EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE movable walls series for restaurant

EBUNGE movable walls series for restaurant

EBUNGE movable walls series for restaurant

Model
85 mm movable partition walls system
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T or Western Union also welcomed
Delivery Time
15 - 20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity welcomed
Packing Details
Paper Carton, outside with wooden box
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition walls system
Feature: Sound proof
Finish: Melamine
Application: Meeting room partition walls
General use: Office furniture
Material: MDF + Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Company Advantages
1. The production process of EBUNGE residential movable walls involves coagulation, a process that curdles or thickens the polyisoprene into a mass. This process is accomplished by adding an acid. The product can far reach from one wall to another wall
2. The product has high commercial value to meet the demanding requirements of customers around the world. The product greatly highlights its easy installation
3. The product is fabricated under strict quality control and its quality is stable enough. Every corner and edge of the product are carefully processed
4. Multiple tests have been conducted in every production stage to ensure the consistent quality of the product. A magnetic strip is applied to the product to ensure strong functionality
5. The product has been accredited by authoritative third parties in all aspects, such as performance, durability, and reliability. It can divide a large space into small spaces for effective space utilization

Meeting Room Operable Accordion Sliding Partition Walls / Movable Partition Wall Systems for Office


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

EBUNGE movable walls series for restaurant-1

EBUNGE movable walls series for restaurant-2

EBUNGE movable walls series for restaurant-3

EBUNGE movable walls series for restaurant-4


Movable partition walls technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

EBUNGE movable walls series for restaurant-5


Movable partition walls features


1. The movable partition walls for office is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the movable partition walls for office can be customized, such as the size, the colors and the surfaces.

3. The movable partition walls for office can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

EBUNGE movable walls series for restaurant-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

EBUNGE movable walls series for restaurant-7


Movable partition walls packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

EBUNGE movable walls series for restaurant-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

EBUNGE movable walls series for restaurant-9



Company Features
1. Based on several years market research, and with its rich R&D strength, Guangdong Bunge Building Material Industrial Co.,Ltd has successfully developed movable walls in the field. The company has built up a clear and worthy customers base. We have carried out researches aiming to identify the targeted customers, cultural backgrounds, geographic locations, or other characteristics. These researches definitely help the company gain a deeper insight into their customer groups.
2. With advanced technology and production equipment, we can fully control the quality of our EBUNGE branded products.
3. We have a sound quality management system and complete quality inspection methods to ensure the EBUNGE's quality and reputation. Being recognized to be a dominant movable walls manufacturer is EBUNGE's goal. Call!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...