EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE modular office furniture series for office

EBUNGE modular office furniture series for office

EBUNGE modular office furniture series for office

Model
BG modular office workstations
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Modular office workstations
Feature: Eco-friendly
Finish: Melamine,veneer,metal
Application: Office,conference room,meeting room
General use: Office furniture
Material: MFC Board
Function: Office Work,office partitions
Size: Accept customized
Color: Can be customized
Style: Modern
Application Scope
office furniture produced by BUNGE PARTITIONS is mostly used in the following aspects.BUNGE PARTITIONS insists on providing customers with reasonable solutions according to their actual needs.
  • EBUNGE-modular office furniture | Office Furniture | EBUNGE
Product Comparison
movable walls is a truly cost-effective product. It is processed in strict accordance with relevant industry standards and is up to the national quality control standards. The quality is guaranteed and the price is really favorable.Compared with products in the same category, movable walls we produce is equipped with the following advantages.
  • EBUNGE-modular office furniture | Office Furniture | EBUNGE-1
    EBUNGE-modular office furniture | Office Furniture | EBUNGE-2
Company Advantages
1. The components of EBUNGE high quality office furniture have undergone a series of strict inspections including discharge ports and suction ports, cleaning suction filters, and pressure and temperature sensors.
2. modular office furniture , which can high quality office furniture , is featured with office workstation desk .
3. Performance and advantages of modular office furniture : high quality office furniture .
4. There is no set purpose for this product; It is designed to make a smooth, stylish, ergonomic addition to any environment.

Modern Conference Room Modular Workstations, Tables and Cubicles for office

Office Workstations Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

EBUNGE modular office furniture series for office-1


Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

EBUNGE modular office furniture series for office-2

Office Workstations Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office workstations should be tested before delivering out producing workshop.

EBUNGE modular office furniture series for office-3


Office Workstations Finishing

There are 3 kinds of finishes to choose:

EBUNGE modular office furniture series for office-4


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

EBUNGE modular office furniture series for office-5


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

EBUNGE modular office furniture series for office-6



Company Features
1. Numerous patents are held in Guangdong Bunge Building Material Industrial Co.,Ltd.
2. Our technology takes the lead in the industry of modular office furniture .
3. EBUNGE believes it is important to take the scientific development as the basis during the production. Check now! Guangdong Bunge Building Material Industrial Co.,Ltd aims to improve people’s lives through meaningful innovation on 4 person workstation desk . Check now! Guangdong Bunge Building Material Industrial Co.,Ltd regards high quality office furniture as the hallmark. Check now! Facing the future, EBUNGE has established the general idea of office partitions . Check now!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...