EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE movable partition wall directly sale for hotel

EBUNGE movable partition wall directly sale for hotel

EBUNGE movable partition wall directly sale for hotel

Model
85 mm sound proof partitions
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union
Delivery Time
15-20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ,small quantity welcomed
Packing Details
Paper carton, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Removable wall partitions
Feature: Sound proof
Finish: Melamine
Application: Conference room partitions
General use: Office furniture
Material: MDF+ Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Product Details
BUNGE PARTITIONS pays great attention to details of operalbe wall.BUNGE PARTITIONS carries out strict quality monitoring and cost control on each production link of operalbe wall, from raw material purchase, production and processing and finished product delivery to packaging and transportation. This effectively ensures the product has better quality and more favorable price than other products in the industry.
  • application-movable wall- folding partition-operalbe wall-EBUNGE-img-1
Company Advantages
1. EBUNGE interior partition wall design is precisely manufactured using leading-edge production techniques in line with the current market standards.
2. Owing to its reliability, the product is not subject to the jamming signal or noise caused by its inner components.
3. All the features make this product highly demanded on the market.

Acoustic Moveable Removable wall partitions Walls FoldableWalls for Conference Room


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

EBUNGE movable partition wall directly sale for hotel-1

EBUNGE movable partition wall directly sale for hotel-2

EBUNGE movable partition wall directly sale for hotel-3

EBUNGE movable partition wall directly sale for hotel-4


Sound proof partitions technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

EBUNGE movable partition wall directly sale for hotel-5


Removable wall partitions Walls features


1. The  removable wall partitions is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the removable wall partitions wallscan be customized, such as the size, the colors and the surfaces.

3. The  removable wall partitions walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

EBUNGE movable partition wall directly sale for hotel-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

EBUNGE movable partition wall directly sale for hotel-7


 Meeting Room Partition Walls packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

EBUNGE movable partition wall directly sale for hotel-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

EBUNGE movable partition wall directly sale for hotel-9






Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has been focusing on the movable partition wall business for many years.
2. EBUNGE is highly recognized for its well-made products.
3. With the support of professional team, EBUNGE has won much recognition. Call now! It is indispensable for EBUNGE to develop its enterprise culture. Call now!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...