EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE top quality ergonomic desk chair directly sale for meeting room

EBUNGE top quality ergonomic desk chair directly sale for meeting room

EBUNGE top quality ergonomic desk chair directly sale for meeting room

Model
Office stackable chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office stackable chair
Feature: Office Sitting Chairs
Finish: Fabric, pu leather, mesh
Application: Office, conference room,training room,classroom and etc
General use: Office furniture
Material: PP material
Function: Office Sitting Chairs
Size: 480*470*790 mm
Color: Can be customized
Company Advantages
1. The design of EBUNGE executive chair adopts an advanced software program. This software is able to calculate panel material quantities, manufacture measurements, and cost of the partition wall system. The product can far reach from one wall to another wall
2. The product offers a high level of acoustic integrity and simplicity of movement, which is the perfect choice for an economical, practical and elegant space division. It will not be easy to swing after being reliably installed
3. The product is taken into seriously about its reliability and stability during the inspections. It is conducted by a strict and professional quality inspection team at every step. The product is found to have good sound insulation
4. Product quality is guaranteed because strict quality control processes effectively eliminate defects. Equipped with a sealing device, the product is praised for its tight sealing performance
5. This product has established a reputation for quality because appropriate quality management systems conforming to the International Standard ISO 9001 requirements are established and implemented for its production. The patterns of the product can be customized

Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-1

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-2

EBUNGE top quality ergonomic desk chair directly sale for meeting room-3

EBUNGE top quality ergonomic desk chair directly sale for meeting room-4

EBUNGE top quality ergonomic desk chair directly sale for meeting room-5

EBUNGE top quality ergonomic desk chair directly sale for meeting room-6


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-7

EBUNGE top quality ergonomic desk chair directly sale for meeting room-8

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-9

EBUNGE top quality ergonomic desk chair directly sale for meeting room-10

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-11

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-12

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-13

EBUNGE top quality ergonomic desk chair directly sale for meeting room-14

EBUNGE top quality ergonomic desk chair directly sale for meeting room-15

EBUNGE top quality ergonomic desk chair directly sale for meeting room-16

EBUNGE top quality ergonomic desk chair directly sale for meeting room-17


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-18

EBUNGE top quality ergonomic desk chair directly sale for meeting room-19

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-20

EBUNGE top quality ergonomic desk chair directly sale for meeting room-21

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-22

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-23

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-24

EBUNGE top quality ergonomic desk chair directly sale for meeting room-25

EBUNGE top quality ergonomic desk chair directly sale for meeting room-26

EBUNGE top quality ergonomic desk chair directly sale for meeting room-27

EBUNGE top quality ergonomic desk chair directly sale for meeting room-28


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-29

EBUNGE top quality ergonomic desk chair directly sale for meeting room-30

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-31

EBUNGE top quality ergonomic desk chair directly sale for meeting room-32

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-33

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-34

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-35

EBUNGE top quality ergonomic desk chair directly sale for meeting room-36

EBUNGE top quality ergonomic desk chair directly sale for meeting room-37

EBUNGE top quality ergonomic desk chair directly sale for meeting room-38

EBUNGE top quality ergonomic desk chair directly sale for meeting room-39


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-40

EBUNGE top quality ergonomic desk chair directly sale for meeting room-41

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-42

EBUNGE top quality ergonomic desk chair directly sale for meeting room-43

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-44

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-45

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-46

EBUNGE top quality ergonomic desk chair directly sale for meeting room-47

EBUNGE top quality ergonomic desk chair directly sale for meeting room-48

EBUNGE top quality ergonomic desk chair directly sale for meeting room-49

EBUNGE top quality ergonomic desk chair directly sale for meeting room-50


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-51

EBUNGE top quality ergonomic desk chair directly sale for meeting room-52

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-53

EBUNGE top quality ergonomic desk chair directly sale for meeting room-54

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-55

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-56

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-57

EBUNGE top quality ergonomic desk chair directly sale for meeting room-58

EBUNGE top quality ergonomic desk chair directly sale for meeting room-59

EBUNGE top quality ergonomic desk chair directly sale for meeting room-60

EBUNGE top quality ergonomic desk chair directly sale for meeting room-61


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-62

EBUNGE top quality ergonomic desk chair directly sale for meeting room-63

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-64

EBUNGE top quality ergonomic desk chair directly sale for meeting room-65

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-66

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-67

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-68

EBUNGE top quality ergonomic desk chair directly sale for meeting room-69

EBUNGE top quality ergonomic desk chair directly sale for meeting room-70

EBUNGE top quality ergonomic desk chair directly sale for meeting room-71

EBUNGE top quality ergonomic desk chair directly sale for meeting room-72


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-73

EBUNGE top quality ergonomic desk chair directly sale for meeting room-74

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-75

EBUNGE top quality ergonomic desk chair directly sale for meeting room-76

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-77

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-78

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-79

EBUNGE top quality ergonomic desk chair directly sale for meeting room-80

EBUNGE top quality ergonomic desk chair directly sale for meeting room-81

EBUNGE top quality ergonomic desk chair directly sale for meeting room-82

EBUNGE top quality ergonomic desk chair directly sale for meeting room-83


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-84

EBUNGE top quality ergonomic desk chair directly sale for meeting room-85

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-86

EBUNGE top quality ergonomic desk chair directly sale for meeting room-87

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-88

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-89

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-90

EBUNGE top quality ergonomic desk chair directly sale for meeting room-91

EBUNGE top quality ergonomic desk chair directly sale for meeting room-92

EBUNGE top quality ergonomic desk chair directly sale for meeting room-93

EBUNGE top quality ergonomic desk chair directly sale for meeting room-94


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-95

EBUNGE top quality ergonomic desk chair directly sale for meeting room-96

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-97

EBUNGE top quality ergonomic desk chair directly sale for meeting room-98

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-99

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-100

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-101

EBUNGE top quality ergonomic desk chair directly sale for meeting room-102

EBUNGE top quality ergonomic desk chair directly sale for meeting room-103

EBUNGE top quality ergonomic desk chair directly sale for meeting room-104

