EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE movable partition

EBUNGE movable partition

EBUNGE movable partition

Model
Office conference table
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
500 Set/Sets per Month
MOQ
No MOQ
Packing Details
Carton packing with wooden frame
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office conference table
Feature: Fine Workmanship
Finish: Melamine,MFC board
Application: Conference room,meeting room,office
General use: Office furniture
Material: MFC board
Function: Fireproof and eco-friendly Divide space
Size: 2400*1200*750 mm
Color: Can be customized
Style: Modern style
Product Details
With the pursuit of perfection, BUNGE PARTITIONS exerts ourselves for well-organized production and high-quality operalbe wall.BUNGE PARTITIONS insists on the use of high-quality materials and advanced technology to manufacture operalbe wall. Besides, we strictly monitor and control the quality and cost in each production process. All this guarantees the product to have high quality and favorable price.
Enterprise Strength
  • BUNGE PARTITIONS has built a sound service system to provide one-stop services such as product consultation, professional debugging, skills training, and after-sales service.
Company Advantages
1. EBUNGE movable partition is manufactured by our competent workforce utilizing well-tested material and sophisticated technology following the set norms of the industry.
2. movable partition has the superiority such as foldable partition doors as compared with other similar products.
3. Guangdong Bunge Building Material Industrial Co.,Ltd has repeatedly experience of movable partition in the industry.
4. As one of the leading movable partition supplier, EBUNGE supplies the best movable partition for customers.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

Description


Conference table has special from others, that is all the edges sealed with high quality PVC 2 mm , the glue used for the laminated which is imported from Germany , friendly for the environment .All the hardware parts are good quality ,strong and durable.


EBUNGE movable partition-1


EBUNGE movable partition-2

EBUNGE movable partition-3

EBUNGE movable partition-4

Technical information

 

PRODUCT  NAME

Conference table

MODELN   NO.

BUNGE conference table

DIMENSION

Standard sizeor as your require

FEATURE

Style: Meeting table Advantages
1. Squared shape Meeting table.

2. Surface material: Veneer surface thickness for 0.3-0.6mm

3. Veneer material can choose walnut/beech/cherry/oak etc. 

4. Basic material: MDF Veneer.

5. Tabletop normal thickness for 25mm-70mm, Special thickness as your requirement.

6. Expandable and available in numerous sizes.

7. Wire management, hardware accessories are BMB.

PACKING

1.KD(knock down).

2.REGULAR 7 YEARS EXPORT STANDARD PACKAGE.

3.MAINLY WITH CARTON,NECESSARY PROTECTION MATERIAL INSIDE.

TERMS OF PAYMENT

FOB, T/T (30% IN ADVANCE), CIF, EXW. western union money gram

PORT

GUANGZHOU

DELIVERY TIME

8-25 DAYS ONCE ORDER CONFINE  AND RECEIPT OF ADVANCED PAYMENT


 EBUNGE movable partition-5

Advantage

1--Office table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installation, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.


 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-6

 


Packing

 

EBUNGE movable partition-7

Factory show


EBUNGE movable partition-8

Our service

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-9 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-10EBUNGE movable partition-11EBUNGE movable partition-12

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-13

 

Packing details:

 

 

 

EBUNGE movable partition-14

 EBUNGE movable partition-15

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office ch

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-16 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-17EBUNGE movable partition-18EBUNGE movable partition-19

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-20

 

Packing details:

 

 

 

EBUNGE movable partition-21

 EBUNGE movable partition-22

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-23 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-24EBUNGE movable partition-25EBUNGE movable partition-26

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-27

 

Packing details:

 

 

 

EBUNGE movable partition-28

 EBUNGE movable partition-29

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-30 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-31EBUNGE movable partition-32EBUNGE movable partition-33

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-34

 

Packing details:

 

 

 

EBUNGE movable partition-35

 EBUNGE movable partition-36

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-37 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-38EBUNGE movable partition-39EBUNGE movable partition-40

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-41

 

Packing details:

 

 

 

EBUNGE movable partition-42

 EBUNGE movable partition-43

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-44 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-45EBUNGE movable partition-46EBUNGE movable partition-47

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-48

 

Packing details:

 

 

