EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE movable walls factory direct supply for conference room

EBUNGE movable walls factory direct supply for conference room

EBUNGE movable walls factory direct supply for conference room

Model
85 mm sound proof partition
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T Western Union
Delivery Time
15-20 days
Supply Ability
50000 square merters per month
MOQ
No MOQ, small quantity welcomed
Packing Details
Paper carton, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Mobile partitions
Feature: Sound proof
Finish: Melamine
Application: Conference room partitions
General use: Office furniture
Material: MDF+Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Enterprise Strength
  • BUNGE PARTITIONS adheres to the service concept to be customer-oriented. We are widely recognized in the market due to quality products and excellent services.
Product Details
BUNGE PARTITIONS pays great attention to details of movable wall.BUNGE PARTITIONS has great production capability and excellent technology. We also have comprehensive production and quality inspection equipment. movable wall has fine workmanship, high quality, reasonable price, good appearance, and great practicality.
Company Advantages
1. The quality of EBUNGE movable partition wall systems complies with the standards in catering facilities industry. It has to go through the tests such as heavy metal content required by the Food Regulatory Authority.
2. The product is not prone to corrosion. It adopts anodized aluminum frames and aluminum trims, which are able to withstand the environmental elements.
3. Comprehensive solutions about movable walls can be provided by our professional service team.
4. Guangdong Bunge Building Material Industrial Co.,Ltd has excellent communication skills and positive team spirit.

Conference Room Movable Acoustic Walls Sliding Folding Classroom Mobile Partitions

Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

EBUNGE movable walls factory direct supply for conference room-1

EBUNGE movable walls factory direct supply for conference room-2

EBUNGE movable walls factory direct supply for conference room-3

EBUNGE movable walls factory direct supply for conference room-4

Mobile Partitions technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

EBUNGE movable walls factory direct supply for conference room-5


Mobile Partitions walls features


1. The mobile partitions walls  is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the mobile partitions walls can be customized, such as the size, the colors and the surfaces.

3. The mobile partitions walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

EBUNGE movable walls factory direct supply for conference room-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

EBUNGE movable walls factory direct supply for conference room-7

Mobile Partitions Walls  packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

EBUNGE movable walls factory direct supply for conference room-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

EBUNGE movable walls factory direct supply for conference room-9







Company Features
1. EBUNGE functions as an advanced movable walls supplier in the market.
2. Over the years, with increased market share, we have a sales network covering many countries around the world. We are now expanding more channels to market the products.
3. We’re constantly striving to improve the products we supply, the services we deliver and the positive impact we make. Our mission is not just to succeed in this market. We aim to lead it towards a more ethical future. Inquiry! Sustainability is the key to our operation. We work hard to create systems that minimize our impact on the environment by limiting waste and using resources efficiently.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...