EBUNGE top quality ergonomic desk chair directly sale for meeting room-105


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-106

EBUNGE top quality ergonomic desk chair directly sale for meeting room-107

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-108

EBUNGE top quality ergonomic desk chair directly sale for meeting room-109

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-110

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-111

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-112

EBUNGE top quality ergonomic desk chair directly sale for meeting room-113

EBUNGE top quality ergonomic desk chair directly sale for meeting room-114

EBUNGE top quality ergonomic desk chair directly sale for meeting room-115

EBUNGE top quality ergonomic desk chair directly sale for meeting room-116


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-117

EBUNGE top quality ergonomic desk chair directly sale for meeting room-118

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-119

EBUNGE top quality ergonomic desk chair directly sale for meeting room-120

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-121

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-122

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-123

EBUNGE top quality ergonomic desk chair directly sale for meeting room-124

EBUNGE top quality ergonomic desk chair directly sale for meeting room-125

EBUNGE top quality ergonomic desk chair directly sale for meeting room-126

EBUNGE top quality ergonomic desk chair directly sale for meeting room-127


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-128

EBUNGE top quality ergonomic desk chair directly sale for meeting room-129

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-130

EBUNGE top quality ergonomic desk chair directly sale for meeting room-131

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-132

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-133

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-134

EBUNGE top quality ergonomic desk chair directly sale for meeting room-135

EBUNGE top quality ergonomic desk chair directly sale for meeting room-136

EBUNGE top quality ergonomic desk chair directly sale for meeting room-137

EBUNGE top quality ergonomic desk chair directly sale for meeting room-138


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-139

EBUNGE top quality ergonomic desk chair directly sale for meeting room-140

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-141

EBUNGE top quality ergonomic desk chair directly sale for meeting room-142

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-143

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-144

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-145

EBUNGE top quality ergonomic desk chair directly sale for meeting room-146

EBUNGE top quality ergonomic desk chair directly sale for meeting room-147

EBUNGE top quality ergonomic desk chair directly sale for meeting room-148

EBUNGE top quality ergonomic desk chair directly sale for meeting room-149


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-150

EBUNGE top quality ergonomic desk chair directly sale for meeting room-151

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-152

EBUNGE top quality ergonomic desk chair directly sale for meeting room-153

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-154

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-155

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-156

EBUNGE top quality ergonomic desk chair directly sale for meeting room-157

EBUNGE top quality ergonomic desk chair directly sale for meeting room-158

EBUNGE top quality ergonomic desk chair directly sale for meeting room-159

EBUNGE top quality ergonomic desk chair directly sale for meeting room-160


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-161

EBUNGE top quality ergonomic desk chair directly sale for meeting room-162

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-163

EBUNGE top quality ergonomic desk chair directly sale for meeting room-164

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-165

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-166

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-167

EBUNGE top quality ergonomic desk chair directly sale for meeting room-168

EBUNGE top quality ergonomic desk chair directly sale for meeting room-169

EBUNGE top quality ergonomic desk chair directly sale for meeting room-170

EBUNGE top quality ergonomic desk chair directly sale for meeting room-171


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-172

EBUNGE top quality ergonomic desk chair directly sale for meeting room-173

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-174

EBUNGE top quality ergonomic desk chair directly sale for meeting room-175

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-176

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-177

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-178

EBUNGE top quality ergonomic desk chair directly sale for meeting room-179

EBUNGE top quality ergonomic desk chair directly sale for meeting room-180

EBUNGE top quality ergonomic desk chair directly sale for meeting room-181

EBUNGE top quality ergonomic desk chair directly sale for meeting room-182


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-183

EBUNGE top quality ergonomic desk chair directly sale for meeting room-184

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-185

EBUNGE top quality ergonomic desk chair directly sale for meeting room-186

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-187

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-188

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-189

EBUNGE top quality ergonomic desk chair directly sale for meeting room-190

EBUNGE top quality ergonomic desk chair directly sale for meeting room-191

EBUNGE top quality ergonomic desk chair directly sale for meeting room-192

EBUNGE top quality ergonomic desk chair directly sale for meeting room-193


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-194

EBUNGE top quality ergonomic desk chair directly sale for meeting room-195

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-196

EBUNGE top quality ergonomic desk chair directly sale for meeting room-197

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-198

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-199

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-200

EBUNGE top quality ergonomic desk chair directly sale for meeting room-201

EBUNGE top quality ergonomic desk chair directly sale for meeting room-202

EBUNGE top quality ergonomic desk chair directly sale for meeting room-203

EBUNGE top quality ergonomic desk chair directly sale for meeting room-204


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-205

EBUNGE top quality ergonomic desk chair directly sale for meeting room-206