 

EBUNGE movable partition-49

 EBUNGE movable partition-50

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-51 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-52EBUNGE movable partition-53EBUNGE movable partition-54

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-55

 

Packing details:

 

 

 

EBUNGE movable partition-56

 EBUNGE movable partition-57

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-58 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-59EBUNGE movable partition-60EBUNGE movable partition-61

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-62

 

Packing details:

 

 

 

EBUNGE movable partition-63

 EBUNGE movable partition-64

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-65 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-66EBUNGE movable partition-67EBUNGE movable partition-68

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-69

 

Packing details:

 

 

 

EBUNGE movable partition-70

 EBUNGE movable partition-71

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-72 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-73EBUNGE movable partition-74EBUNGE movable partition-75

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-76

 

Packing details:

 

 

 

EBUNGE movable partition-77

 EBUNGE movable partition-78

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-79 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-80EBUNGE movable partition-81EBUNGE movable partition-82

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-83

 

Packing details:

 

 

 

EBUNGE movable partition-84

 EBUNGE movable partition-85

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-86 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-87EBUNGE movable partition-88EBUNGE movable partition-89

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-90

 

Packing details:

 

 

 

EBUNGE movable partition-91

 EBUNGE movable partition-92

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-93 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-94EBUNGE movable partition-95EBUNGE movable partition-96

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-97

 

Packing details:

 

 

 

EBUNGE movable partition-98

 EBUNGE movable partition-99

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-100 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-101EBUNGE movable partition-102EBUNGE movable partition-103

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-104

 

Packing details:

 

 

 

EBUNGE movable partition-105

 EBUNGE movable partition-106

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-107 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-108EBUNGE movable partition-109EBUNGE movable partition-110

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-111

 

Packing details:

 

 

 

EBUNGE movable partition-112

 EBUNGE movable partition-113

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-114 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-115EBUNGE movable partition-116EBUNGE movable partition-117

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-118

 

Packing details:

 

 

 

EBUNGE movable partition-119

 EBUNGE movable partition-120

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-121 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-122EBUNGE movable partition-123EBUNGE movable partition-124

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-125

 

Packing details:

 

 

 

EBUNGE movable partition-126

 EBUNGE movable partition-127

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-128 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-129EBUNGE movable partition-130EBUNGE movable partition-131

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-132

 

Packing details:

 

 

 

EBUNGE movable partition-133

 EBUNGE movable partition-134

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-135 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-136EBUNGE movable partition-137EBUNGE movable partition-138

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-139

 

Packing details:

 

 

 

EBUNGE movable partition-140

 EBUNGE movable partition-141

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-142 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-143EBUNGE movable partition-144EBUNGE movable partition-145

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-146

 

Packing details:

 

 

 

EBUNGE movable partition-147

 EBUNGE movable partition-148

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-149 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-150EBUNGE movable partition-151EBUNGE movable partition-152

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-153

 

Packing details:

 

 

 

EBUNGE movable partition-154

 EBUNGE movable partition-155

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-156 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-157EBUNGE movable partition-158EBUNGE movable partition-159

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-160

 

Packing details:

 

 

 

EBUNGE movable partition-161

 EBUNGE movable partition-162

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-163 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-164EBUNGE movable partition-165EBUNGE movable partition-166

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-167

 

Packing details:

 

 

 

EBUNGE movable partition-168

 EBUNGE movable partition-169

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-170 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-171EBUNGE movable partition-172EBUNGE movable partition-173

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-174

 

Packing details:

 

 

 

EBUNGE movable partition-175

 EBUNGE movable partition-176

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-177 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-178EBUNGE movable partition-179EBUNGE movable partition-180

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-181

 

Packing details:

 

 

 

EBUNGE movable partition-182

 EBUNGE movable partition-183

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-184 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-185EBUNGE movable partition-186EBUNGE movable partition-187

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-188

 

Packing details:

 

 

 

EBUNGE movable partition-189

 EBUNGE movable partition-190

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-191 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-192EBUNGE movable partition-193EBUNGE movable partition-194

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-195

 

Packing details:

 

 

 

EBUNGE movable partition-196

 EBUNGE movable partition-197

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-198 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-199EBUNGE movable partition-200EBUNGE movable partition-201

