EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE popular contemporary office desk for boardroom

EBUNGE popular contemporary office desk for boardroom

EBUNGE popular contemporary office desk for boardroom

Model
BG office workstations furniture
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office workstations furniture
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminumandboard
Finish: Melamine,fabric, veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Fireproof and eco-friendly
Size: Standard,as request
Color: Can be customized
Style: Modern
Product Details
BUNGE PARTITIONS's folding partition is processed based on advanced technology. It has excellent performances in the following details.BUNGE PARTITIONS's folding partition is manufactured in strict accordance with relevant national standards. Every detail matters in the production. Strict cost control promotes the production of high-quality and priced-low product. Such a product is up to customers' needs for a highly cost-effective product.
  • EBUNGE-4-8 Person Modular Office Face to Face Computer Tables Cubicles Workstations Furniture
Company Advantages
1. EBUNGE contemporary office desk is fabricated under the standardized production environment.
2. Our quality experts test this product for high performance.
3. The product is competitive in the market for its excellent performance and durability.
4. During the production process for contemporary office desk , Guangdong Bunge Building Material Industrial Co.,Ltd effectively control its quality.
5. EBUNGE has been attaching great importance to the contemporary office desk quality assurance to serve customers.

4-8 Person Modular Office Face to Face Computer Tables Cubicles Workstations Furniture

Office Furniture Deatils


 

1. The aluminium profile itself is 1.2mm-1.5mm, and finished patition thickness is 60mm and 30mm.


2. The office workstations furniture is made of panel, aluminum, glass, white board and others.


3. Different layout and dimensions can be made by customer's requests.


4. Colors of the partition and tabletop are subject to customer's requirements.


5. Matching prodcucts like movable/fixed pedestal, CPU Trolly, Keyboard Tray are available with us.


6. Different combination materials of the partition will be manufactured by your own will.


7. This type is a classical one and we have exported it to many Mid-Eastern countries.


8. Easy to install.


EBUNGE popular contemporary office desk for boardroom-1

Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

EBUNGE popular contemporary office desk for boardroom-2

Office Furniture Advantages

1--Office table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

EBUNGE popular contemporary office desk for boardroom-3


Office Furniture Finishing

There are 3 kinds of finishes to choose:

EBUNGE popular contemporary office desk for boardroom-4


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

EBUNGE popular contemporary office desk for boardroom-5


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

EBUNGE popular contemporary office desk for boardroom-6


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is defined as a famous contemporary office desk manufacturing and distribution company. We mainly provide innovative and high-performance products.
2. Guangdong Bunge Building Material Industrial Co.,Ltd possesses a powerful technical staff and advanced production equipment.
3. By applying compact office furniture into office dividers , EBUNGE has won much appreciation. Contact us! Looking ahead, EBUNGE has been devoted to offering the leading pc workstation desk to satisfy the pursuit of customers to reliable service. Contact us! Anytime necessary, Guangdong Bunge Building Material Industrial Co.,Ltd will be available to provide service online for customers. Contact us!

                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...