EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE wooden movable partition wall systems customized for meeting room

EBUNGE wooden movable partition wall systems customized for meeting room

EBUNGE wooden movable partition wall systems customized for meeting room

Model
65 mm sliding partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding partition walls
Feature: Sound proofing
Partition material: MDF+Melamine
Finish: Melamine,laminate
Application: Hotel banquet hall
General use: Commercial furniture
Material: 100% Polyester Fiber
Function: Save space
Size: Can be customized
Color: Can be customized
Style: Sliding doors
Product Comparison
office furniture, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.Compared with other same kind of products in the market, BUNGE PARTITIONS's office furniture is equipped with the following outstanding advantages.
  • EBUNGE-movable walls | Movable Walls | EBUNGE
    v s
    EBUNGE-movable walls | Movable Walls | EBUNGE-1
Application Scope
office furniture, one of BUNGE PARTITIONS's main products, is deeply favored by customers. With wide application, it can be applied to different industries and fields.With rich manufacturing experience and strong production capability, BUNGE PARTITIONS is able to provide professional solutions according to customers' actual needs.
  • EBUNGE-movable walls | Movable Walls | EBUNGE-2
Company Advantages
1. movable walls is movable partition wall systems, and especially fits for the usage in residential movable walls .
2. This product is functional, which caters to the customers' needs.
3. All incoming materials are inspected to ensure they match the quality requirement.
4. This product price has the competition ability, deeply the market welcome, has the huge market potential.
5. This product is widely used in various applications.

Banquet Hall Foldable Room Partition Panels Acoustic Sliding Partition Walls

Finished Project

A nice project for meeting room in Bangkok,Thailand.


The client chose the plywood finish, and he will decorate the surface by wallpaper at project site.


Size:14.65*5.5 meters, totally 80.6 square meters.


  • EBUNGE wooden movable partition wall systems customized for meeting room-1EBUNGE wooden movable partition wall systems customized for meeting room-2EBUNGE wooden movable partition wall systems customized for meeting room-3

    EBUNGE wooden movable partition wall systems customized for meeting room-4

Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm sliding partition walls ONLY FOR $85.

 

85 mm sliding partition walls ONLY FOR $98.

 

100 mm sliding partition walls ONLY FOR $118.

 

125 ultra-high system sliding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

EBUNGE wooden movable partition wall systems customized for meeting room-5

Product Description


  • BUNGE sliding partition walls are used to divide meeting rooms, conference rooms, restaurant and banquet halls etc., it provides convenient and effective space management solutions, the panels move on a ceiling track with no requirement of floor guides or rails, its has been extensively applied to hotel industry.

  • BUNGE offers products and service with the end user in mind. We build in features that provide benefits to the owner over the life of the movable partition walls. Features such as protective edge trim will keep your partitions looking good for many years to come.

  • The banquet hall sliding partition walls consist of a series of interlocking flat panels and the fast set retractable top and bottom seals provide the easiest in-field operation, a simple half-turn of the waist high removable handle extends or retracts the sound seals.

  • The quick set retractable seals save the owner a great deal of time during setup and take down

    Time means money, especially for clients that rent their facilities for meetings and other functions.

  • BUNGE provides banquet hall sliding partition walls panel finishes such as melamine, fabric, leather, wood veneer, high-pressure laminate or other custom surfaces, panels also be supplied unfinished(raw mdf or plywood) for field decoration to compliment the building environment.

EBUNGE wooden movable partition wall systems customized for meeting room-6
EBUNGE wooden movable partition wall systems customized for meeting room-7
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of banquet hall sliding partition walls. The sliding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

EBUNGE wooden movable partition wall systems customized for meeting room-8

Components of Sliding Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the sliding partition walls with wheels.

Wheels/Rollers:  It is the carrier for the sliding partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the sliding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE wooden movable partition wall systems customized for meeting room-9EBUNGE wooden movable partition wall systems customized for meeting room-10

EBUNGE wooden movable partition wall systems customized for meeting room-11

Parking Styles of Sliding Partition Walls

As you know, when we do not use the banquet hall sliding partition walls, we can park them to the parking area. Actually there are many parking styles for the sliding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


EBUNGE wooden movable partition wall systems customized for meeting room-12EBUNGE wooden movable partition wall systems customized for meeting room-13

EBUNGE wooden movable partition wall systems customized for meeting room-14

Different Finishes of Sliding Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

  • EBUNGE wooden movable partition wall systems customized for meeting room-15EBUNGE wooden movable partition wall systems customized for meeting room-16

    EBUNGE wooden movable partition wall systems customized for meeting room-17

Package for Tracks System
  • EBUNGE wooden movable partition wall systems customized for meeting room-18EBUNGE wooden movable partition wall systems customized for meeting room-19

    EBUNGE wooden movable partition wall systems customized for meeting room-20



Company Features
1. Our movable walls wins us many distinguished customers, such as movable partition wall systems.
2. With strong technical force, Guangdong Bunge Building Material Industrial Co.,Ltd has a complete range of specifications of movable walls.
3. EBUNGE has decided to become a leading company focused on providing the best service. Inquire! The goal of Guangdong Bunge Building Material Industrial Co.,Ltd is to take the leading edge in the movable walls industry. Inquire! Bunge Partitions seeks common ground while reserving differences with our customers. Inquire!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...