Home  > PRODUCTS  > Acoustic Panels  >  Fireproof Grooved Board Ceiling Auditorium Wood Acoustic Panel
Fireproof Grooved Board Ceiling Auditorium Wood Acoustic Panel
Fireproof Grooved Board Ceiling Auditorium Wood Acoustic Panel
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Standard paper carton or customized packaging
OEM/ODM
OEM Service
Product name: Wooden grooved acoustic panel
Finish: Melamine,veneer, metal
Application: Conference room,office,banquet hall
General use: Office furniture
Material: eco-MDF
Function: Fireproof and eco-friendly
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Sliding

Fireproof Grooved Board Ceiling Auditorium Wood Acoustic Panel 

Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Description


The grooved wood acoustic panel is made of high quality MDF board. According to the customer’s acoustic and decoration requirement, our grooved wood acoustic panel can equipped with outstanding environmental, flame retardant and waterproof function, even can with various colors and finish choices.


Grooved wood acoustic panel is a kind of slit resonance absorption material which is made from high density panel with grooves on the surface and perforated holes at the back side.It has strong selection on the sound spectrum and particular great performance on the middle and low frequency.It has better sound absorption effect on medium and high frequency if there is sound absorption cotton filled at the back side cavity.




Technical information



Product Type

 Grooved Wood Acoustic Panel

Standard Model

 59/5 60/4 28/4 29/3 13/3 14/2 

Non-Standard Model

 40/3 38.5/4 18/3 17/4 8/3 8/2 5/3 6/2

Material

High qulity MDF board

Basic Material

  General, Economic, Fireproof, Moisture-proof, Composite,

  Magnesium, solid wood etc.

Finish

Melamine, Natural Wooden Veneer, Fireproof board, Painting, Metal, Technology veneer, Leather etc.

Color

 Color chart or customized

Size

 133*2440 mm / 197*2440 mm

Thickness

 12mm / 15mm / 18mm

 Fireproof Grade

  A2

ECO Grade

 E1

Application

   Cinema,theatre,conference room,function hall ,etc.


Application


Wooden groooved acoustic panel usually using in following areas:


(1)Home application ( wall acoustic, ceiling sound acoustic)


(2)Entertainment application: KTV, hotel, bar, night club, disco, cinema


(3)Workplace application: office building, meeting room, office room, studio, recording room.


(4)Industrial place application: air conditioning facilities, air compressor room, manufacture workshop.


Wooden grooved acoustic panel installing


First,Fix the keel on the wood frame or baseboard.The separation distance is about 600MM. Fill 32-64kg/m3 density acoustic foam between each two profiles.


Second, Install the clips between the keel and the clip slot of acoustic panel. When many pieces of wooden acoustic panel stack mounting plate to plate. The inter space of each head of plate must at least be 2-3MM.


Third, If the acoustic panel starts installing from the ground by horizontal type,the notch should down to install and use clips if lock.Then install the acoustic panel one by one.


Dilation Joints

Groove acoustic panels are made of medium density fiberboard (MDF) material that expands depending on climate conditions. For this reason, it is important to leave a distance, called dilatation joint,between the perimeter of the wooden panelling and walls and other fixed objects in the premise. 


During summer season, panels expand considerably due to high air humidity and temperature.A minimum dilatation joint of 8mm (1) must be guaranteed. In case of wide surfaces, this joint has to be increased. As a general rule, a minimum of 1,5mm of joint for each lineal meter of panelling is needed at each side of the room. Example: a room of 5m in width needs a minimum of 8 mm of dilatation joint at each side.


Note: minimum 15 mm with a relative air humidity > 65%.Although the material have contact at only one side with a wall or other fixed objects, it is possible that panelling goes off. Dilatation joints are covered with skirting boards or special profiles.

Production

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   More than 500 square meters, free sample.


   Quantity up to 800 square meters, discount 300 USD.


   More than 1500 square meters, extra installing tools.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


FAQ


1. Can I have a sample order for Wooden Grooved Acoustic Panel?


A: Yes, we welcome sample order to test and check quality.


2. What about the lead time?


A:Sample needs 8-12 days, mass production time needs 2-4 weeks for mass order quantity.


3. Do you have any MOQ limit for Wooden Grooved Acoustic Panel order?


A: 100 sqm, quantity under MOQ is negotiable.


4. How do you ship the goods and how long does it take to arrive?


A: We usually ship by sea. It usually takes 3-5 weeks to arrive.


5. How to proceed an order for Wooden Grooved Acoustic Panel?


A: Firstly let us know your requirements or application.


Secondly We quote according to your requirements or our suggestions.


Thirdly customer confirms the samples and places deposit for formal order.


Fourthly We arrange the production.


Product Message
社媒暂无评论
Contact