EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE workstation furniture manufacturer for office

EBUNGE workstation furniture manufacturer for office

EBUNGE workstation furniture manufacturer for office

Model
Office furniture
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
5000 sets per month
MOQ
No MOQ
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office workstation
Feature: Fine Workmanship
Finish: Melamine,fabric
Application: Office,conference room,call center
General use: Office furniture
Material: MFC board and aluminium frame
Function: Staff Desk
Size: 2400*2800*1100 mm
Color: Can be customized
Style: Modern type
Product Comparison
operalbe wall is in line with the stringent quality standards. The price is more favorable than other products in the industry and the cost performance is relatively high.Compared with similar products, BUNGE PARTITIONS's operalbe wall is more advantageous in the following aspects.
  • v s
Company Advantages
1. EBUNGE modular workstation furniture is professionally designed. It starts with a sketch and then is transformed into a 3D model, finally, it is prototyped using the latest 3D printing technology.
2. This product features robustness. The metal material is well known for its robust property especially when exposed to strong impact, it is not easy to bend or crack.
3. Different from the CRT screen, this product, with an LCD screen, will not generate undesirable electromagnetic radiation nor any UV radiation.
4. The product is a perfect economical privacy screen that can be used in a variety of applications ranging from restaurants, offices, and hotels.

New Style Modular Partition 120 Degree Office Workstation for 3 seater


EBUNGE workstation furniture manufacturer for office-1

Description


The workstation is a combination of a screen and a desk. Now the combination of screen work positions is increasingly used in office.

 

Office workstation has aluminum alloy frame, main surface has two kinds: felt fabric and melamine finish. The felt fabric finish is easy to dirty and difficult to clean, while the melamine surface is wear-resistant and easy to clean.We can supply a variety of colors to let customers choose preferred one and it can be matched with the decoration style to make it more perfect than the felt fabric.


There is three kinds surface for office workstation.


1. Steel board: used for the outer decorative surface of the screen. It is made of one-pole cold-rolled steel plate. The surface is treated by electrostatic spraying. It is better for the overall appearance of the screen. The surface can be punched, punched and so on. , round hole, square convex, square convex, square hole, long hole, etc.)

 

2. Glass: A relatively transparent solid material that forms a continuous network structure during melting, and gradually increases in viscosity during cooling and hardens the silicate-based non-metallic material.

 

3.Fabric: double-sided weaving, with flame retardant, stain-resistant, non-fading, no wool particles and other functions.

Technical information



PRODUCT  NAME

Modular office workstation

DIMENSION

standard, as your require

DESCRIPTION

Model code:B32
       Style: Monolithic Partition
       Thickness: 32mm
       Material: Aluminum frame with melamine board, soft board, magnetic board, white board, accessories rail and glass
       Raceway available: 120H and 175H 
       Max size: 1800mm for max width, 1800mm for max height
       Advantage: Can be combined with 30mm panel (L3 and D32)
      Combination style: L shape, T shape, U shape, Cross shape 
      Max size: 1800mm for max width, 1800mm for max height

Combination style: L shape, T shape, U shape, Cross shape and 120 degree shape

Combine:L6+D32

PACKING

1.KD(KNOW DOWN)

2.REGULAR 7 YEARS EXPORT STANDARD PACKAGE

3.MAINLY WITH CARTON,NECESSARY PROTECTION MATERIAL INSIDE

MOQ

small orders are welcome

TERMS OF PAYMENT

FOB,T/T(30% IN ADVANCE),CIF, EXW. western union monogram

PORT

GUANGZHOU

DELIVERY TIME

20-25DAYS ONCE ORDER CONFINE  AND RECEIPT OF ADVANCED PAYMENT


EBUNGE workstation furniture manufacturer for office-2

Office workstation feature


1.The office workstation is made of panel, aluminum, glass, white board and others.

 

2.Different layout and dimensions can be made by customer's requests.

 

3.Colors of the partition and tabletop are subject to customer's requirements.

 

4.Matching products like movable/fixed pedestal, CPU Trolley, Keyboard Tray are available with us.

 

5.Different combination materials of the partition will be manufactured by your own will.

 

6. Easy to install.


EBUNGE workstation furniture manufacturer for office-3


EBUNGE workstation furniture manufacturer for office-4

Workstation advantage


1.Good quality with competitive price.


2. Modern, Comfortable, Elegant and endurable, Environmentally-friendly materials.


3. The best after-sales service, Mutual Development, Mutual Benefits, so make long time cooperation.


4. Thousands of models for choice , fully meet different customers' demands.


5. Different styles with different material and price range, control cost in the best way.


6. Customized service: OEM, ODM available. 


EBUNGE workstation furniture manufacturer for office-5


Our service


1. Creative CAD Design: Give us your floor plan or send over your room’s measurements (if you don’t have professional designer,only by hand drawing sketch with clear dimensions will work). Our design team will come up with a custom fit solution and hand over a proposal to fit your needs.

 

2. Custom-manufacturing: We create exactly what you want, according to your tastes, and based on your design requirements. In fact, most of our models can be customized according to material, color, or size. You can also give us your design plan and we will create a new mold for you based on the requirements you specify.

 

3. Full plans: For seating, workstations, reception areas, boardrooms, conference rooms, restaurants, hotels, etc. We have extensive experience working with overseas architect designers, contractors, and retailers, and have a wealth of international support.

 

4. Safe and fast delivery: Delivery is mostly by container regularly to the USA and Europe, but if less than FCL, small order by LCL shipment is also an option. We are skilled at consolidating shipments of different buyers into large containers to ship to the same overseas city so they will have the same POD.

 

5. Consultation and post-sale service: We support you throughout the lifetime of your purchase, and our multi-language sales team is available 24/7 to communicate.


EBUNGE workstation furniture manufacturer for office-6

Packing & shipping


Packing:

Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.


Shipment:

For parcel sample / urgent things by air:

We provide as many shipping options as possible, including DHL, UPS, ,FedEx, EMS and Air mail and so on.

 

For mass production big quantity by sea:

 We've cooperated with our shipping forwarder for many years, and they can offer us the competitive price by the vessels.


EBUNGE workstation furniture manufacturer for office-7



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is professional in the industry of workstation furniture .
2. We have a team of experienced professionals. With years of research, they are knowledgeable about industry trends and the critical issues impacting the manufacturing industry.
3. The mission of EBUNGE motivates each staff to work hard. Get info! EBUNGE believes it is essential for EBUNGE to implement the plan of being a modern workstation office furniture supplier. Get info! Guangdong Bunge Building Material Industrial Co.,Ltd has a unique corporate advantage with its modular office workstation. Get info! The service quality has been always highly stressed by EBUNGE. Get info!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...