Home  >  Quality PRODUCTS For sell  >  Office Furniture Exporter  > 

furniture face office partitions melamine Bunge Brand

furniture face office partitions melamine Bunge Brand

furniture face office partitions melamine Bunge Brand
  • furniture face office partitions melamine Bunge Brand
  • furniture face office partitions melamine Bunge Brand
  • furniture face office partitions melamine Bunge Brand
  • furniture face office partitions melamine Bunge Brand
  • furniture face office partitions melamine Bunge Brand
  • furniture face office partitions melamine Bunge Brand

furniture face office partitions melamine Bunge Brand

Model
BG computer office furniture
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Computer workstations furniture
Feature: Eco-friendly
Aluminium frame thickness: 2 CM/4.5 CM/2.0 CM/1.8 CM
Partition material: Aluminum and board
Finish: Melamine,fabric,veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF
Function: Office Work, office partitions
Size: Standard,as request
Color: Can be customized
Style: Modern
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has quality R&D personnel and advanced production equipment to ensure high quality of products.
  • Guangdong Bunge Building Material Industrial Co.,Ltd provides comprehensive, thoughtful and quality services with quality products and sincerity.
  • With the main focus on customers, Guangdong Bunge Building Material Industrial Co.,Ltd takes a proactive approach to seek development. We always put customers and services first, which is the reflection of the core value. Our commitment is to provide customers with efficient and high-quality services.
  • In the past years, Guangdong Bunge Building Material Industrial Co.,Ltd has actively responded to various challenges in the Manufacturing Decoration Materials industry since the establishment. We have constructed a unique production model. Now we become the leader in the Manufacturing Decoration Materials industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd mainly runs the business of export products. The products are sold to many foreign countries and regions.
Company Advantages
1. The production technology of Bunge office partitions has been greatly improved by our dedicated R&D team. It can be used to save the power consumption of the air conditioning
2. The stability and safety of the product are outstanding. It displays a gorgeous and delicate appearance
3. Bunge is an enterprise that focuses on pc workstation desk to promote its diversified development. The product helps to create a multi-purpose room for multiple uses
4. Guangdong Bunge Building Material Industrial Co.,Ltd has excellent customer service and sales support throughout the process. The product becomes popular for its movability

Contemporary Modular Secretary Employee Office Desks Computer Tables Workstations Furniture

Office Furniture Deatils


 

1. The aluminium profile itself is 1.2mm-1.5mm, and finished patition thickness is 60mm and 30mm.


2. The computer workstations furniture is made of panel, aluminum, glass, white board and others.


3. Different layout and dimensions can be made by customer's requests.


4. Colors of the computer workstation partition and tabletop are subject to customer's requirements.


5. Matching prodcucts like movable/fixed pedestal, CPU Trolly, Keyboard Tray are available with us.


6. Different combination materials of the office workstations will be manufactured by your own will.


7. This type is a classical one and we have exported it to many Mid-Eastern countries.


8. Easy to install.


Bunge-High-quality Pc Workstation Desk Office Workstation Desk

Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

Bunge-High-quality Pc Workstation Desk Office Workstation Desk-1

Office Furniture Advantages

1--Office table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

Bunge-High-quality Pc Workstation Desk Office Workstation Desk-2


Office Furniture Finishing

There are 3 kinds of finishes to choose:

Bunge-High-quality Pc Workstation Desk Office Workstation Desk-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-High-quality Pc Workstation Desk Office Workstation Desk-5


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Over the years, Guangdong Bunge Building Material Industrial Co.,Ltd has experienced a rapid development for its office partitions by strong capability of high quality office furniture.
2. Taking advantage of office furniture cabinet and compact office furniture collaboration helps the production of a better pc workstation desk.
3. Guangdong Bunge Building Material Industrial Co.,Ltd has been encouraged to provide better service for customers. Inquiry!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...