EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE wall divider design manufacturer for restaurant

EBUNGE wall divider design manufacturer for restaurant

EBUNGE wall divider design manufacturer for restaurant

Model
85 mm office partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendlyDivide space
Size: 2440*133 mm, 2440*197 mmThickness 83 mm
Color: Can be customized
Style: Sliding
Enterprise Strength
  • BUNGE PARTITIONS provides comprehensive and professional services such as design solutions and technical consultations based on the actual needs of customers.
Product Details
BUNGE PARTITIONS's operalbe wall has excellent performances by virtue of the following excellent details.Under the guidance of market, BUNGE PARTITIONS constantly strives for innovation. operalbe wall has reliable quality, stable performance, good design, and great practicality.
Company Advantages
1. The design of EBUNGE conference room dividers partitions represents the concepts of freshness and simplicity, which now has been the basic concepts in the sanitary ware industry.
2. The product is non-toxic. All the raw materials are dyed with environmentally friendly and safe chemical reagents.
3. The product features the desired reliability. It does not tend to shutdown due to emergencies such as instantaneous change of current or sudden power cut.
4. The product has been installed in many places from the convention center and entertainment venues to hotel banquets and restaurants.


Aluminum Frame Decorative Modern Folding Sliding Office Partition Walls


EBUNGE wall divider design manufacturer for restaurant-1

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm office partition walls ONLY FOR $85.

 

85 mm office partition walls ONLY FOR $98.

 

100 mm office partition walls ONLY FOR $118.

 

125 ultra-high system office partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

EBUNGE wall divider design manufacturer for restaurant-2

Product Description


  •   Extensive worldwide sales network that has proved that our office partition walls work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

EBUNGE wall divider design manufacturer for restaurant-3
EBUNGE wall divider design manufacturer for restaurant-4
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

EBUNGE wall divider design manufacturer for restaurant-5

Components of Office Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the office partition walls with wheels.

Wheels/Rollers:  It is the carrier for the office partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the office partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE wall divider design manufacturer for restaurant-6
EBUNGE wall divider design manufacturer for restaurant-7
EBUNGE wall divider design manufacturer for restaurant-8

Parking Styles of Office Partition Walls

As you know, when we do not use the sliding office partition walls, we can park them to the parking area. Actually there are many parking styles for the office partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


EBUNGE wall divider design manufacturer for restaurant-9
EBUNGE wall divider design manufacturer for restaurant-10
EBUNGE wall divider design manufacturer for restaurant-11



Different Finishes of Office Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

EBUNGE wall divider design manufacturer for restaurant-12
EBUNGE wall divider design manufacturer for restaurant-13
EBUNGE wall divider design manufacturer for restaurant-14
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of office partition walls. The sliding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

EBUNGE wall divider design manufacturer for restaurant-15



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is in a leading position in domestic and foreign counterparts.
2. The plant is located in an advantageous place where economic conditions and logistics are unique. This geographical location has enabled us to gain many financial supports and costs reductions in transportation.
3. Making the company the first wall divider design manufacturer is the lifelong pursuit of every EBUNGE person. Inquiry! EBUNGE ​aims to improve the quality of life of customers. Inquiry! Guangdong Bunge Building Material Industrial Co.,Ltd has always been committed to advocating a culture of cooperation and persisting in work. Inquiry!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...