EBUNGE  > 

AI - Page Sitemap

 > 

glass partition customized for banquet hall

glass partition customized for banquet hall

Glass partition customized for banquet hall

Model
Modern 32
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Standard Sealed Wooden Case+ Plywood For Glass Panel
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Solid glass partition wall
Partition material: Aluminium frame and tempered glass
Application: Conference room,office and etc
General use: Office furniture
Material: Aluminum Frame,wooden,glass
Function: Divide space
Size: Thickness 83 mm
Color: Can be customized
Product Details
BUNGE PARTITIONS pays great attention to product quality and strives for perfection in every detail of products. This enables us to create fine products. folding partition has the following advantages: well-chosen materials, reasonable design, stable performance, excellent quality, and affordable price. Such a product is up to the market demand.
  • EBUNGE-Office Single Double Tempered Clear Glass Partition Wal
Company Advantages
1. EBUNGE glass partition is manufactured with raw materials that meet the regulatory specification.
2. The product features high acoustic insulation. It has achieved sound insulation values of up to 57 dB with interlocking corner construction.
3. The product features an efficient retractable mechanism. The top and bottom rail of each panel incorporate an extruded aluminum mechanical seal to withstand the retracted or extended mode.
4. With all these features, it is greatly recognized by customers.

Office Single Double Tempered Clear Glass Partition Wal


Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

glass partition customized for banquet hall-1

Description


The glass partition products can be dismantled , repeated use, the materials of the partition system is a green building materials and environment-friendly materials.


The door, windows, modules entity, the location of the glass partition can be changed to suite your need, you can regroup and then use the materials after disassembly, component damage is not likely to occured 

even after regrouping or disassembly, so the glass partition system can greatly reduce costs for any office relocation.The installation of the glass partition is faster than ordinary wall.


Glass partition can be fire-resistant , compartment system is made by metal structure, glass, color steel plates etc , which also could be fire-resistant. While the compartment system is of steel structure system, the fire-resistance could be or 30 min, 60 min or a longer time.


glass partition customized for banquet hall-2


Technical information

Product Name

Office glass fixed partition

Blind

remote control blind and manual blind are available

Shape

L shape,linear shape,straight shape

Size(mm)

customized 

Color

More than 60 colors available

Glass

Double glass,single glass,frosted glass(10/12mm)

Partition Material

Aluminum frame+ panel/ glass /fabric / steel board

Desktop Seal edge

PVC/ABS

Accessories

Famous brand accessoriess

Products Character

Anti-Water, Anti-Scratch, Anti-Dirty

Packing

Standard export packing

Others

OEM,customized available


glass partition customized for banquet hall-3


Feature


1. Glass partition wall could be turned over 180 degree in order to adjust the line of sight and save energy.


2. The special structure design dose not only help to install easily and efficiently, but conduce to disassemble conveniently and replace the profile (type material), panels, etc.


3. The repeated utilization ratio of aluminum alloy profile could get to 90% above.


4. The partition system adopts high quality rubber seal without any glue. There is no dust and hazardous substance to pollute the environment and clean easily.


5. The partition system could be connected with buffer transition to meet various needs of engineering decoration and office facility.


glass partition customized for banquet hall-4


Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 63,more than 200 square meters, free sample.


   Series 80,quantity up to 500 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


glass partition customized for banquet hall-5

FAQ


Q1: Do you provide the design solution and drawings?


Yes, sure. We can design the systems you need to match different wall systems.


Q2: What is the standard size of your windows and doors? 

Our product is CUSTOMER MADE. We always manufacture windows and doors according to buyer's dimensions.


Q3: What is your warranty ? What do we do in case of problems? 


5 years quality warranty is provided,including frame unfading nor peel-off, hardware and accessories working properly under correct operation.In case of our quality problem, we will provide replacement by international courier.


Q4: What kinds of hardware can you supply ? 


Commonly Germany brand,China top brand and Australia brand,and other brands are available.


Q5: What is your MOQ order? 


10 piece is accepted. And the price is relative to the quantity you order.


Q6: What is your payment terms? 


30% - 50% of total amount by T/T as deposit when confirmed the order and balance paid by T/T  before loading container.


Q7: What's the delivery time? 


15 days for the standard color and 35 days for the customized. It depends on the details.




Company Features
1. Apart from providing high quality glass partition, EBUNGE also pays attention to the innovation to keep up with the fashion.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a mature product research and development team for glass partition.
3. glass partition systems is the cardinal tenet of Guangdong Bunge Building Material Industrial Co.,Ltd's operation. Get more info! We welcome all criticizims form our customers for glass partition. Get more info! glass door partition is the principles and standards that all employees in Guangdong Bunge Building Material Industrial Co.,Ltd must follow when they formulate strategies and conduct production operations. Get more info! Guangdong Bunge Building Material Industrial Co.,Ltd aims to enlighten others, set an example and share our passion and pride in glass partition industry. Get more info!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...