EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE hall partition factory price for meeting room

EBUNGE hall partition factory price for meeting room

EBUNGE hall partition factory price for meeting room

Model
65 series movable partition wall
Brand Name
BUNGE
Year of Establishment
Eight
Original
China(mainland)
Payment Terms
T/T,D/A,D/P,L/C,Western Union
Delivery Time
20 days
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Partition board paper packaging, and finally packed in wooden carton.
OEM/ODM
OEM / ODM
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition wall
Feature: Sliding,Movable,Folding,Soundproof,Operable
Aluminium frame thickness: Aluminum Frame
Partition material: Wooden ,Aluminum
Finish: Melamine,Fabric,Leather,MDF
Application: Office,Hotel,Banquet Hall,School
General use: Office furniture
Material: Wooden
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 65 mm
Function: Soundproof and Divide space
Size: Up to 4000 mm Height
Color: Can be customized
Style: Sliding Movable
Product Comparison
Closely following the market trend, BUNGE PARTITIONS uses advanced production equipment and manufacturing technology to produce movable wall. The product receives favors from the majority of customers for the high quality and favorable price.Compared with other products in the same category, movable wall has the following major features.
  • product-EBUNGE-img
    product-EBUNGE-img
Company Advantages
1. EBUNGE retractable walls commercial provides advanced product design and reasonable structure.
2. This product is strongly resistant to moisture. It will not be affected by water which will provide fertile grounds for germs and molds.
3. The product prevents odor. Processed by antibacterial and stink remover agents, it can effectively kill odor-causing bacteria and eliminates foot and shoe odor.
4. People will find it very useful no matter in their home items or commercial use. It brings much convenience for handling trivial things.
5. The product is extremely easy to clean and maintain and can be cleaned with normal soap or a cleaning liquid.
BUNGE movable wall description

Bunge office partition ( Movable wall partition ) is made of high quality Anodized Aluminum frame with composite materials.the panel has a standard thickness of 65mm/85mm/100mm and a width up to 1200mm.Maximum height can reach 12000mm ( type 100) tall. its vertical seal. together with the horizontal top and bottom retractable seals provide excellent acoustic insulation property of maximum STC-(32~55) in laboratory setting. Its excellent acoustic insulation property and maximum reach allow it to be used in demanding locations such as function rooms in starred hotels and convention centers.The panels move on a ceiling track with no requirement of floor guides or rails.The movable partitions consist of a series of interlocking flat panels and the fast set retractable top and bottom seals provide the easiest in-field operation - a simple half-turn of the waist high removable handle extends or retracts the sound seals.

EBUNGE hall partition factory price for meeting room-1

Features & Benefits

Features & Benefits

Movable, top hung system without the need for a floor track
Retractable top and bottom seals ensure effortless movement of panels
Combines elegance with robust construction
Concealed or exposed panel edge profiles
Numerous panel stacking options for complete flexibility
Sealed for life roller assemblies provide smooth and silent movement
The system offers various levels of sound reduction
Available in a wide range of colors and finishes, including:
Vinyl, fabric, Leather,
Natural wood veneer, Melamine,
Wood moldings, etc.

EBUNGE hall partition factory price for meeting room-2

We Offer

Time is Money – Quick and clean installation guarantees you faster occupancy with no downtime or intrusions to your daily business.
No Construction Headaches – Our modular wall systems are built under factory-controlled conditions which yields a superior product and the right parts every time.
Professional Installation – Our enginner can go to local installation
No Expensive Architects Needed – We provide cost free CAD design so that your modular wall system solution will meet the special design criteria of your job.
Risk Free – Our 10-year warranty on materials and 1-year warranty on labor guarantee our modular wall systems supply years of problem free service.
Never Lose Your Investment – 100% reusable and reconfigurable, excellent ROI.
Saves Valuable Time – NO messy patching or painting, virtual maintenance free. Everything is prefabricated and prefinished at our factories.

Case Show

Application:

All products are suitable for hotel, conference room, multi-function hall, exhibition hall, library, museum, culture square, gymnasium, training institution, office, school, KTV, hospital, shopping market, etc

EBUNGE hall partition factory price for meeting room-3

About Us

About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m2. And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system , and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries.

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply Free design to every client and we will reply in 12 hours if the clients have any questions.


EBUNGE hall partition factory price for meeting room-4



Company Features
1. Due to the development of a strict management system, EBUNGE has made great progress in the retractable walls commercial industry.
2. EBUNGE has been focusing on the optimization of hall partition making it a strong core for the scientific development of the company.
3. Our company engages in sustainable management. We view the social challenges for SDGs and other initiatives as business opportunities, promote innovation, minimize future risks, and reinforce management resilience. Our company takes pride in using low-impact manufacturing processes to create products that safeguard our food and water, lower dependence on energy, and enhance green initiatives.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...