Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Polyester Acoustic Panels Manufacturer  > 

fabric 100 affordable acoustic panels colorful material Bunge Brand

fabric 100 affordable acoustic panels colorful material Bunge Brand

fabric 100 affordable acoustic panels colorful material Bunge Brand
  • fabric 100 affordable acoustic panels colorful material Bunge Brand
  • fabric 100 affordable acoustic panels colorful material Bunge Brand
  • fabric 100 affordable acoustic panels colorful material Bunge Brand
  • fabric 100 affordable acoustic panels colorful material Bunge Brand
  • fabric 100 affordable acoustic panels colorful material Bunge Brand

fabric 100 affordable acoustic panels colorful material Bunge Brand

Model
9 mm polyester acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Polyester acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 2440 mm
Partition material: 1220 mm
Finish: Polyester fiber
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Modern
Product Details
Guangdong Bunge Building Material Industrial Co.,Ltd pays great attention to product quality and strives for perfection in every detail of products. This enables us to create fine products.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market. glass partitions has the following advantages: well-chosen materials, reasonable design, stable performance, excellent quality, and affordable price. Such a product is up to the market demand.
  • Bunge-Noise Dampening Panels Manufacture | Theater Interior Polyester Acoustic Panels
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has an experienced team to have in-depth research on major enterprises in the industry and to meet customer demand.
  • Guangdong Bunge Building Material Industrial Co.,Ltd always put customers first and provides them with sincere and quality services.
  • Guangdong Bunge Building Material Industrial Co.,Ltd holds the enterprise spirit of 'integrity, pragmatism, breakthrough, and tenacity'. During the development, we focus on sincere service and maintain a pragmatic way. We also seek breakthrough and proactively assume social responsibility. All difficulties are overcame based on tenacity.
  • Guangdong Bunge Building Material Industrial Co.,Ltd has developed the business in the Manufacturing Decoration Materials industry for years. We have established an advanced production line and have developed based on independent production. Now we enjoy a relatively huge influence in the industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd's sales network now covers many provinces and cities such as Northeast China, North China, East China, and South China. And our products are highly praised by consumers.
Company Advantages
1. soundproof ceiling panels can be made by different materials. The product helps to create a multi-purpose room for multiple uses
2. This product has undergone a strict quality management system to ensure high quality. The surface of the product can be arbitrarily decorated by customers
3. The inspection of the product is paid 100% attention. From the materials to the finished products, each step of inspection is strictly conducted and followed. The product ensures a safe user experience
4. As long as there is request for help about design or other things, Guangdong Bunge Building Material Industrial Co.,Ltd will be ready to help for our customers. It is widely used for privacy protection

Theater Interior Polyester Acoustic Panels , Sound Proofing 3d Decorative Wall Panels

Polyester Acoustic Panels Details


1. The acoustic panels of solid material uniformity, has a long life.

 

2. It has a good decorative effect, and more than 40 kinds of colors.

 

3. Environmental performance, formaldehyde content of.

 

4. Flame retardant in line with the national level GB50222-95B1.

 

5. Installation is simple and convenient construction.

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier


Technical Details
Product namePolyester acoustic wall panels
Normal sizeoron decoration material1220*2440*9mm or can be customized
Raw materials100% Polyester fiber
Shapesheet
FeaturesFireproof, waterproof and soundproofing
Sound-absorption coefficient0.9
Density3.2kg/m3 or 4kg/m3
Colorred, green, black, yellow and other color can be customized
Environmental

E1 grade

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier-1


Packing Details & Payment Terms

Packing detail:


offer customized packing, such as drawstring cotton bag, color box, pp bag, hangtag and so on.


Normal packing: pp bag and carton.


Delivery time:


by sea, 10-25days.


Payment term:


1.40% deposit by TT before production, 60% balance payment by TT before shipping.


2.L/C at sight when amount is up to 10,000USD.


Sample: Free sample.

 

Trade Terms:FOB


Shipping: by sea, by air and by express delivery.

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier-2


Polyester Acoustic Panles Application

The polyester acoustic wall panels are suitable for opera, theater, recording studio, recording studio, studio, audition room, radio, business office, function rooms, conference rooms, studio, concert hall, auditorium, gymnasium, leisure and entertainment, Hotels.

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier-3



MAIN TITL


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has experienced a good development with strengths of technology and capacity.
2. A good soundproof ceiling panels needs the efforts of Bunge each staff.
3. Bunge is ambitious and has become one of the most dominant suppliers. Get an offer!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...