EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE movable partition

EBUNGE movable partition

EBUNGE movable partition

Model
Office stackable chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office stackable chair
Feature: Office Sitting Chairs
Finish: Fabric, pu leather, mesh
Application: Office, conference room and etc
General use: Office furniture
Material: PP material
Function: Office Sitting Chairs
Size: 480*470*790 mm
Color: Can be customized
Style: Modern style
Product Details
BUNGE PARTITIONS's movable wall has excellent performances, which are reflected in the following details.BUNGE PARTITIONS is certified by various qualifications. We have advanced production technology and great production capability. movable wall has many advantages such as reasonable structure, excellent performance, good quality, and affordable price.
Product Comparison
operalbe wall, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market.operalbe wall's outstanding advantages are as follows.
Company Advantages
1. EBUNGE style movable partitions has gone through many stages before production is completed. These stages include design, stamping, sewing, etc.
2. The product is not prone to corrosion. It adopts anodized aluminum frames and aluminum trims, which are able to withstand the environmental elements.
3. Accurate market positioning of Guangdong Bunge Building Material Industrial Co.,Ltd allows you the biggest order discount and highest return on investment.
4. With the fast development of the industry, the demand of the product is further increased.

Office Furniture Desk Modern Design Children Study Fabric Stackable Plastic Office Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE movable partition-1

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE movable partition-2

EBUNGE movable partition-3

EBUNGE movable partition-4

EBUNGE movable partition-5

EBUNGE movable partition-6


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE movable partition-7

EBUNGE movable partition-8

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE movable partition-9

EBUNGE movable partition-10

Packing


EBUNGE movable partition-11

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.




Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is an foreign owned enterprise primarily manufacturing high quality movable partition.
2. Our production base has advanced machines and equipment. They can meet special quality, high volume requirements, single production runs, short lead times, etc.
3. To be one of the advanced movable partition manufacturer is the hope of EBUNGE. Inquire! EBUNGE concentrates on providing high quality service for customers. Inquire!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...