Home  >  APPLICATION Factory  >  Buy Meeting Room Partition Walls For sell  > 

frame walls OEM partition wall material Bunge

frame walls OEM partition wall material Bunge

frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge
  • frame walls OEM partition wall material Bunge

frame walls OEM partition wall material Bunge

Model
85 mm sliding partition wall
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding partition wall
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Multi color
Style: Sliding
Product Details
The following is the section for presenting movable walls's details.With a focus on high standards and strict requirements, Bunge Building Decoration Engineering uses authentic materials to design and produce movable walls. We guarantee the quality by strictly controlling the mixed application of inferior materials in the production. They feature good design, long service life, corrosion resistance, as well as easy cleaning and installation. They are unanimously recognized by the market and have a high repurchase rate.movable walls, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.
  • Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding
Enterprise Strength
  • Bunge Building Decoration Engineering has a number of professional technicians of provincial research institutes to guarantee product quality.
  • Bunge Building Decoration Engineering strives to explore a humanized and diversified service model to provide all-round and professional services for customers.
  • Under the guidance of market, Bunge Building Decoration Engineering promptly adjusts the product structure and production methods according to market demand. Meanwhile, we attach great importance to the quality, so as to improve the product's market competitiveness.
  • Bunge Building Decoration Engineering was established years ago. With the fearless spirit, we actively try new things and explore the market. We win honors one after another and enjoy a good corporate image in the field of Manufacturing Decoration Materials .
  • Bunge Building Decoration Engineering's sales network radiates to all parts of the country.
Company Advantages
1. partition wall material is designed by professional designers with rich industry experience. It is manufactured according to environmental protection requirements
2. Thorough defect detection greatly guarantees the product quality. Every corner and edge of the product are carefully processed
3. The surface of the product can be arbitrarily decorated by customers. Bunge keeps carrying out innovations in the technology of portable wall partitions,flexible partition.
4. The product becomes popular for its movability. to be a noted worldwide conference room dividers,partition wall images manufacturing enterprise, each part of Bunge has been striving forward hard.


Aluminum Frame Retractable Operable Sliding Partition Walls

Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-1

Description


Sliding wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Soundproof partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-2Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-3Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Sliding wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-5Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-6

Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-8Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-9

Sliding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-10

Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-11Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-13

Packing & shipping


Sliding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-14Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-15

Bunge-Find Partition Wall Material Aluminum Frame Retractable Operable Sliding-16



Company Features
1. With a rich experience in partition wall material industry, we have always been focusing on the quality management.
2. portable wall partitions will never fall back because Guangzhou Bunge Building Decoration Engineering Co., Ltd has the most cutting edge technology.
3. In Guangzhou Bunge Building Decoration Engineering Co., Ltd, efforts will be made to promote the development of the domestic conference room dividers industry. Please contact us!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...