EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE glass partition wholesale for office

EBUNGE glass partition wholesale for office

EBUNGE glass partition wholesale for office

Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable glass partition wall
Aluminium frame thickness: 10/12 mm tempered glass
Application: Conference room,office,classroom and etc
General use: Office furniture
Material: Tempered,laminated,Low-e/reflective/tempered glass
Function: Fireproof and eco-friendly Divide space
Size: 2440*133 mm, 2440*197 mm Thickness 83 mm
Color: Multi color
Style: Sliding and folding
Application Scope
operalbe wall produced by BUNGE PARTITIONS is mainly used in the following fields.BUNGE PARTITIONS insists on providing customers with reasonable solutions according to their actual needs.
Company Advantages
1. Guangdong Bunge Building Material Industrial Co.,Ltd has been devoting to the design of glass partition to make it attractive.
2. To ensure the quality of this product, EBUNGE has guaranteed each phrase in a good condition.
3. With this product in place, business owners will likely see a decrease in workplace accidents and workman’s compensation claims.

Sliding Aluminium Frame Office Movable Glass Partition Wall


Attention
EBUNGE glass partition wholesale for office-1

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

EBUNGE glass partition wholesale for office-2


Description


Sliding glass panels are suspended from an overhead track and carrier system .There is no floor tracks or guides are needed.However, the panels require floor pins and receptacles in the floor to keep them secure in the opening.

 

Sliding glass walls are made from a sheet of glass attached to top and bottom aluminum horizontal rails.The panel are shipped fully assembled.

 

Our factory glazing consists of 10 mm or 12 mm tempered clear glass.An optional acid washed. An optional acid washed, satiny translucent or frosted glass is also available. The glass may also be etched or decals added.

 

The glass edges are polished for a smooth finish.There is a 6-12mm gap between panels to prevent the edges from touching. The size of the gap varies due to glass tolerances.


EBUNGE glass partition wholesale for office-3


Technical information


Product Name

Movable Glass Partition

Material

Aluminium Frame +Glass;Glass

Door panel of 

Maximum Weight

80KG

Description

1.Glass screen divided into two kinds of box- and frameless glass type and thickness of 12mm,with steel bolt fixed.

2.For height is 2m-3.6m,largest rail loading is 450KG/m,screen does not have sound capabilities.

Installation method

Slide type,curve type and folding type.

Glass Thickness

10mm-12mm

Door panel of 

Maximum Width

900mm

Door panel of 

Maximum high

2800mm

Period for delivery

30 days


EBUNGE glass partition wholesale for office-4


Feature


1.Sliding glass partition has heavy-capacity rail to secure the partition.


2.Precision welding between tracks to reduce maintenance rate.


3.Tempered glass, simple and bright.


4.The upper and lower aluminum glass partition clips are designed as curved shapes.


5.The glass is fixed by drilling it into the clips, ensuring safety and durability.


6.The lock with hidden blots incorporates a fixing and closing function for the partition.


EBUNGE glass partition wholesale for office-5


Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE glass partition wholesale for office-6

EBUNGE glass partition wholesale for office-7



Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


EBUNGE glass partition wholesale for office-8

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


EBUNGE glass partition wholesale for office-9EBUNGE glass partition wholesale for office-10

EBUNGE glass partition wholesale for office-11



                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. With a strong developing and manufacturing foundation, Guangdong Bunge Building Material Industrial Co.,Ltd has been devoted to offering high quality glass partition systems for years.
2. We have a stable presence in the USA, Australia, and some Europe markets. Our competence in the overseas market has obtained recognization.
3. Creating value for customer is Guangdong Bunge Building Material Industrial Co.,Ltd's unremitting dream! Contact us! The enterprise mission of Guangdong Bunge Building Material Industrial Co.,Ltd is to focus on innovation, to create customer trustworthy glass partition products. Contact us! In order to accelerate the development of EBUNGE, it is necessary to always put customers first and quality foremost. Contact us! With the accelerating process of society,EBUNGE will follow the trend and work hard to supply better glass partition. Contact us!

                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...