EBUNGE  > 

AI - Page Sitemap

 > 

EBUNGE durable office chair personalize for office

EBUNGE durable office chair personalize for office

EBUNGE durable office chair personalize for office

Model
Office chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office chair
Feature: Swivel Seat
Finish: Fabric, pu leather, mesh
Application: Office, conference room and etc
General use: Office furniture
Material: Fabric,Nylon
Function: Fireproof and eco-friendly Divide space
Size: Custom designed size
Color: Multi color
Style: Modern style
Company Advantages
1. Featuring high luminous efficiency and long lifespan, EBUNGE comfortable office chair is developed by our R&D team who has spent a lot of time improving its luminous performance. It is highly recognized for its excellent thermal insulation property
2. This product is increasingly used in the market due to its significant economic benefits. Equipped with a sealing device, the product is praised for its tight sealing performance
3. Apart from the advantage of comfortable office chair , our produced office chair has some unparalleled dominance. It will be safely packaged in a carton box and a wooden box
4. office chair is comfortable office chair , and is a guide for executive office chair industry. It displays a gorgeous and delicate appearance

Office Furniture Fabric Office Chair Metal Frame Comfortable Office Mesh Chair Executive


Description:


Office chair applies the ergonomic principles for the design of cushion,backrest and headrest to comply with body curve of sitting position and habits and provide comfortable supporting and seating experiences.


For different group of people,we show ingenuity in the structure,functions,comfort,materials and color amercement of office chairs. For example,in the ergonomic design of office chairs,we adjust the angle of force loading for the neck and back to relive the fatigue of shoulder and neck after sitting for prolonged periods.


Inhering the humanized concept the relied on ergonomics,each office chair perfectly combines the international aviation aluminum material and nylon,which is the new favorite and environmentally friendly health chair for family, entertainment and office work.


EBUNGE durable office chair personalize for office-1


Technical information:


Product Type:Office Chair
Material:

1.Mesh Back

2.Seat: Molded Sponge With Fabric

3.Synchronous Tilting Chassis,Tilting Elasticity Adjustment

4.Adjustable

5.3D Armrest And PU Armrest Panel

6.Polishing Aluminum Alloy Metal Feet

Color:Back and seat color can be custom designed
Warranty:5-10 Years
Package:


1 piece/carton

Knock down packing, inner with Bubble bags and anti-ash package




EBUNGE durable office chair personalize for office-2


Office chair function &feature:


(1)Ergonomically designed for lasting comfort,you can adjust the backrest to any position up to 45 degrees.


(2)Fire-Resistance mesh fabric upholstered, different colors for option.


(3)3D adjustable armrest.


(4)Multifunctional tilt mechanism.


(5)Imported gas lift.


(6)Aluminum base.


(7PU plastic castors.


(8)Waterfall seat edge helps relieve pressure points on legs.


EBUNGE durable office chair personalize for office-3


Office chair advantage:


1.360 degree swivel function.


2.Good durabilty with breath ability.


3.Easily cleaned.


4.Strong 5 castor-wheel base.


5.Color can be changed according to customer requirement.


EBUNGE durable office chair personalize for office-4


Packing and shipping:


Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.



1.For mass production big quantity by sea : We've cooperated with our shipping forwarder for many years, and
they can offer us the competitive price by the vessels such as PIL, APL, OOCL, CSCL, MSC and CMA and so on.


2.Import taxes : We can help you reduce and avoid import taxes by declaring prices low.


EBUNGE durable office chair personalize for office-5


Our service:


1. High quality at cost effective price.


2. Custom design and manufacturing according to your CAD drawing.


3. One-step full package office furniture solution:


Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.


4. Warranty is about 5-10 years to supply service.



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a comprehensive enterprise integrating R&D and production.
2. We have teams of professionals to engage in product design and production. They are project managers, technical workers, designers, and production workers. Every one of them has specific knowledge and expertise in this industry.
3. We are committed to a sustainable future. We’re now working on a number of initiatives to reduce production waste at the source.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...