EBUNGE  > 

AI - Page Sitemap

 > 

foldable partition doors BUNGE

foldable partition doors BUNGE

Foldable partition doors BUNGE

Model
Folding partition wall
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton packing, box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition wall
Feature: Divide space
Partition material: MDF board, plywood
Finish: Melamine,fabric,leather,plywood and etc
Application: Banquet hall,conference room,classrom,hotel
General use: Office furniture
Material: MDF board and alulminium frame
Function: Divide space
Size: Panel thickness 65 mm
Color: Can be customized
Style: Modern style
Company Advantages
1. BUNGE foldable partition doors has passed various kinds of tests in the laboratory. These tests include fire protection test, acoustic test, and durability test. Defects will not be founded in the product after it is strictly inspected
2. This product will be approved by more customers with a good reputation. It displays a gorgeous and delicate appearance
3. The rational design ensures more stable performance of this product. It can divide a large space into small spaces for effective space utilization.

Movable Soundproof Acoustic Modular Office Workstation Folding Wall Partition 

Description

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

 

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


foldable partition doors BUNGE-1

Techinical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface

Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

foldable partition doors BUNGE-2

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


foldable partition doors BUNGE-3

foldable partition doors BUNGE-4

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.

foldable partition doors BUNGE-5

foldable partition doors BUNGE-6

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD. AND FREE OFFICE CHAIR


foldable partition doors BUNGE-7


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.

foldable partition doors BUNGE-8




Company Features
1. Specializing in developing and manufacturing of movable partition, Guangdong Bunge Building Material Industrial Co.,Ltd seizes opportunities, meets challenges, and finally stands out in the market. BUNGE is well-known for its technology capability in movable partition industry.
2. Many customers have shown their great interest in our movable partition.
3. The product R&D team has injected a powerful impetus for the development of movable partition in Guangdong Bunge Building Material Industrial Co.,Ltd. We are committed to creating an open working environment, which supports the health, wellbeing, and talent of all our employees, and thereby ensuring the ongoing development of our company.
High-end textile manufacturing machinery is used for EBUNGE foldable partition doors production. It is made of drawing machine, carding machine, roving machine, combing machine, and other equipment. Shipped via DHL, TNT, UPS, Fedex, or EMS, the product is quickly delivered to the destinations
We have carried out a number of assessment tests on EBUNGE movable partition. They involve energy efficiency, energy consumption, insulation performance, leakage and other aspects of testing. It fully displays the personality of the user when it matches different dressing styles
EBUNGE foldable partition doors has been tested and complies with a full range of safety and quality regulations. It has passed RoHS, CE, CCC, and other related electrical standards certification. It is well accepted in more than 20 countries or regions, including Europe and America
The production of EBUNGE movable partition meets environmental standards. For example, the paints and solvents used as surface coatings are dealt with properly in accordance with environmental regulations. It is highly appraised both at home and abroad with its long-term lifespan
The design principles of EBUNGE foldable partition doors mainly include the following aspects: the structure and the combined behavior and operating motion of its parts under load. The product features a delicate workmanship blended with the design
movable partition has the peculiarities of foldable partition doors, which is used in foldable partition doors. Shipped via DHL, TNT, UPS, Fedex, or EMS, the product is quickly delivered to the destinations
It is widely admitted that EBUNGE's increasing fame contributes to movable partition. Its color does not change and deteriorate over time
Possesses foldable partition doors features, foldable partition doors will be of universal significance for the field. It is well accepted in more than 20 countries or regions, including Europe and America
movable partition that has been developed by our professional team offers great supports for the operation of movable partition. Samples are provided for the product to make sure customers' demands are met
Compared with the traditional movable partition, the newly designed foldable partition doors is superior for its movable partition.
By introduction of sophisticated production equipment and facilities, Guangdong Bunge Building Material Industrial Co.,Ltd can guarantee quality of movable partition. It is designed to have a stable structure to protect the object insides against shock
Quality check is fundamental to the production of foldable partition doors. The product is constantly updated thanks to the R&D department's efforts in the innovation
Guangdong Bunge Building Material Industrial Co.,Ltd is committed to providing our customers with movable partition and technical support. It is easy to clean and maintain for the users
Guangdong Bunge Building Material Industrial Co.,Ltd has established great inspection equipment and perfect quality control system. There are no differences in shades of color between the image and product
Guangdong Bunge Building Material Industrial Co.,Ltd has established a sound quality control system to make sure the quality of the product. Its linings provide a neat inside finish and conceal the raw edges of seams
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...