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-207

EBUNGE top quality ergonomic desk chair directly sale for meeting room-208

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-209

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-210

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-211

EBUNGE top quality ergonomic desk chair directly sale for meeting room-212

EBUNGE top quality ergonomic desk chair directly sale for meeting room-213

EBUNGE top quality ergonomic desk chair directly sale for meeting room-214

EBUNGE top quality ergonomic desk chair directly sale for meeting room-215


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-216

EBUNGE top quality ergonomic desk chair directly sale for meeting room-217

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-218

EBUNGE top quality ergonomic desk chair directly sale for meeting room-219

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-220

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-221

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-222

EBUNGE top quality ergonomic desk chair directly sale for meeting room-223

EBUNGE top quality ergonomic desk chair directly sale for meeting room-224

EBUNGE top quality ergonomic desk chair directly sale for meeting room-225

EBUNGE top quality ergonomic desk chair directly sale for meeting room-226


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-227

EBUNGE top quality ergonomic desk chair directly sale for meeting room-228

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-229

EBUNGE top quality ergonomic desk chair directly sale for meeting room-230

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-231

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-232

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-233

EBUNGE top quality ergonomic desk chair directly sale for meeting room-234

EBUNGE top quality ergonomic desk chair directly sale for meeting room-235

EBUNGE top quality ergonomic desk chair directly sale for meeting room-236

EBUNGE top quality ergonomic desk chair directly sale for meeting room-237


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-238

EBUNGE top quality ergonomic desk chair directly sale for meeting room-239

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-240

EBUNGE top quality ergonomic desk chair directly sale for meeting room-241

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-242

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-243

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-244

EBUNGE top quality ergonomic desk chair directly sale for meeting room-245

EBUNGE top quality ergonomic desk chair directly sale for meeting room-246

EBUNGE top quality ergonomic desk chair directly sale for meeting room-247

EBUNGE top quality ergonomic desk chair directly sale for meeting room-248


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-249

EBUNGE top quality ergonomic desk chair directly sale for meeting room-250

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-251

EBUNGE top quality ergonomic desk chair directly sale for meeting room-252

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-253

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-254

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-255

EBUNGE top quality ergonomic desk chair directly sale for meeting room-256

EBUNGE top quality ergonomic desk chair directly sale for meeting room-257

EBUNGE top quality ergonomic desk chair directly sale for meeting room-258

EBUNGE top quality ergonomic desk chair directly sale for meeting room-259


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-260

EBUNGE top quality ergonomic desk chair directly sale for meeting room-261

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-262

EBUNGE top quality ergonomic desk chair directly sale for meeting room-263

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-264

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-265

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-266

EBUNGE top quality ergonomic desk chair directly sale for meeting room-267

EBUNGE top quality ergonomic desk chair directly sale for meeting room-268

EBUNGE top quality ergonomic desk chair directly sale for meeting room-269

EBUNGE top quality ergonomic desk chair directly sale for meeting room-270


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-271

EBUNGE top quality ergonomic desk chair directly sale for meeting room-272

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-273

EBUNGE top quality ergonomic desk chair directly sale for meeting room-274

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-275

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-276

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-277

EBUNGE top quality ergonomic desk chair directly sale for meeting room-278

EBUNGE top quality ergonomic desk chair directly sale for meeting room-279

EBUNGE top quality ergonomic desk chair directly sale for meeting room-280

EBUNGE top quality ergonomic desk chair directly sale for meeting room-281


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-282

EBUNGE top quality ergonomic desk chair directly sale for meeting room-283

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-284

EBUNGE top quality ergonomic desk chair directly sale for meeting room-285

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-286

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-287

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-288

EBUNGE top quality ergonomic desk chair directly sale for meeting room-289

EBUNGE top quality ergonomic desk chair directly sale for meeting room-290

EBUNGE top quality ergonomic desk chair directly sale for meeting room-291

EBUNGE top quality ergonomic desk chair directly sale for meeting room-292


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-293

EBUNGE top quality ergonomic desk chair directly sale for meeting room-294

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-295

EBUNGE top quality ergonomic desk chair directly sale for meeting room-296

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-297

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-298

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-299

EBUNGE top quality ergonomic desk chair directly sale for meeting room-300

EBUNGE top quality ergonomic desk chair directly sale for meeting room-301

EBUNGE top quality ergonomic desk chair directly sale for meeting room-302

EBUNGE top quality ergonomic desk chair directly sale for meeting room-303


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-304

EBUNGE top quality ergonomic desk chair directly sale for meeting room-305

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-306

EBUNGE top quality ergonomic desk chair directly sale for meeting room-307

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-308

