1. Table Top:wire grommet design included;genuine leather or soft PU work area;

 2. Front panel;ISO9001 and ISO14001 and other International Standards

 3. Pedestal;

 4. Design: Modern

 5. Color: Walnut,Mahogany,etc.

 6. Certificate:ISO9001 and ISO14001

 7. Quality Guarantee: >10 Years

8. MOQ: 1 set or more

 9.Experienced and successful high end project case local US

high quality modular office furniture design for conference room-1

Office Workstations Advantages

1.   The surface paper is placed on the top layer of the decorative board to protect the layout, hard, wear-resistant, waterproof and fireproof.

2.   Conference tables adopts all solid wood mechanical crushing, through hot pressing technology, one-time forming, strong and durable.

3.   Apply the glue to the end face of the material through the edge banding machine to carry out the bonding. The main function is to seal the end face of the plate to avoid damage to the plate by the unfavorable factors in the environment and the use process, and to prevent the formaldehyde in the plate from volatilizing at the same time. Reach the decorative effect.

4.   Our conference table board is high density board,has a stable structure,smooth finishing,superior healthy environmental protection and other features.

high quality modular office furniture design for conference room-2

high quality modular office furniture design for conference room-3

Why Chose Us
1.We are OEM. Our products are factory direct sell. We can give the lowest price.
2.We have high quality. Show by the pics.
3.Our products are patented products. 
4.Our equipments are full-automation.
5.We can give a best service.
6.All of our products passed by ISO9001


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.                                



Company Features
1. At present, the main business of Guangdong Bunge Building Material Industrial Co.,Ltd includes the R&D, production and sales of modular office furniture .
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a specification of a wide variety and advanced equipment.
3. By implementing effective measures that aim to reduce carbon emission, we seek sustainable development. We will consume less energy, produce less waste, and handle emission using high-tech equipment.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...