EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE white cubicle desk series for office

EBUNGE white cubicle desk series for office

EBUNGE white cubicle desk series for office

Model
BG conference room tables
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T or Western Union also available
Delivery Time
7 - 15 days
Supply Ability
50000 sets per month
MOQ
No MOQ, small quantity welcome
Packing Details
Paper carton,outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Conference room tables
Feature: Modern conference tables
Finish: Melamine
Application: Meeting room tables
General use: Office furniture
Material: Melamine+metal structure
Function: Office staff work
Size: 2400*1200 mm, accept customized
Color: Optional
Company Advantages
1. The raw materials of EBUNGE modern office workstations are selected and processed by our qualified technicians who uphold the highest safety standards in the sauna industry. It displays a gorgeous and delicate appearance
2. The product is able to withstand a large range of temperatures so engineers can use it without worrying about failure. Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function
3. In the aspect of design, the structure of cubicle desk is innovatively combined with the characteristics of modern office workstations . The product ensures a safe user experience
4. With the performance of modern office workstations and computer workstation furniture, cubicle desk is a product which can represent excellence of EBUNGE. It adopts the high-performance MDF board and rockwool panel
5. With a process of quality control, the quality is guaranteed to be high quality.It is widely used for privacy protection

Modern Office Furniture Steel Frame Simple Meeting Conference Room Tables for 6-10 Person


Product description

Product nameConference table
Brand nameBUNGE
Brand nameGuangzhou, Guangdong, China
SizeLength1800/2000/2400/2800/3200/3600/4000/4800
Width1000/1200/1400
Height750
MaterialE1 Melamine panel
Port of loadingGuangzhou/Shenzhen
Delivery time20-30 days after receiving payment
InstallationDisassembly and delivery, arrival needs to be installed by yourself (liftingFor installation drawings and installation videos)
PackageHigh resilience pearl cotton, high shockproof foam, corner guard,High-strength anti-paper pressure box
ServiceSupport color and size customization, please contact customer service for details!

EBUNGE white cubicle desk series for office-1

Advantages

1--Conference room tables design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.



EBUNGE white cubicle desk series for office-2


EBUNGE white cubicle desk series for office-3

EBUNGE white cubicle desk series for office-4

Packaging & Shipping

Detailed Packing:


1. KD packing.


2. Shipping marks can be decided by customers.


3. Outside: thick carton to reduce extrusion & collision in transit.


4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.


Shipping Details:


1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.


2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.


3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

EBUNGE white cubicle desk series for office-5

EBUNGE white cubicle desk series for office-6




We offer

1.Molding workshop

2.Aluminum-extrusion workshop

3.Injection and die-casting workshop

4.Ironware workshop

5.Anodized workshop

6.Powder coating workshop

7.Assembling workshop.

All workshop have mature producing system and craftsmanship. We can strictly control quality and cost.

So our product are high-quality with affordable price. That means cost-effective.

EBUNGE white cubicle desk series for office-7



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd ​​is a producer that concentrates on producing modern office workstations . The team in Guangdong Bunge Building Material Industrial Co.,Ltd is focused, active and capable.
2. The factory production lines of Guangdong Bunge Building Material Industrial Co.,Ltd are all run under the international standard.
3. cubicle desk is highly qualified in the industry. Our company adheres to the business principle of "Technology for development and quality for existence". We will rely on introducing cutting-edge manufacturing technologies in an effort to improve product quality.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...