product-EBUNGE-img
Home  > PRODUCTS  > Glass Partitions  > Movable Glass Partitions  > 

Foldable room divider operable office partition wall movable sound proof partition wall for conference center

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Foldable room divider operable office partition wall movable sound proof partition wa
product-Foldable room divider operable office partition wall movable sound proof partition wall for -1
product-EBUNGE-img-1
product-EBUNGE-img-1

Foldable room divider operable office partition wall movable sound proof partition wall for conference center

Model
Folding partition wall
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton packing, box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition wall
Feature: Divide space
Partition material: MDF board, plywood
Finish: Melamine,fabric,leather,plywood and etc
Application: Banquet hall,conference room,classrom,hotel
General use: Space dividing
Material: Aluminum frame and MDF
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Fireproof and eco-friendlyDivide space
Size: 2440*133 mm, 2440*197 mmThickness 83 mm
Color: Can be customized
Style: Modern style

Foldable room divider operable office partition wall movable sound proof partition wall for conference center

product-EBUNGE-img

Products Description:

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.
Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.
Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.

product-EBUNGE-Foldable room divider operable office partition wall movable sound proof partition wa


product-Foldable room divider operable office partition wall movable sound proof partition wall for

Foldable partition characteristics


1)Aluminium movable partition wall have interlocking 

male / female trapezoidal vertical aluminium profiles, 

for soundproof connection between elements.
2)To ensure aluminium movable partition wall additional

 friction connection, shall be integrated with magnetic strip.
3)Aluminium movable partition wall are easy element 

adjustment after installation.
4)Aluminium movable partition wall rack system shall be 

Extruded aluminium, maintenance free with heavy-duty 

ball bearing steel rollers.
5)Aluminium movable partition wall surface panel shall

 be of 9mm or 12mm MDF with acoustic treatment to the 

required level.

Technical parameters:



Series
BG65
BG85
BG100
Panel suspension
Top hung only
Top hung only
Top hung only
Track system
Single or twin point
Single or twin point
Single or twin point
Panel thickness
65mm
80mm / 85mm
100mm
Panel height
Up to 4000mm
Up to 6000mm
Up to 18000mm
Max height
4000mm
6000mm
18000mm
Panel width
600-1230mm
600-1230mm
600-1230mm
Frame construction
Aluminum frame
Aluminum frame
Aluminum frame
Face material
9mm
9mm / 12mm
12mm
Fire safety
Optional Class I or O
Optional Class I or O
Optional Class I or O
Vertical profiles
Aluminum anodised with sealing profiles
Aluminum anodised with sealing profiles
Aluminum anodised with sealing profiles
Retractable seals
Aluminum black with 
double rubber seals
Aluminum black with double rubber seals
Aluminum black with double rubber seals
Operation of seals
Manual, with supplied 
operating handle
Manual, with supplied operating handle
Manual, with supplied operating handle
Locking
Optional lock to pass doors
Optional lock to pass doors
Optional lock to pass doors
Pass doors
Single open in panel or 
double open in two panel
Single open in panel or double open in two panel
Single open in panel or double open in two panel
Sound insulation
20-32dB Rw
28-36dB Rw
32-50dB Rw
Weight
Approx 22-35kg/sq M
Approx 25-40kg/sq M
Approx30-48kg/sq M
Finish Material
Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting,
etc. (Customized)

Finish:


Different surface use in different areas.Our main surface is MDF with Melamine, it can be used in Classroom, Restaurant and so on, it's easy to maintain. Fabric and PU leather surface are very popular in conference room and hotel banquet hall. In dancing room, clients usually prefer mirror surface. Also we can design surface based on fabric or pu leather with modern printing photos.If clients prefer to paint color on panels, we suggest MDF bare finish, it's also very welcomed, because it can make wallpaper, painting on site.

product-foldable room divider-EBUNGE-img

product-EBUNGE-foldable room divider-img

product-EBUNGE-img

Production:

Manufacturer based


We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.product-EBUNGE-img-1

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-Foldable room divider operable office partition wall movable sound proof partition wa-1

product-Foldable room divider operable office partition wall movable sound proof partition wall for -1

Packaging & Shipping:

Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-foldable room divider-EBUNGE-img-1


       Free Sample in 10 Days

Inquiry now and you will have

your  sample in 10 day if you pay 

the express.



                3-year Warranty

The acoustic room divider made of 

6063-T5 alumina, anti-aging, no 

fading and abras

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...