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-309

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-310

EBUNGE top quality ergonomic desk chair directly sale for meeting room-311

EBUNGE top quality ergonomic desk chair directly sale for meeting room-312

EBUNGE top quality ergonomic desk chair directly sale for meeting room-313

EBUNGE top quality ergonomic desk chair directly sale for meeting room-314


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-315

EBUNGE top quality ergonomic desk chair directly sale for meeting room-316

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-317

EBUNGE top quality ergonomic desk chair directly sale for meeting room-318

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-319

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-320

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-321

EBUNGE top quality ergonomic desk chair directly sale for meeting room-322

EBUNGE top quality ergonomic desk chair directly sale for meeting room-323

EBUNGE top quality ergonomic desk chair directly sale for meeting room-324

EBUNGE top quality ergonomic desk chair directly sale for meeting room-325


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-326

EBUNGE top quality ergonomic desk chair directly sale for meeting room-327

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-328

EBUNGE top quality ergonomic desk chair directly sale for meeting room-329

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-330

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-331

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-332

EBUNGE top quality ergonomic desk chair directly sale for meeting room-333

EBUNGE top quality ergonomic desk chair directly sale for meeting room-334

EBUNGE top quality ergonomic desk chair directly sale for meeting room-335

EBUNGE top quality ergonomic desk chair directly sale for meeting room-336


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-337

EBUNGE top quality ergonomic desk chair directly sale for meeting room-338

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-339

EBUNGE top quality ergonomic desk chair directly sale for meeting room-340

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-341

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-342

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-343

EBUNGE top quality ergonomic desk chair directly sale for meeting room-344

EBUNGE top quality ergonomic desk chair directly sale for meeting room-345

EBUNGE top quality ergonomic desk chair directly sale for meeting room-346

EBUNGE top quality ergonomic desk chair directly sale for meeting room-347


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-348

EBUNGE top quality ergonomic desk chair directly sale for meeting room-349

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-350

EBUNGE top quality ergonomic desk chair directly sale for meeting room-351

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-352

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-353

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-354

EBUNGE top quality ergonomic desk chair directly sale for meeting room-355

EBUNGE top quality ergonomic desk chair directly sale for meeting room-356

EBUNGE top quality ergonomic desk chair directly sale for meeting room-357

EBUNGE top quality ergonomic desk chair directly sale for meeting room-358


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-359

EBUNGE top quality ergonomic desk chair directly sale for meeting room-360

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-361

EBUNGE top quality ergonomic desk chair directly sale for meeting room-362

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-363

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-364

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-365

EBUNGE top quality ergonomic desk chair directly sale for meeting room-366

EBUNGE top quality ergonomic desk chair directly sale for meeting room-367

EBUNGE top quality ergonomic desk chair directly sale for meeting room-368

EBUNGE top quality ergonomic desk chair directly sale for meeting room-369


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-370

EBUNGE top quality ergonomic desk chair directly sale for meeting room-371

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-372

EBUNGE top quality ergonomic desk chair directly sale for meeting room-373

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-374

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-375

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-376

EBUNGE top quality ergonomic desk chair directly sale for meeting room-377

EBUNGE top quality ergonomic desk chair directly sale for meeting room-378

EBUNGE top quality ergonomic desk chair directly sale for meeting room-379

EBUNGE top quality ergonomic desk chair directly sale for meeting room-380


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-381

EBUNGE top quality ergonomic desk chair directly sale for meeting room-382

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-383

EBUNGE top quality ergonomic desk chair directly sale for meeting room-384

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-385

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-386

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-387

EBUNGE top quality ergonomic desk chair directly sale for meeting room-388

EBUNGE top quality ergonomic desk chair directly sale for meeting room-389

EBUNGE top quality ergonomic desk chair directly sale for meeting room-390

EBUNGE top quality ergonomic desk chair directly sale for meeting room-391


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-392

EBUNGE top quality ergonomic desk chair directly sale for meeting room-393

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-394

EBUNGE top quality ergonomic desk chair directly sale for meeting room-395

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-396

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-397

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-398

EBUNGE top quality ergonomic desk chair directly sale for meeting room-399

EBUNGE top quality ergonomic desk chair directly sale for meeting room-400

EBUNGE top quality ergonomic desk chair directly sale for meeting room-401

EBUNGE top quality ergonomic desk chair directly sale for meeting room-402


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-403

EBUNGE top quality ergonomic desk chair directly sale for meeting room-404

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-405

EBUNGE top quality ergonomic desk chair directly sale for meeting room-406

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-407

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-408

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-409

EBUNGE top quality ergonomic desk chair directly sale for meeting room-410

EBUNGE top quality ergonomic desk chair directly sale for meeting room-411