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-202

 

Packing details:

 

 

 

EBUNGE movable partition-203

 EBUNGE movable partition-204

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-205 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-206EBUNGE movable partition-207EBUNGE movable partition-208

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-209

 

Packing details:

 

 

 

EBUNGE movable partition-210

 EBUNGE movable partition-211

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-212 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-213EBUNGE movable partition-214EBUNGE movable partition-215

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-216

 

Packing details:

 

 

 

EBUNGE movable partition-217

 EBUNGE movable partition-218

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-219 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-220EBUNGE movable partition-221EBUNGE movable partition-222

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-223

 

Packing details:

 

 

 

EBUNGE movable partition-224

 EBUNGE movable partition-225

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-226 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-227EBUNGE movable partition-228EBUNGE movable partition-229

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-230

 

Packing details:

 

 

 

EBUNGE movable partition-231

 EBUNGE movable partition-232

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-233 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-234EBUNGE movable partition-235EBUNGE movable partition-236

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-237

 

Packing details:

 

 

 

EBUNGE movable partition-238

 EBUNGE movable partition-239

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-240 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-241EBUNGE movable partition-242EBUNGE movable partition-243

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-244

 

Packing details:

 

 

 

EBUNGE movable partition-245

 EBUNGE movable partition-246

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-247 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-248EBUNGE movable partition-249EBUNGE movable partition-250

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-251

 

Packing details:

 

 

 

EBUNGE movable partition-252

 EBUNGE movable partition-253

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-254 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-255EBUNGE movable partition-256EBUNGE movable partition-257

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-258

 

Packing details:

 

 

 

EBUNGE movable partition-259

 EBUNGE movable partition-260

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-261 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-262EBUNGE movable partition-263EBUNGE movable partition-264

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-265

 

Packing details:

 

 

 

EBUNGE movable partition-266

 EBUNGE movable partition-267

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-268 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-269EBUNGE movable partition-270EBUNGE movable partition-271

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-272

 

Packing details:

 

 

 

EBUNGE movable partition-273

 EBUNGE movable partition-274

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-275 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-276EBUNGE movable partition-277EBUNGE movable partition-278

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-279

 

Packing details:

 

 

 

EBUNGE movable partition-280

 EBUNGE movable partition-281

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-282 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-283EBUNGE movable partition-284EBUNGE movable partition-285

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-286

 

Packing details:

 

 

 

EBUNGE movable partition-287

 EBUNGE movable partition-288

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-289 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-290EBUNGE movable partition-291EBUNGE movable partition-292

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-293

 

Packing details:

 

 

 

EBUNGE movable partition-294

 EBUNGE movable partition-295

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-296 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-297EBUNGE movable partition-298EBUNGE movable partition-299

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-300

 

Packing details:

 

 

 

EBUNGE movable partition-301

 EBUNGE movable partition-302

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-303 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-304EBUNGE movable partition-305EBUNGE movable partition-306

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-307

 

Packing details:

 

 

 

EBUNGE movable partition-308

 EBUNGE movable partition-309

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.

4. Warranty is about 3-5 years to supply service.

Modern Commercial Furniture MFC Melamine Wooden Office Conference Table for Boardroom

 

Description:

 

Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.

 

For different group of people,we show ingenuity in the structure,functions,comfort,materials and coloramercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.

 

Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.

 

EBUNGE movable partition-310 

 

Technical information:

 

Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:

 

1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package

 

 

EBUNGE movable partition-311EBUNGE movable partition-312EBUNGE movable partition-313

 

Feature:

 

Wearable, decay resistant, fire resistance, inapt to deform, easy to clean, non-toxic, extremely hard, matte surface invariable effect.

 

 Main surface:

 

1. Smooth surface finish.

2. Environment-friendly PE painting.

3. Detailed finishing process ensuring the compromised quality and consistent beauty.

 

EBUNGE movable partition-314

 

Packing details:

 

 

 

EBUNGE movable partition-315

 EBUNGE movable partition-316

 

Our service:

 

1. High quality at cost effective price.

2. Custom design and manufacturing according to your CAD drawing.

3. One-step full package office furniture solution:

Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.