EBUNGE  > 

AI - Page Sitemap

 > 

foldable partition doors EBUNGE

foldable partition doors EBUNGE

Foldable partition doors EBUNGE

Model
BG meeting room tables
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T or Western Union also available
Delivery Time
15 - 20 days
Supply Ability
50000 sets per month
MOQ
No MOQ, small quantity welcome
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Meeting room tables
Feature: Modern
Finish: Melamine
Application: Meeting room, conference room
General use: Office furniture
Material: Melamine+steel structure
Function: Office staff work
Size: 2400*1200 mm, accept customized
Color: Optional
Product Details
BUNGE PARTITIONS strives excellent quality by attaching great importance to details in the production of movable walls.Closely following the market trend, BUNGE PARTITIONS uses advanced production equipment and manufacturing technology to produce movable walls. The product receives favors from the majority of customers for the high quality and favorable price.
  • EBUNGE-foldable partition doors | PRODUCTS | EBUNGE
Company Advantages
1. The manufacture of EBUNGE foldable partition doors involves some critical processes. These stages include concept confirmation, metal materials procurement, frame fabrication, components machining, surface painting, and final assembly.
2. The product features great sound reduction. The retractable top and the bottom seal greatly contribute to the reduction of sound.
3. The product features high acoustic insulation. It comes with a very wide range of construction styles that minimize sound transition or absorb sound to minimize sound room reflection.
4. For those who are easily prone to skin allergies, this product will definitely keep people away from fungus and pruritus.
5. With an intuitive interface, the product is simple for employees to learn, which will result in shortening training time and help them to be more productive overall.

Office Boardroom Table Tops Meeting Room Modern Conference Tables

Product description

Product nameConference table
Brand nameBUNGE
Brand nameGuangzhou, Guangdong, China
SizeLength1800/2000/2400/2800/3200/3600/4000/4800
Width1000/1200/1400
Height750
MaterialE1 Melamine panel
Port of loadingGuangzhou/Shenzhen
Delivery time20-30 days after receiving payment
InstallationDisassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos)
PackageHigh resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box
ServiceSupport color and size customization, please contact customer service for details!

foldable partition doors EBUNGE-1
Advantages

1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.
foldable partition doors EBUNGE-2

foldable partition doors EBUNGE-3

foldable partition doors EBUNGE-4

foldable partition doors EBUNGE-5

Packaging & Shipping

Detailed Packing:


1. KD packing.


2. Shipping marks can be decided by customers.


3. Outside: thick carton to reduce extrusion & collision in transit.


4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.


Shipping Details:


1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.


2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.


3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

foldable partition doors EBUNGE-6

foldable partition doors EBUNGE-7



We offer

1.Molding workshop

2.Aluminum-extrusion workshop

3.Injection and die-casting workshop

4.Ironware workshop

5.Anodized workshop

6.Powder coating workshop

7.Assembling workshop.

All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.

So our product are high-quality with affordable price. That means cost-effective.

foldable partition doors EBUNGE-8



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is considered as one of the leading producers in China. We are engaged in the development, design, and production of foldable partition doors.
2. The outcome of movable partition has been considerably enhanced through our international advanced technology.
3. Guangdong Bunge Building Material Industrial Co.,Ltd makes every effort to improve the quality of movable partition with high quality services. Contact! Guangdong Bunge Building Material Industrial Co.,Ltd strives to be your best business partner in such high-speed developing & serious-competition environment. Contact! Guangdong Bunge Building Material Industrial Co.,Ltd's mission is to provide high quality products at competitive prices. Contact!
EBUNGE foldable partition doors is professionally designed. It has been designed by considering many constructional elements such as mechanical structures, spindle bearings, and control and operating devices. This product helps drivers free of the worry of car collisions
All of the materials used in EBUNGE movable partition are required to meet relevant demands. The hardware or mechanical components will be tested for mechanical properties and chemical composition. Its up-to-the-minute feedback function helps the prevention of accidents
This line gives EBUNGE foldable partition doors a good design. It is created by details such as seams, openings, pleats, gathers, folds, top titles, and trims. It defines the form and shape of this product. The product has good performance in reacting to car emergency situations
EBUNGE foldable partition doors has been carefully manufactured. The production process involves cutting, sewing and deep processing, and is divided into many refinements required to make the product. The emergency alarming provides better security for cars and drivers
EBUNGE foldable partition doors provides quality craftsmanship unmatched by other brands. This product is designed by our interior design department with a wide range of prints and patterns. Its sensitive sensor has flexible adaptability in the nighttime
The product features the desired rigidity. It can stand up a certain heavy workload while achieving sustained dynamic accuracy and repeatability. This product has the advantage of buzzing-free
The product features constant high productivity. The essential components are frequently upgraded to offer the desired and new functionality during operation. It's able to work normally even the in-car temperature is high
The product is remarkable for its sealing performance. It will be tested under static pressure to check whether there is a leakage phenomenon. Its sensitive sensor has flexible adaptability in the nighttime
This product creates a new standard in softness and breathability that makes it really hard to get out of bed in the morning. This product can be customized to fit all types of cars
It is not easily to get pilling. Its fibers are strong enough to not be easily damaged in the ways of washing, pulling or rubbing. It enables users to aware of the conditions of their cars
Without the high quality performance, foldable partition doors can not be so popular in this market. This product is ideal for reducing the car accident rate
As the society changing, the quality of foldable partition doors remains the same as before. It helps drivers stay concentrated when driving
Guangdong Bunge Building Material Industrial Co.,Ltd is a leading manufacturer for movable partition for many years, so quality can be guaranteed. This product is ideal for reducing the car accident rate
Guangdong Bunge Building Material Industrial Co.,Ltd continuously creates good results in the field of foldable partition doors. It helps drivers stay concentrated when driving
With advanced technology and professional staff, it is absolute that movable partition quality is assured. This product can be customized to fit all types of cars
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...