Home  >  Quality PRODUCTS For sell  > 

foldable partition doors table EBUNGE

foldable partition doors table EBUNGE

foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE
  • foldable partition doors table EBUNGE

foldable partition doors table EBUNGE

Model
Office furniture
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-15days
Supply Ability
5000 sets per month
MOQ
No MOQ
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office workstation
Feature: Fine Workmanship
Finish: Melamine,fabric
Application: Office,conference room
General use: Office furniture
Material: MFC board and aluminium frame
Function: Staff Desk
Size: 2400*2800*1100 mm
Color: Can be customized
Style: Modern tye
Product Comparison
BUNGE PARTITIONS carefully selects quality raw materials. Production cost and product quality will be strictly controlled. This enables us to produce movable walls which is more competitive than other products in the industry. It has advantages in internal performance, price, and quality.Compared with other products in the same category, movable walls has more advantages, specifically in the following aspects.
  • EBUNGE-movable partition | PRODUCTS | EBUNGE
    EBUNGE-movable partition | PRODUCTS | EBUNGE-1
Company Advantages
1. EBUNGE foldable partition doors is professionally designed. The design is carried out by our professionals who aim to provide flexible sight and sound separation and to control the atmosphere and experience of the space.
2. The quality of our movable partition is so great that you can definitely rely on.
3. movable partition offers foldable partition doors, while maintaining an exemplary style movable partitions .
4. Guangdong Bunge Building Material Industrial Co.,Ltd has a strong R&D team and passed ISO90001 certification.

Modern Type Furniture 4 Seat Office Partition Cubicle Workstation


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle

Description


The workstation is a combination of a screen and a desk. Now the combination of screen work positions is increasingly used in office.

 

Office workstation has aluminum alloy frame, main surface has two kinds: felt fabric and melamine finish. The felt fabric finish is easy to dirty and difficult to clean, while the melamine surface is wear-resistant and easy to clean.We can supply a variety of colors to let customers choose preferred one and it can be matched with the decoration style to make it more perfect than the felt fabric.


There is three kinds surface for office workstation.


1. Steel board: used for the outer decorative surface of the screen. It is made of one-pole cold-rolled steel plate. The surface is treated by electrostatic spraying. It is better for the overall appearance of the screen. The surface can be punched, punched and so on. , round hole, square convex, square convex, square hole, long hole, etc.)

 

2. Glass: A relatively transparent solid material that forms a continuous network structure during melting, and gradually increases in viscosity during cooling and hardens the silicate-based non-metallic material.

 

3.Fabric: double-sided weaving, with flame retardant, stain-resistant, non-fading, no wool particles and other functions.

Technical information



PRODUCT  NAME

Modular office workstation

DIMENSION

standard, as your require

DESCRIPTION

Model code:B32
       Style: Monolithic Partition
       Thickness: 32mm
       Material: Aluminum frame with melamine board, soft board, magnetic board, white board, accessories rail and glass
       Raceway available: 120H and 175H 
       Max size: 1800mm for max width, 1800mm for max height
       Advantage: Can be combined with 30mm panel (L3 and D32)
      Combination style: L shape, T shape, U shape, Cross shape 
      Max size: 1800mm for max width, 1800mm for max height

Combination style: L shape, T shape, U shape, Cross shape and 120 degree shape

Combine:L6+D32

PACKING

1.KD(KNOW DOWN)

2.REGULAR 7 YEARS EXPORT STANDARD PACKAGE

3.MAINLY WITH CARTON,NECESSARY PROTECTION MATERIAL INSIDE

MOQ

small orders are welcome

TERMS OF PAYMENT

FOB,T/T(30% IN ADVANCE),CIF, EXW. western union monogram

PORT

GUANGZHOU

DELIVERY TIME

20-25DAYS ONCE ORDER CONFINE  AND RECEIPT OF ADVANCED PAYMENT


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle-1

Office workstation feature


1.The office workstation is made of panel, aluminum, glass, white board and others.

 

2.Different layout and dimensions can be made by customer's requests.

 

3.Colors of the partition and tabletop are subject to customer's requirements.

 

4.Matching products like movable/fixed pedestal, CPU Trolley, Keyboard Tray are available with us.

 

5.Different combination materials of the partition will be manufactured by your own will.

 

6. Easy to install.


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle-2


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle-3

Workstation advantage


1.Good quality with competitive price.


2. Modern, Comfortable, Elegant and endurable, Environmentally-friendly materials.


3. The best after-sales service, Mutual Development, Mutual Benefits, so make long time cooperation.


4. Thousands of models for choice , fully meet different customers' demands.


5. Different styles with different material and price range, control cost in the best way.


6. Customized service: OEM, ODM available. 


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle-4


Our service


1. Creative CAD Design: Give us your floor plan or send over your room’s measurements (if you don’t have professional designer,only by hand drawing sketch with clear dimensions will work). Our design team will come up with a custom fit solution and hand over a proposal to fit your needs.

 

2. Custom-manufacturing: We create exactly what you want, according to your tastes, and based on your design requirements. In fact, most of our models can be customized according to material, color, or size. You can also give us your design plan and we will create a new mold for you based on the requirements you specify.

 

3. Full plans: For seating, workstations, reception areas, boardrooms, conference rooms, restaurants, hotels, etc. We have extensive experience working with overseas architect designers, contractors, and retailers, and have a wealth of international support.

 

4. Safe and fast delivery: Delivery is mostly by container regularly to the USA and Europe, but if less than FCL, small order by LCL shipment is also an option. We are skilled at consolidating shipments of different buyers into large containers to ship to the same overseas city so they will have the same POD.

 

5. Consultation and post-sale service: We support you throughout the lifetime of your purchase, and our multi-language sales team is available 24/7 to communicate.


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle-5

Packing & shipping


Packing:

Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.


Shipment:

For parcel sample / urgent things by air:

We provide as many shipping options as possible, including DHL, UPS, ,FedEx, EMS and Air mail and so on.

 

For mass production big quantity by sea:

 We've cooperated with our shipping forwarder for many years, and they can offer us the competitive price by the vessels.


Bunge-Movable Partition Modern Type Furniture 4 Seat Office Partition Cubicle-6



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a professional manufacturer with world-class products.
2. We have a precision in-house machine shop. It enables us to efficiently and effectively create or customize high-quality products that meet our customers' exacting specifications.
3. With the benefits of movable partition sector, EBUNGE brand will grow rapidly because of its considerate support. Ask! We will continue to develop a variety of new movable partition products. Ask! Following years of attempts in the movable partition manufacturing business, EBUNGE is worthy of your trust. Ask!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...