EBUNGE top quality ergonomic desk chair directly sale for meeting room-412

EBUNGE top quality ergonomic desk chair directly sale for meeting room-413


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-414

EBUNGE top quality ergonomic desk chair directly sale for meeting room-415

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-416

EBUNGE top quality ergonomic desk chair directly sale for meeting room-417

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-418

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-419

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-420

EBUNGE top quality ergonomic desk chair directly sale for meeting room-421

EBUNGE top quality ergonomic desk chair directly sale for meeting room-422

EBUNGE top quality ergonomic desk chair directly sale for meeting room-423

EBUNGE top quality ergonomic desk chair directly sale for meeting room-424


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-425

EBUNGE top quality ergonomic desk chair directly sale for meeting room-426

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-427

EBUNGE top quality ergonomic desk chair directly sale for meeting room-428

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-429

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-430

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-431

EBUNGE top quality ergonomic desk chair directly sale for meeting room-432

EBUNGE top quality ergonomic desk chair directly sale for meeting room-433

EBUNGE top quality ergonomic desk chair directly sale for meeting room-434

EBUNGE top quality ergonomic desk chair directly sale for meeting room-435


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-436

EBUNGE top quality ergonomic desk chair directly sale for meeting room-437

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-438

EBUNGE top quality ergonomic desk chair directly sale for meeting room-439

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-440

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-441

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-442

EBUNGE top quality ergonomic desk chair directly sale for meeting room-443

EBUNGE top quality ergonomic desk chair directly sale for meeting room-444

EBUNGE top quality ergonomic desk chair directly sale for meeting room-445

EBUNGE top quality ergonomic desk chair directly sale for meeting room-446


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-447

EBUNGE top quality ergonomic desk chair directly sale for meeting room-448

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-449

EBUNGE top quality ergonomic desk chair directly sale for meeting room-450

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-451

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-452

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-453

EBUNGE top quality ergonomic desk chair directly sale for meeting room-454

EBUNGE top quality ergonomic desk chair directly sale for meeting room-455

EBUNGE top quality ergonomic desk chair directly sale for meeting room-456

EBUNGE top quality ergonomic desk chair directly sale for meeting room-457


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-458

EBUNGE top quality ergonomic desk chair directly sale for meeting room-459

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-460

EBUNGE top quality ergonomic desk chair directly sale for meeting room-461

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-462

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-463

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-464

EBUNGE top quality ergonomic desk chair directly sale for meeting room-465

EBUNGE top quality ergonomic desk chair directly sale for meeting room-466

EBUNGE top quality ergonomic desk chair directly sale for meeting room-467

EBUNGE top quality ergonomic desk chair directly sale for meeting room-468


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-469

EBUNGE top quality ergonomic desk chair directly sale for meeting room-470

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-471

EBUNGE top quality ergonomic desk chair directly sale for meeting room-472

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-473

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-474

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-475

EBUNGE top quality ergonomic desk chair directly sale for meeting room-476

EBUNGE top quality ergonomic desk chair directly sale for meeting room-477

EBUNGE top quality ergonomic desk chair directly sale for meeting room-478

EBUNGE top quality ergonomic desk chair directly sale for meeting room-479


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-480

EBUNGE top quality ergonomic desk chair directly sale for meeting room-481

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-482

EBUNGE top quality ergonomic desk chair directly sale for meeting room-483

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-484

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-485

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-486

EBUNGE top quality ergonomic desk chair directly sale for meeting room-487

EBUNGE top quality ergonomic desk chair directly sale for meeting room-488

EBUNGE top quality ergonomic desk chair directly sale for meeting room-489

EBUNGE top quality ergonomic desk chair directly sale for meeting room-490


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-491

EBUNGE top quality ergonomic desk chair directly sale for meeting room-492

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-493

EBUNGE top quality ergonomic desk chair directly sale for meeting room-494

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-495

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE top quality ergonomic desk chair directly sale for meeting room-496

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE top quality ergonomic desk chair directly sale for meeting room-497

EBUNGE top quality ergonomic desk chair directly sale for meeting room-498

EBUNGE top quality ergonomic desk chair directly sale for meeting room-499

EBUNGE top quality ergonomic desk chair directly sale for meeting room-500

EBUNGE top quality ergonomic desk chair directly sale for meeting room-501


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE top quality ergonomic desk chair directly sale for meeting room-502

EBUNGE top quality ergonomic desk chair directly sale for meeting room-503

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE top quality ergonomic desk chair directly sale for meeting room-504

EBUNGE top quality ergonomic desk chair directly sale for meeting room-505

Packing


EBUNGE top quality ergonomic desk chair directly sale for meeting room-506

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.


Comfort Folding Chairs Conference Room PP Frame Office Plastic Stackable Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.