EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE hanging system portable partition wall systems factory direct supply for conference room

EBUNGE hanging system portable partition wall systems factory direct supply for conference room

EBUNGE hanging system portable partition wall systems factory direct supply for conference room

Model
85 mm sliding folding partitions
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding folding partition wall
Feature: Sound proofing
Aluminium frame thickness: Less than 5 m
Partition material: 800 - 1200 mm
Finish: Mdf bare finish,melamine
Application: Restaurant,hotel,classroom
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendlyDivide space
Size: 2440*133 mm, 2440*197 mmThickness 83 mm
Color: Multi color
Style: Sliding
Product Details
To better learn about movable walls, BUNGE PARTITIONS will provide detailed pictures and detailed information in the following section for your reference.movable walls has the following advantages: well-chosen materials, reasonable design, stable performance, excellent quality, and affordable price. Such a product is up to the market demand.
  • EBUNGE-portable partition wall systems | Folding Partitions | EBUNGE
Company Advantages
1. EBUNGE portable partition wall systems is manufactured under modern management system.
2. The product is stable enough. It utilizes grooves and interlocking steel pins for positive alignment of adjacent track sections and has been reinforced overhead by drop rod brackets.
3. The product features high acoustic insulation. It has achieved sound insulation values of up to 57 dB with interlocking corner construction.
4. With strong technical force and rich experience, Guangdong Bunge Building Material Industrial Co.,Ltd provides quality services to moveable walls industry.
5. Guangdong Bunge Building Material Industrial Co.,Ltd will continue to provide its customers and partners with its expertise and state-of-the-art moveable walls .

Sound Proof Moveable Doors/Acoustic Sliding Folding Partitions

MAIN TITLE
EBUNGE hanging system portable partition wall systems factory direct supply for conference room-1

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

EBUNGE hanging system portable partition wall systems factory direct supply for conference room-2

Description


Sound proofing partition wall is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Sliding partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


EBUNGE hanging system portable partition wall systems factory direct supply for conference room-3EBUNGE hanging system portable partition wall systems factory direct supply for conference room-4EBUNGE hanging system portable partition wall systems factory direct supply for conference room-5
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Soundproofing partition wall has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

EBUNGE hanging system portable partition wall systems factory direct supply for conference room-6EBUNGE hanging system portable partition wall systems factory direct supply for conference room-7

EBUNGE hanging system portable partition wall systems factory direct supply for conference room-8

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE hanging system portable partition wall systems factory direct supply for conference room-9EBUNGE hanging system portable partition wall systems factory direct supply for conference room-10

Movable partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


EBUNGE hanging system portable partition wall systems factory direct supply for conference room-11

EBUNGE hanging system portable partition wall systems factory direct supply for conference room-12EBUNGE hanging system portable partition wall systems factory direct supply for conference room-13

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


EBUNGE hanging system portable partition wall systems factory direct supply for conference room-14


Packing & shipping


Soundproofing partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


EBUNGE hanging system portable partition wall systems factory direct supply for conference room-15EBUNGE hanging system portable partition wall systems factory direct supply for conference room-16

EBUNGE hanging system portable partition wall systems factory direct supply for conference room-17



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a particularly famous moveable walls manufacturer.
2. We have professional technicians to produce finest folding room dividers .
3. Guangdong Bunge Building Material Industrial Co.,Ltd actively contributes to the industry, be proud of the work, and be proud of the achievements. Inquire now! EBUNGE has made up its mind to win the folding partition walls for home market. Inquire now! Our customers can trust the great power of Guangdong Bunge Building Material Industrial Co.,Ltd. Inquire now! EBUNGE brand aims to provide high quality service for customers. Inquire now!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...