EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE wood conference tables personalized for work

EBUNGE wood conference tables personalized for work

EBUNGE wood conference tables personalized for work

Model
BG modern conference tables
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union also available
Delivery Time
7 - 15 days
Supply Ability
50000 sets per month
MOQ
No MOQ, small quantity welcome
Packing Details
Paper cater, outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Modern conference tables
Feature: Modern
Finish: Melamine
Application: Conference room, meeting room
General use: Office furniture
Material: Melamine+metal structre
Function: Office staff work
Size: 2400*1200 mm, accept customized
Color: Optional
Product Details
BUNGE PARTITIONS's movable wall is of exquisite workmanship, which is reflected in the details.movable wall, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.
Company Advantages
1. EBUNGE boardroom conference table is manufactured by a persist team who has been working hard.
2. The product has reliable working performance. It is able to withstand impact and high loading working conditions without sacrificing its efficiency.
3. Guangdong Bunge Building Material Industrial Co.,Ltd is responsible for final quality testing result.
4. As a specialized company, Guangdong Bunge Building Material Industrial Co.,Ltd is highly recommended by customers.

Office Furniture Modern Conference Table Training Table Negotiating Tables


Product description

Product nameConference table
Brand nameBUNGE
Brand nameGuangzhou, Guangdong, China
SizeLength1800/2000/2400/2800/3200/3600/4000/4800
Width1000/1200/1400
Height750
MaterialE1 Melamine panel
Port of loadingGuangzhou/Shenzhen
Delivery time20-30 days after receiving payment
InstallationDisassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos)
PackageHigh resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box
ServiceSupport color and size customization, please contact customer service for details!

EBUNGE wood conference tables personalized for work-1

EBUNGE wood conference tables personalized for work-2

Advantages

1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.



EBUNGE wood conference tables personalized for work-3


EBUNGE wood conference tables personalized for work-4

Packaging & Shipping

Detailed Packing:


1. KD packing.


2. Shipping marks can be decided by customers.


3. Outside: thick carton to reduce extrusion & collision in transit.


4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.


Shipping Details:


1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.


2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.


3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

EBUNGE wood conference tables personalized for work-5

EBUNGE wood conference tables personalized for work-6




We offer

1.Molding workshop

2.Aluminum-extrusion workshop

3.Injection and die-casting workshop

4.Ironware workshop

5.Anodized workshop

6.Powder coating workshop

7.Assembling workshop.

All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.

So our product are high-quality with affordable price. That means cost-effective.

EBUNGE wood conference tables personalized for work-7



Company Features
1. High-quality wood conference tables is one of the reason that makes EBUNGE prosperous.
2. It is of highly advanced technology that our conference table has got more and more attention among customers.
3. We are setting sustainability performance goals that are strategic and meaningful. We will upgrade our production procedures by introducing highly efficient machines or cutting resources uses, so as find our future in sustainable management. We have formulated policies to support our sustainability work. We will ensure that high-quality production and safe working conditions across the value chain. We strive for energy-efficient production. There are many innovative technologies that have been selected to minimize or eliminate emissions.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...