EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE rolling partition wall supplier for function hall

EBUNGE rolling partition wall supplier for function hall

EBUNGE rolling partition wall supplier for function hall

Model
85 mm Gym movable partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Company Advantages
1. The production of EBUNGE commercial room partitions involves the following processes: the cutting of wall panels, primary steel fixings, steel beam clamps, and the fabrication of aluminum track. It can divide a large space into small spaces for effective space utilization
2. The product is increasingly becoming popular and has a wide range of applications. The product helps to create a multi-purpose room for multiple uses
3. The product is not prone to corrosion. It adopts anodized aluminum frames and aluminum trims, which are able to withstand the environmental elements. The product features a retractable performance
4. The product is stable enough. It utilizes grooves and interlocking steel pins for positive alignment of adjacent track sections and has been reinforced overhead by drop rod brackets. Multiple accessories of the product can be provided to the customers


Ballroom Soundproof Movable Walls Wooden Gym Partition Walls

EBUNGE rolling partition wall supplier for function hall-1

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable walls ONLY FOR $85.

 

85 mm movable partition walls ONLY FOR $98.

 

100 mm movable partition walls ONLY FOR $118.

 

125 ultra-high system movable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

EBUNGE rolling partition wall supplier for function hall-2

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of Gym movable partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The Gym movable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

EBUNGE rolling partition wall supplier for function hall-3
EBUNGE rolling partition wall supplier for function hall-4
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

EBUNGE rolling partition wall supplier for function hall-5

Components of Movable Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the gym movable partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the gym movable partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of restaurant sliding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE rolling partition wall supplier for function hall-6
EBUNGE rolling partition wall supplier for function hall-7
EBUNGE rolling partition wall supplier for function hall-8

Parking Styles of Movable Walls

As you know, when we do not use the gym movable partition walls, we can park them to the parking area. Actually there are many parking styles for the gym movable partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


EBUNGE rolling partition wall supplier for function hall-9
EBUNGE rolling partition wall supplier for function hall-10
EBUNGE rolling partition wall supplier for function hall-11



Different Finishes of Movable Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

EBUNGE rolling partition wall supplier for function hall-12
EBUNGE rolling partition wall supplier for function hall-13
EBUNGE rolling partition wall supplier for function hall-14
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of gym movable partition walls. The sliding partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

EBUNGE rolling partition wall supplier for function hall-15



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is technologically recognized in the field of rolling partition wall .
2. EBUNGE has been abiding by the rules of national room partition with door manufacturer. Contact!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...