EBUNGE  > 

AI - Page Sitemap

 > 

foldable partition doors

foldable partition doors

Foldable partition doors

Model
BG conference room tables
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union also available
Delivery Time
7 - 15 days
Supply Ability
50000 sets per month
MOQ
No MOQ, small quantity welcome
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Conference room tables
Feature: Modern conference tables
Finish: Melamine
Application: Meeting room tables
General use: Office furniture
Material: Metal structure+melamine
Function: Office staff work
Size: 2400*1200 mm, accept customized
Color: Optional
Company Advantages
1. movable partition is endowed with impeccable design and exquisite craftsmanship. It adopts the convenient hanging system without the floor track
2. Fast and personalized service are guaranteed in Guangdong Bunge Building Material Industrial Co.,Ltd. Equipped with a sealing device, the product is praised for its tight sealing performance
3. movable partition is applied to foldable partition doors for its advantages of style movable partitions . The product offers a thorough partition from the ceiling to the floor
4. movable partition are widely used for foldable partition doors. Defects will not be founded in the product after it is strictly inspected
5. The main character of the movable partition is that it has foldable partition doors. Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function

Commercial Office Furniture Meeting Room Negotiation Wooden Table Tops Melamine Conference Boardroom Tables 


Product description

Product nameConference table
Brand nameBUNGE
Brand nameGuangzhou, Guangdong, China
SizeLength1800/2000/2400/2800/3200/3600/4000/4800
Width1000/1200/1400
Height750
MaterialE1 Melamine panel
Port of loadingGuangzhou/Shenzhen
Delivery time20-30 days after receiving payment
InstallationDisassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos)
PackageHigh resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box
ServiceSupport color and size customization, please contact customer service for details!

foldable partition doors-1

Advantages

1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

foldable partition doors-2

foldable partition doors-3

foldable partition doors-4

foldable partition doors-5


Packaging & Shipping

Detailed Packing:


1. KD packing.


2. Shipping marks can be decided by customers.


3. Outside: thick carton to reduce extrusion & collision in transit.


4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.


Shipping Details:


1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.


2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.


3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

foldable partition doors-6

foldable partition doors-7




We offer

1.Molding workshop

2.Aluminum-extrusion workshop

3.Injection and die-casting workshop

4.Ironware workshop

5.Anodized workshop

6.Powder coating workshop

7.Assembling workshop.

All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.

So our product are high-quality with affordable price. That means cost-effective.

foldable partition doors-8




Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a focused leader in movable partition. With experienced technicians, our movable partition are produced with high performance.
2. With innovation of the introduced technology, the quality of movable partition is greatly improved.
3. The core competitiveness for Guangdong Bunge Building Material Industrial Co.,Ltd lies in its technology. We focus on novel materials application for new cutting-edge movable partition products. Ask online!
EBUNGE style movable partitions is professionally designed. It has been designed by considering many constructional elements such as mechanical structures, spindle bearings, and control and operating devices. The rust resistance is conducive to its durability
All of the materials used in EBUNGE style movable partitions are required to meet relevant demands. The hardware or mechanical components will be tested for mechanical properties and chemical composition. The product has passed the UL, TUV, CE, or CCC certification
This line gives EBUNGE movable partition a good design. It is created by details such as seams, openings, pleats, gathers, folds, top titles, and trims. It defines the form and shape of this product. Capable of heat dissipating, the product is more durable in use
EBUNGE movable partition has been carefully manufactured. The production process involves cutting, sewing and deep processing, and is divided into many refinements required to make the product. It is free of thermal radiation and keeps people from harmfulness
EBUNGE movable partition provides quality craftsmanship unmatched by other brands. This product is designed by our interior design department with a wide range of prints and patterns. Its rugged and sinuate branches look like the branches of real trees
The product features the desired rigidity. It can stand up a certain heavy workload while achieving sustained dynamic accuracy and repeatability. The product is firmly assembled and free of the safety issue
The product features constant high productivity. The essential components are frequently upgraded to offer the desired and new functionality during operation. Its transmittance of light is highly recognized
The product is remarkable for its sealing performance. It will be tested under static pressure to check whether there is a leakage phenomenon. Its various designs and types allow meeting different needs of customers
This product creates a new standard in softness and breathability that makes it really hard to get out of bed in the morning. The product has a strong bearing capacity
It is not easily to get pilling. Its fibers are strong enough to not be easily damaged in the ways of washing, pulling or rubbing. The product is free of flickering to guarantee its consistent working
Without the high quality performance, style movable partitions can not be so popular in this market. It features low power consumption, which helps to save energy
As the society changing, the quality of foldable partition doors remains the same as before. Its rugged and sinuate branches look like the branches of real trees
Guangdong Bunge Building Material Industrial Co.,Ltd is a leading manufacturer for movable partition for many years, so quality can be guaranteed. The product is instant on, without any delay
Guangdong Bunge Building Material Industrial Co.,Ltd continuously creates good results in the field of foldable partition doors. Switching the product on/off frequently will not cause much damage to itself
With advanced technology and professional staff, it is absolute that movable partition quality is assured. Its classical design adds great attraction to the house
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...