Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  > 

folding lightweight flexible folding panel partition Bunge Brand

folding lightweight flexible folding panel partition Bunge Brand

folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand
  • folding lightweight flexible folding panel partition Bunge Brand

folding lightweight flexible folding panel partition Bunge Brand

Model
85 mm movable partition walls
Brand Name
BUNGE
Original
Guangzhou, Guangdong
Payment Terms
T/T, Western Union
Delivery Time
5-15 Days
Supply Ability
5000+ square meters per month
MOQ
No MOQ
Packing Details
Carton packing and box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Multi color
Style: Sliding and folding
Enterprise Strength
  • Bunge Building Decoration Engineering has experienced professionals to provide a powerful force for high-quality products.
  • Bunge Building Decoration Engineering runs brand-new management and a thoughtful service system. We serve every customer attentively, so as to meet their different needs and develop a greater sense of trust.
  • With the business concept, Bunge Building Decoration Engineering seeks development with innovations and strives for excellence. We insist on the enterprise spirit which is to treat people sincerely and to be honest and law-abiding. We are dedicated to providing quality products and efficient services.
  • In the past years of development, Bunge Building Decoration Engineering has learned advanced production technology through different channels and has accumulated advanced development experience. Currently, we have rich experience in the production of movable walls and great production capability, which is close to the international level.
  • Bunge Building Decoration Engineering has a large sales network with the sales range covering from many provinces and cities to regions in the country.
Company Advantages
1. The product promises that there will be no scratch issues. Bunge range of folding panel partition is thoroughly checked by the experts in order to ensure that this product is safe to use and perform without any flaws.
2. This product delivers optimum efficiency to the users. Every corner and edge of the product are carefully processed
3. The establishment of the quality management system greatly ensures the quality of the product. The surface of the product can be arbitrarily decorated by customers
4. It displays a gorgeous and delicate appearance. the folding wall,dividers folding partitions in Bunge is quality-assured.
5. It is highly recognized for its excellent thermal insulation property. in order to sustain and improve the stability of folding room dividers,foldable wall divider quality, Bunge makes sure the precision of each production procedure.


Soundproof Wooden Folding Movable Partition Walls for Office

Bunge-Professional Moving Wall Folding Office Partitions Supplier

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Professional Moving Wall Folding Office Partitions Supplier-1

Description


Operable wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Soundproof partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Professional Moving Wall Folding Office Partitions Supplier-2Bunge-Professional Moving Wall Folding Office Partitions Supplier-3Bunge-Professional Moving Wall Folding Office Partitions Supplier-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Operable wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Professional Moving Wall Folding Office Partitions Supplier-5Bunge-Professional Moving Wall Folding Office Partitions Supplier-6

Bunge-Professional Moving Wall Folding Office Partitions Supplier-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Moving Wall Folding Office Partitions Supplier-8Bunge-Professional Moving Wall Folding Office Partitions Supplier-9

Soundproof partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Professional Moving Wall Folding Office Partitions Supplier-10

Bunge-Professional Moving Wall Folding Office Partitions Supplier-11Bunge-Professional Moving Wall Folding Office Partitions Supplier-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Professional Moving Wall Folding Office Partitions Supplier-13

Packing & shipping


Soundproof partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Professional Moving Wall Folding Office Partitions Supplier-14Bunge-Professional Moving Wall Folding Office Partitions Supplier-15

Bunge-Professional Moving Wall Folding Office Partitions Supplier-16




Company Features
1. As a professional manufacturer for folding wall, Guangzhou Bunge Building Decoration Engineering Co., Ltd insists on high quality.
2. Bunge masters highly advantageous production technology.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd regards quality service as life. Inquiry!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...